World Bank Document

World Bank Document

YEREVAN WATER & WASTEWATER PROJECT CREDIT 4038-AM PROCUREMENT PLAN YWWP - Procurement plan Year 1,2,3,4 as of Decemebr 17, 2009 YWWP Procurement Identification Bidding Process Contract Implementation Investment Description Prior / Invitation Bid opening Contract signing Initial Contract Completion Proc. Initial Contract Price in Plan Type Contract No Post Supplier/ Contractor Contract Price Contract name Method Planned Actual Planned Actual Planned Actual original currency Planned Expenditure (USD) A - Energy saving Sensus Metering A1 Purchase of 29 borehole meters and ancillaries G YWWP/BHMeters/07 Shopping Post 12/12/06 29/01/07 23/01/07 01/03/07 28/02/07 18/05/07 20,163.96 € 15,263 30/06/07 System(Slovakia) A1 Purchase of 4 sets borehole pumps and ancillaries G YWWP/BoreholePumps/005 Shopping Prior 27/11/06 26/12/06 08/01/07 07/02/07 13/02/07 05/11/07 GRUNDFOS(Austria) 62,466.25 € 48,217.54 15/06/07 A2 Purchase of 5 new pumps at GarniPS G YWWP/GarniPumps/12 ICB Prior 20/12/07 14/12/07 12/02/08 05/02/08 29/04/08 30/05/08 Farmex(France) 141,153.18 € 95,188.00 27/08/08 A2 Purchase of 10 new valves at GarniPS G YWWP/GarniValves/14 Shopping Post 15/01/08 08/02/08 14/02/08 11/03/08 10/03/08 08/07/08 Magga(Armenia) 38,273.94 AMD 11,822,820 08/06/08 A4 Purchase of 913 valves for distribution system G YWWP/Valves/01 ICB Prior 31/10/06 25/12/06 18/12/06 09/03/07 20/02/07 02/07/07 Ronberg Gruppe (USA) 184,834.92 USD 184,834.92 22/06/07 A4 Purchase of 4,200 m pipes for distribution system - LOT 2 G YWWP/Pipes/03 ICB Prior 31/10/06 25/12/06 18/12/06 02/03/07 20/02/07 02/07/07 Fuchs Rohr (Germany) 335,233.68 € 253,487.49 22/06/07 Public Disclosure Authorized A4 Purchase of 16.8 km steel pipes for distribution system G YWWP/SteelPipes/15 ICB Prior 14/08/08 18/08/08 25/09/08 07/09/08 04/12/08 21/01/09 Salsgitter Mannesman(Germany) 774,722.18 € 571,329.04 02/06/09 8/29/08 A4 Purchase of PE pipes and fittings G YWWP/PEPipes/16 Shopping Prior 29/07/08 31/07/08 19/08/08 17/11/08 14/11/08 Farmex(France) 46,757.40 € 32,851.00 15/02/09 19/09/08 A4 Purchase of 461 valves for distribution system G YWWP/Valves/08 ICB Prior 30/04/07 13/02/07 18/06/07 10/04/07 31/08/07 01/11/07 Ronberg Gruppe (USA) 153,552.00 €41218.56 and USD98443.38 31/12/07 A4 Purchase of flowmeters for distribution system G YWWP/FlowMeters/10 ICB Prior 29/12/06 23.03.2007 15/02/07 04/05/07 02/05/07 31/08/07 SPTCO&SGAIC JV (China) 159,681.00 USD 159,681.00 31/08/07 A1 Installation of 29 borehole meters W YWWP/BHMetersWks/13 Shopping Post 05/11/07 05/11/07 27/11/07 28/12/07 25/12/07 24/12/07 GOARSHIN (Armenia) 15,167.68 AMD 4,618,560 25/02/08 A1 Supply of 4 units transformers G YWWP/BoreholePumpsWks/11 Shopping Post 24/11/07 20/11/07 21/12/07 05/12/07 15/02/08 01/02/08 Shaks Gruppe(Armenia) 14,272.81 AMD 4,373,760 25/06/08 Gyumush Pumping Station rehabilitation with installation of A1 W YWWP/GyumoushWorks/ NCB Post 17/11/08 19/12/08 10/02/09 10/07/09 pumps and springbox A1 Rehabilitation of Arzni-Yerevan water supply system W YWWP/Arzni4SourceWks/ ICB Prior 21/02/10 04/04/10 28/06/10 28/02/11 Capturing of approximately 50 l/s gravity water of Arzakan A1 W YWWP/ArzakanWks/ Shopping Post 09/02/10 09/03/10 02/04/10 30/08/10 water source Rehabilitation of Garni sources Goght captages and the sanitary A1 W YWWP/garniGoxtSourceWks/ NCB Post 11/02/10 23/03/10 07/05/10 03/12/10 zone Garni Pumping Station rehabilitation with installation of A2 W YWWP/GarniWks/21 Shopping Post 14/01/09 20/01/09 11/02/09 18/02/09 20/03/09 12/03/09 Univerasl Ltd (Armenia) 94,998 AMD 28,999,160 18/06/09 pumps and valves Qanaqer 2nd street pipeline - reconstruction of from A3 W YWWP/QanaqerTS/07 Shopping Post 03/07/07 08/06/07 31/07/07 29/06/07 04/09/07 19/07/07 Shinashkhar LTD (Armenia) 96,273.85 AMD 32,824,569 10/01/08 Tsaravaghbjur street to Sarkavag street Qanaqer-Tsaravaghbjur street - Reconstruction of pipelines A3 W YWWWP/Qanaqer2ndS/08 Shopping Post 03/07/07 08/06/07 31/07/07 29/06/07 04/09/07 23/07/07 Ecolakt/Astgik JV (Armenia) 92,976.19 AMD 31,700,232 10/01/08 Public Disclosure Authorized from the 2nd street to Sarkavag street A4 Improvement of Sari Tagh water supply system W YWWP/SariTagh/04 Shopping Post 15/03/07 10/05/07 05/04/07 31/05/07 02/05/07 28/06/07 Erknaqer Ltd (Armenia) 96,082.87 AMD 33,424,349 31/10/08 Blesk Aremenian Branch A4 Norq Marash water distribution system rehabilitation W YWWP/Marash/02 NCB Prior 07/07/07 02/08/07 03/08/07 14/09/07 05/09/07 10/12/07 276,636.46 AMD 94,371,761 10/02/08 (Armenia) A4 Reconstruction of pipelines at Fanarjyan, 16th and 17th streets W YWWP/Fanarjyan/09 Shopping Post 14/06/07 08/06/07 05/07/07 29/06/07 26/07/07 19/07/07 Shinashkhar Ltd (Armenia) 99,197.88 AMD 33,821,517 27/11/07 Zeytun –reconstruction of pipeline at Vahe Vahyan, Qanaqer A4 14th and 1st streets and rehabilitation of pipeline and sewer at W YWWP/Zeytun/01 NCB Prior 03/07/07 18/07/07 31/07/07 16/08/07 04/09/07 27/09/07 Jilyo P/Co (Armenia) 95,599.51 AMD 32,185,488 10/01/08 Meliqyan street Bypassing of Dinamo DRR pipeline and installation of the A4 W YWWP/DinamoArzni/14 Shopping Post 23/11/07 23/11/07 10/01/08 21/12/07 25/01/08 25/01/08 Jilyo P/Co (Armenia) 39,164.70 AMD 13,325,005 30/03/08 PRVs on Arzni main” Nor Jrvezh bypass -construction of gravity pipeline from A4 Dzoraghbyur DRWR and connection to the booster pumping W YWWP/NorJrvezhWks/10 NCB Post 16/12/08 03/02/09 25/01/09 04/03/09 11/03/09 30/04/09 Transgazshin (Armenia) 370,929.08 AMD 138,338,000 07/09/09 station for Mayak upper areas Civil works for sectorisation I phase- A4 Sectorisation of Northern district -Nor Nork 9th and Avan W YWWP/SectorWorksNorthern/12- lot 1 NCB 06/05/09 08/05/09 03/06/09 05/06/09 11/07/09 30/07/09 Emoshin/Horizon JV (Armenia) 72,415.66 AMD 26,779,312 18/11/2009 Arinj Civil works for sectorisation I phase- Sectorisation of Northern district -Nork Marash district and Prior “Baghramyanshin” OJSC A4 W YWWP/SectorWorksNorthern/12-lot 2 NCB 06/05/09 08/05/09 03/06/09 05/06/09 11/07/09 08/07/09 171,481.61 AMD 63,413,900 18/11/2009 Sari Tagh 9th (Armenia) Civil works for sectorisation I phase- "Yerjrmughkoyughshin" LTD Public Disclosure Authorized A4 W YWWP/SectorWorksNorthern/12 - lot 3 NCB 06/05/09 08/05/09 03/06/09 05/06/09 11/07/09 14/07/09 73,712.48 AMD 27,258,875 18/11/2009 Sectorisation of Northern district -Mayak Banavan (Armenia) Civil works for sectorisation I phase- “HAEK-i shinararutyun” CJSC A4 W YWWP/SectorWorksErebuni/13 -lot 1 NCB 21/05/09 19/05/09 18/06/09 16/06/09 26/07/09 25/06/09 159,674 AMD 58,710,400 03/12/2009 Sectorisation of Erebuni district -Lot 1-Kharberd (Armenia) Post Civil works for sectorisation I phase- “HAEK-i shinararutyun” CJSC A4 W YWWP/SectorWorksErebuni/13-lot 2 NCB 21/05/09 19/05/09 18/06/09 16/06/09 26/07/09 25/06/09 162,697 AMD 59,821,960 03/12/2009 Sectorisation of Erebuni district - Lot 2-Mushakan Jrashen (Armenia) Civil works for sectorisation I phase- A4 Sectorisation of Arabkir -Zeitun districts -Lot 1-Qanaqer W YWWP/SectorWorksArabkir Zeitun/14 NCB Post 24/05/09 26/06/09 21/06/09 24/07/09 29/07/09 31/08/09 Mekucich p/c (Armenia) 155,301 AMD 56,844,820 04/02/2010 Zeytun Ulnetsi Civil works for sectorisation I phase- “HAEK-i shinararutyun” CJSC A4 Sectorisation of Arabkir -Zeitun districts -- Lot 2-Arabkir W YWWP/SectorWorksArabkir Zeitun/14 NCB Post 24/05/09 26/06/09 21/06/09 24/07/09 29/07/09 03/09/09 114,759 AMD 42,005,154 04/02/2010 (Armenia) 1&1/2 Civil works for sectorisation I phase- "Gyughtntnmontaj 1" CJSC A4 W YWWP/SectorWorksArabkir Zeitun/14 NCB Post 24/05/09 26/06/09 21/06/09 24/07/09 29/07/09 24/09/09 129,422 AMD 47,372,400 04/02/2010 Sectorisation of Arabkir -Zeitun districts - Lot 3-Arabkir 11 (Armenia) Civil works for sectorisation I phase- A4 W YWWP/SectorWorksAjapnjak/15 NCB Post 24/05/09 13/05/09 21/06/09 10/06/09 29/07/09 30/07/09 Yerevanshin RPC(Armenia) 311,090 AMD 113,858,993 04/02/2010 Sectorisation of Ajapnyak districts Civil works for sectorisation -II phase “Baghramyanshin” OJSC A4 W YWWP/SectorWorksKentron/16 Lot 1 NCB Post 24/06/09 23/10/2009 22/07/09 17/11/2009 29/08/09 14/12/2009 195,277 AMD 75 767 405 05/02/10 Sectorisation of Kentron districts (Lot 1) (Armenia) Civil works for sectorisation -II phase “Baghramyanshin” OJSC A4 W YWWP/SectorWorksKentron/16 Lot 2 NCB Post 24/06/09 23/10/2009 22/07/09 17/11/2009 29/08/09 14/12/2009 63,085 AMD 24 351 000 05/02/10 Sectorisation of Kentron districts (Lot 2) (Armenia) Civil works for sectorisation -II phase A4 W YWWP/SectorWorksArevmutq/17 NCB Post 09/07/09 06/08/09 06/08/09 03/09/09 29/08/09 16/10/09 Yerevani Jrshin CJSC (Armenia) 118,435 AMD 45,724,090 21/01/10 Sectorisation of Arevmutq districts - Lot 1 Public Disclosure Authorized Civil works for sectorisation -II phase Yerjrmugj-koyughshin Ltd A4 W YWWP/SectorWorksArevmutq/17 NCB Post 09/07/09 06/08/09 06/08/09 03/09/09 28/08/09 16/10/09 160,207 AMD 61,851,220 21/01/10 Sectorisation of Arevmutq districts - Lot 2 (Armenia) Yerjrmugh-koyughshin Civil works for sectorisation -II phase A4 W YWWP/SectorWorksArevmutq/17 NCB Post 09/07/09 06/08/09 06/08/09 03/09/09 13/09/09 11/11/09 Ltd/Cascomshin Ltd(Armenia)- 155,290 AMD 59,952,889 21/01/10 Sectorisation of Arevmutq districts -Lot 3 consortium Yerjrmugh-koyughshin Civil works for sectorisation -I phase A4 W YWWP/SectorWorksShengavit/18 NCB Post 24/07/09 21/07/09 21/08/09 19/08/09 28/09/09 17/09/09 Ltd/Cascomshin Ltd(Armenia)- 106,803 AMD 39,939,150 16/04/10 Sectorisation of Shengavit districts- part 1 consortium Civil works for sectorisation -I phase A4 W YWWP/SectorWorksErebuniPhase

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us