Penndot Transit Projects

Penndot Transit Projects

DVRPC FY2021-2024 TIP for PA Final Version Pennsylvania - Transit Program (Status: TIP) PennDOT MPMS# 87534 Coatesville Train Station SR:0030 Return LIMITS: North Third Avenue and Fleetwood Street No Let Date IMPROVEMENT Transit Improvements NHPP: MRPID:AF MUNICIPALITIES: Coatesville City FC: AQ Code:2035M PLAN CENTER: IPD: PROJECT MANAGER: Steve Panko CMP: This project will include design and construction of a new ADA accessible train station approximately 300 feet east of the current station with approximately 100 to 150 parking spaces. The new station will include improved lighting, level-boarding platforms, overhead canopy, elevators, a passenger connection for crossing the tracks, and track re-alignment. These station improvements, provided by the Statewide Keystone Corridor Line Item, will move the Keystone Corridor towards full ADA accessibility, and provide an improved environment to foster increased ridership. The Coatesville Station located in Chester County is a component of the Keystone Corridor rail service between Philadelphia and Harrisburg. There are approximately seven Amtrak stops per day at the Coatesville Station. The Keystone line has multiple tracks, full electrification, and almost complete grade separation from the highway grid. Speed on the line is now up to 110 mph. This is a Keystone Corridor project totaling approximately $65 million and is funded with federal Keystone Corridor funds provided by FTA which will be reflected in TIPs of three different UZA areas: DVRPC ($9,759,000), Harrisburg Area Transportation Study ($12,671,000), and Lancaster MPO ($20,884,000). $21,237,000 has already been placed into a grant. TIP Program Years ($ 000) Phase Fund FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 CON337 (PennDO 4,172 CON 5307-S 3,635 CON 1516 1,952 9,759 0 0 0 00 0 0 00 0 0 Total FY2021-2024 9,759 Total FY2025-2028 0 Total FY2029-2032 0 Total For 2021 2022 2023 2024 2021-2024 2025-2028 2029-2032 PennDOT $9,759 $0 $0 $0 $9,759 $0 $0 7/27/2021 Page 287.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us