Follow-Up Survey on Roadmap for Transport Infrastructure Development for Greater Capital Region (Gcr)

Follow-Up Survey on Roadmap for Transport Infrastructure Development for Greater Capital Region (Gcr)

REPUBLIC OF THE PHILIPPINES NATIONAL ECONOMIC DEVELOPMENT AUTHORITY (NEDA) FOLLOW-UP SURVEY ON ROADMAP FOR TRANSPORT INFRASTRUCTURE DEVELOPMENT FOR GREATER CAPITAL REGION (GCR) TECHNICAL REPORT 1 SUPPLEMENTAL TRAFFIC SURVEYS August 2019 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) ALMEC Corporation PP JR 19-003 REPUBLIC OF THE PHILIPPINES NATIONAL ECONOMIC DEVELOPMENT AUTHORITY (NEDA) FOLLOW-UP SURVEY ON ROADMAP FOR TRANSPORT INFRASTRUCTURE DEVELOPMENT FOR GREATER CAPITAL REGION (GCR) TECHNICAL REPORT 1 SUPPLEMENTAL TRAFFIC SURVEYS August 2019 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) ALMEC Corporation TABLE OF CONTENTS 1 OVERVIEW OF THE TRAFFIC SURVEYS ....................................................... 1-1 1.1. Background .......................................................................................................... 1-1 1.2. Outline of Supplemental Surveys Conducted ........................................................ 1-2 2 CORDON SURVEY ........................................................................................... 2-1 2.1. Survey Objectives, Items and Coverage ............................................................... 2-1 2.2. Survey Result ....................................................................................................... 2-8 3 SCREENLINE SURVEY .................................................................................... 3-1 3.1. Survey Objectives, Items and Coverage ............................................................... 3-1 3.2. Survey Result ....................................................................................................... 3-3 4 PUBLIC TRANSPORT SURVEY ...................................................................... 4-1 4.1. Survey Objectives, Items and Coverage ............................................................... 4-1 4.2. Survey Results...................................................................................................... 4-3 5 CLARK INTERNATIONAL AIRPORT SURVEY ................................................ 5-1 5.1. Survey Objectives, Items and Coverage ............................................................... 5-1 5.2. Survey Results...................................................................................................... 5-3 6 PORT TRAFFIC SURVEY ................................................................................. 6-1 6.1. Survey Objectives, Items and Coverage ............................................................... 6-1 6.2. Survey Results...................................................................................................... 6-4 i LIST OF TABLE Table 1.1 Traffic Surveys in Previous Projects/Studies ............................................................ 1-1 Table 1.2 Survey Contents ....................................................................................................... 1-2 Table 2.1 List of Outer Cordon Line Survey Stations ............................................................... 2-2 Table 2.2 List of Inner Cordon Line Survey Stations ................................................................ 2-4 Table 2.3 List of Expressway Survey Stations.......................................................................... 2-6 Table 2.4 Changes in Metro Manila Boundary Daily Traffic ..................................................... 2-9 Table 2.5 Characteristics of Traffic ......................................................................................... 2-10 Table 2.6 Changes in Metro Manila Boundary Traffic ............................................................ 2-11 Table 2.7 Origin and Destination ............................................................................................ 2-12 Table 2.8 Characteristics of Traffic ......................................................................................... 2-13 Table 2.9 Traffic Volume on Expressway Cordon Line .......................................................... 2-14 Table 2.10 Origin and Destination (TPLEx) ........................................................................... 2-15 Table 2.11 Origin and Destination (SCTEx) ........................................................................... 2-15 Table 2.12 Origin and Destination (NLEx) ............................................................................. 2-16 Table 2.13 Origin and Destination (SLEx) ............................................................................. 2-16 Table 2.14 Characteristics of Traffic ......................................................................................... 2-17 Table 3.1 List of Screen Line Survey Stations .......................................................................... 3-2 Table 3.2 Screen Line Traffic .................................................................................................... 3-3 Table 3.3 Hourly Distribution (No. of passenger) (1) ................................................................ 3-5 Table 3.4 Hourly Distribution (No. of passenger) (2) ................................................................ 3-6 Table 3.5 Hourly Distribution (pcu) (1) ...................................................................................... 3-7 Table 3.6 Hourly Distribution (pcu) (2) ...................................................................................... 3-8 Table 3.7 Traffic Characteristics ............................................................................................... 3-9 Table 4.1 List of Public Transport User Survey Stations and No. of Tentative Samples ......... 4-1 Table 4.2 No. of Samples per Survey Station by Time ............................................................. 4-3 Table 4.3 % of yes to pay PHP15 for 10 minutes reduction (from origin to terminal)............... 4-4 Table 4.4 %of yes PHP 15 for 10 minutes reduction (from terminal to destination) ................. 4-5 Table 4.5 Average Walking Distance (minutes) from Origin to Terminal ................................. 4-5 Table 4.6 Average Walking Distance (minutes) from Terminal to Destination ......................... 4-6 Table 5.1 List of CIA traffic Survey Stations ............................................................................. 5-2 Table 5.2 Nationality of Samples .............................................................................................. 5-3 Table 5.3 From Origin to Airport (unit: passenger/day) ............................................................ 5-4 Table 5.4 From Destination to Airport (unit: passenger/day) .................................................... 5-4 Table 5.5 No. of Airport Users by Trip Purpose (unit: passenger/day) ..................................... 5-5 Table 5.6 Reason to Use CIA (unit: passenger/day) ................................................................ 5-6 Table 5.7 Willingness to Pay for 10 minutes Reduction in Travel Time ................................. 5-6 Table 5.8 Walkable Distance to Railway Station ...................................................................... 5-7 Table 5.9 Travel Mode .............................................................................................................. 5-8 Table 6.1 List of Port Traffic Survey Stations ........................................................................... 6-1 Table 6.2 Vehicle Traffic Count to/from Port (PCU) ................................................................. 6-4 Table 6.3 Total Foot Traffic at Ferry Terminals ........................................................................ 6-5 ii LIST OF FIGURE Figure 2.1 Locations of Outer Cordon Line Survey Stations .................................................... 2-3 Figure 2.2 Locations of Inner Cordon Line Survey Stations ..................................................... 2-5 Figure 2.3 Locations of Expressway Survey Stations .............................................................. 2-7 Figure 2.4 Changes in Metro Manila Boundary Daily Traffic .................................................... 2-8 Figure 3.1 Locations of Screen Line Survey Stations ............................................................... 3 - 2 Figure 3.2 Hourly Distribution (Passenger) ............................................................................... 3-4 Figure 4.1 Locations of public transport User Survey Stations ................................................. 4-2 Figure 5.1 Locations of CIA Traffic Survey Stations ................................................................. 5-2 Figure 6.1 Locations of Port Traffic Survey Stations (1) ........................................................... 6-2 Figure 6.2 Locations of Port Traffic Survey Stations (2) ........................................................... 6-3 Figure 6.3 Hourly Distribution (PCU) ........................................................................................ 6-5 Figure 6.4 Average Loading at Port Facilities by Vehicle Type ................................................ 6-6 iii Follow-up Survey on Roadmap for Transport Infrastructure Development for Greater Capital Region (GCR) FINAL REPORT Technical Report 1: Supplemental Traffic Surveys 1 OVERVIEW OF THE TRAFFIC SURVEYS 1.1. Background The existing database on traffic demand forecast is mainly based on the traffic surveys conducted in 2012 during MMUTIS Update and Enhancement Project (MUCEP). Some traffic and transport surveys were also conducted recently in the previous studies and projects,

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    216 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us