Bidding Requirements, Contract Conditions And

Bidding Requirements, Contract Conditions And

BIDDING REQUIREMENTS, CONTRACT CONDITIONS AND SPECIFICATIONS for NEW PASSENGER TERMINAL at BROWNSVILLE / SOUTH PADRE INTERNATIONAL AIRPORT BID #: ATE-39-0618 April 09, 2018 ================================== Project Manual – Vol. 3 Divisions 21 – 26 Issue for Bid ================================== Section Title A/E/C Last Issue 1 TABLE OF CONTENTS 2 3 LEGEND 4 5 First Column: Specification Section Number 6 Second Column: Specification Section Name 7 Third Column: Author Responsible for Section: 8 9 C2HM – C2HM 10 COR – Corgan 11 MOYE – Moye Consulting 12 BHS – Vic Thompson Company 13 AMB – Ambiotec 14 SSP – SSP Design, LLC (Landscape) 15 16 Fourth Column: Latest Issue Date for Section 17 18 DOCUMENT PACKAGE 19 20 Issue for Bid.......................................................................................................04/09/18 21 22 23 Cover Sheet – Vol. 1............................................................................TBD 04/09/18 24 Cover Sheet – Vol. 2............................................................................COR 04/09/18 25 Cover Sheet – Vol. 3.........................................................................C2HM 04/09/18 26 Cover Sheet – Vol. 4........................................................................MOYE 04/09/18 27 Cover Sheet – Vol. 5 ...........................................................................AMB 04/09/18 28 Table of Contents.................................................................................COR 04/09/18 29 Seals Page..............................................................................................COR 04/09/18 30 31 32 Section Title Issue Date 33 34 Table of Contents.............................................................................................04/09/18 35 36 37 PROCUREMENT GROUP 38 39 Procurement and Contracting Requirements Subgroup 40 41 DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 42 43 00 Invitation to Bids..............................................................................................04/09/18 44 01 Acknowledgement of Receipt.........................................................................04/09/18 45 02 General Conditions...........................................................................................04/09/18 46 03 Supplemental General Conditions..................................................................04/09/18 47 04 Bid Bond............................................................................................................04/09/18 48 05 Performance Bond............................................................................................04/09/18 49 06 Payment Bond...................................................................................................04/09/18 50 07 BF23-BF25 – Bid Form A_Landside.............................................................04/09/18 51 07 BF23-BF25 – Bid Form B_Airside ................................................................04/09/18 52 07 BF23-BF25 – Bid Form C_By Pass Road.....................................................04/09/18 09/April/2018 00 00 03 - 1 423356 Issue for Bid New Passenger Terminal - BRO Section Title A/E/C Last Issue 1 07 BF23-BF25 – Bid Form D_Landscaping......................................................04/09/18 2 07 BF23-BF25 – Bid Form D_SSP .....................................................................04/09/18 3 07 BF23-BF25 – Bid Form E_Terminal.............................................................04/09/18 4 07 Bid Proposal.......................................................................................................04/09/18 5 08 Agreement..........................................................................................................04/09/18 6 09 FAA General Provisions..................................................................................04/09/18 7 10 FAA Airports.....................................................................................................04/09/18 8 9 10 SPECIFICATIONS GROUP 11 12 General Requirements Subgroup 13 14 DIVISION 01 - GENERAL REQUIREMENTS 15 16 01 11 00 Summary of Work................................................................................COR 04/09/18 17 Geotechnical Report.........................................................................CH2M 04/09/18 18 01 14 00 Work Restrictions.................................................................................COR 04/09/18 19 01 23 00 Alternates...............................................................................................COR 04/09/18 20 01 25 00 Substitution Procedures ......................................................................COR 04/09/18 21 01 29 00 Measurement and Payment.................................................................COR 04/09/18 22 01 31 00 Project Coordination ...........................................................................COR 04/09/18 23 01 31 19 Project Meetings...................................................................................COR 04/09/18 24 01 32 16 CPM Schedules and Reports ..............................................................COR 04/09/18 25 01 32 33 Photographic Documentation............................................................COR 04/09/18 26 01 33 23 Shop Drawings, Product Data and Samples ....................................COR 04/09/18 27 01 35 13.13 Contractor Air Operations Area (AOA) Procedures......................COR 04/09/18 28 01 41 00 Regulatory Requirements....................................................................COR 04/09/18 29 01 42 00 References.............................................................................................COR 04/09/18 30 01 43 39 Integrated Exterior Mockup...............................................................COR 04/09/18 31 01 45 16 Contractor’s Quality Control..............................................................COR 04/09/18 32 01 45 29 Testing Agency Services......................................................................COR 04/09/18 33 01 50 00 Temporary Facilities and Controls ....................................................COR 04/09/18 34 01 51 36 Temporary Water.................................................................................COR 04/09/18 35 01 55 26 Traffic Control......................................................................................COR 04/09/18 36 01 56 39 Vegetation Protection and Relocation ............................................... SSP 04/09/18 37 01 57 00 Temporary Environmental Controls.................................................COR 04/09/18 38 01 57 19 Dust Control.........................................................................................COR 04/09/18 39 01 57 23 Storm Water Pollution Plan (TPDES Requirements) ....................AMB 04/09/18 40 01 58 00 Project Identification and Signs .........................................................COR 04/09/18 41 01 60 00 Product Requirements.........................................................................COR 04/09/18 42 01 71 23 Field Engineering.................................................................................COR 04/09/18 43 01 71 33.13 Protection of Existing Utilities...........................................................COR 04/09/18 44 01 73 29 Cutting and Patching ...........................................................................COR 04/09/18 45 01 74 13 Construction Cleaning.........................................................................COR 04/09/18 46 01 74 19 Construction Waste Management and Disposal..............................COR 04/09/18 47 01 74 23 Final Cleaning .......................................................................................COR 04/09/18 48 01 77 00 Closeout Procedures............................................................................COR 04/09/18 49 01 78 23 Operation and Maintenance Data......................................................COR 04/09/18 50 01 78 30 Warranties and Bonds..........................................................................COR 04/09/18 51 01 78 39 Project Record Documents ................................................................COR 04/09/18 52 01 78 46 Extra Materials......................................................................................COR 04/09/18 09/April/2018 00 00 03 - 2 423356 Issue for Bid New Passenger Terminal - BRO Section Title A/E/C Last Issue 1 01 79 00 Systems Demonstrations and Training .............................................COR 04/09/18 2 3 4 Facility Construction Subgroup 5 6 DIVISION 02 – EXISTING CONDITIONS 7 8 02 41 16 Structure Demolition...........................................................................COR 04/09/18 9 02 41 19 Selective Structure Demolition...........................................................COR 04/09/18 10 02 82 13.33 Asbestos Abatement for Utilities.......................................................AMB 04/09/18 11 12 13 DIVISION 03 – CONCRETE 14 15 03 30 00 Cast-In-Place Concrete.....................................................................C2HM 04/09/18 16 03 30 53 Concrete for Utility Construction .....................................................AMB 04/09/18 17 03 33 00 Architectural Concrete .....................................................................C2HM 04/09/18 18 03 35 73 Concrete Floor Polishing ....................................................................COR 04/09/18 19 03 39

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    522 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us