Request for Proposal Power Island Equipment

Request for Proposal Power Island Equipment

GLENDALE WATER AND POWER PROPOSED GRAYSON POWER PLANT REPOWERING PROJECT Request for Proposal DUE DATE: MAY 17, 2016 2:00 PM PST Power Island Equipment Rev. Date Revisions By Checked Approved No. 0 01/26/16 Issued for Proposals Stantec Stantec City (This page left intentionally blank) Grayson Repowering Project 01-26-16 Specification No. 3595 Page 2 of 36 REQUEST FOR PROPOSAL (RFP) PACKAGE AND CONTRACT DOCUMENTS Specification 3595 POWER ISLAND EQUIPMENT PROPOSED GRAYSON REPOWERING PROJECT CITY OF GLENDALE, CALIFORNIA Dated as of January 27, 2015 Project Manager Name: Ramon Abueg, Chief Assistant General Manager Address: 141 N. Glendale Avenue, Level 4 Glendale, CA 91206 Phone: (818) 548-3297 Fax: (818) 552-2852 E-Mail: [email protected] Grayson Repowering Project 01-26-16 Specification No. 3595 Page 3 of 36 TABLE OF CONTENTS NOTICE INVITING PROPOSALS ............................................................................................ 9 1. Introduction and Definitions .......................................................................................... 11 1.1 The City System Needs ................................................................................................. 12 1.2 Proposed Repowering Configuration ........................................................................... 13 1.3 Repowering Capacity .................................................................................................... 13 2. Scope of Work ............................................................................................................... 14 2.1 Equipment Supply ........................................................................................................ 14 2.2 Engineering and Technical Support .............................................................................. 15 2.3 Operations and Maintenance Support ......................................................................... 15 2.4 Permitting Support ....................................................................................................... 16 2.5 Project Phases .............................................................................................................. 16 2.5.1 LNTP Phase Scope and Proposal ..................................................................................... 16 3. Only One PIE Contract .................................................................................................... 17 4. Obtaining Documents .................................................................................................... 18 5. Mandatory Pre-Proposal Conference ............................................................................. 18 6. Notice of Intent to Propose ............................................................................................ 18 7. Clarification Requests and Addenda .............................................................................. 19 8. Proposal Content and Instructions ................................................................................. 20 9. Proposal Security ........................................................................................................... 23 10. Proposer’s Qualifications Statement .............................................................................. 24 11. Declaration of Non-Collusion ......................................................................................... 25 12. Proposal and Project Schedule ....................................................................................... 26 13. Proposal Submission ...................................................................................................... 27 14. Formal Presentation of Proposal .................................................................................... 27 15. Evaluation Criteria ......................................................................................................... 28 Grayson Repowering Project 01-26-16 Specification No. 3595 Page 4 of 36 16. City’s Rights ................................................................................................................... 31 17. Withdrawal of Proposals ................................................................................................ 32 18. Award of Contract .......................................................................................................... 33 19. Execution of Contract ..................................................................................................... 33 20. Failure to Execute Contract ............................................................................................ 34 21. Proposals as Public Records; Release of Public Records ................................................. 34 22. Campaign Contributions ................................................................................................ 35 23. Proposer Representations and Acceptance of Conditions .............................................. 36 Attachment 1 - Definitions Attachment 2 – Proposal Forms Attachment 2.1 – Commercial Exceptions Attachment 2.2 - Technical Exceptions Attachment 2.3.1 - Proposed Simple Cycle CTG Units Equipment Attachment 2.3.2 - Proposed Simple Cycle REG Units Equipment Attachment 2.3.3 - Proposed Combined Cycle CTG Units Equipment Attachment 2.4.1 – Proposed Simple Cycle CTG Units Performance Attachment 2.4.2 – Proposed Simple Cycle REG Units Performance Attachment 2.4.3 – Proposed Combined Cycle CTG Units Performance Attachment 2.5.1 –LNTP Phase Scope & Proposal Attachment 2.5.2 – Capital Cost Simple Cycle CTG Units Attachment 2.5.3 – Capital Cost Simple Cycle REG Units Attachment 2.5.4 – Capital Cost Combined Cycle CTG Units Attachment 2.6 – Cost Adjustment Terms & Storage Costs Grayson Repowering Project 01-26-16 Specification No. 3595 Page 5 of 36 Attachment 2.7 – Delivery and Payment Schedules Attachment 2.8 – O&M Costs & Maintenance Schedules Attachment 2.9 – PIE EPC Design Requirements Attachment 2.10 – Proposal Supplement Attachment 2.11.1 - Air Emissions Data Attachment 2.11.2 - Generator Interconnect Data Attachment 2.12 – Proposal Cover Sheet Attachment 2.13.1 – Proposal Bond Attachment 2.13.2 – Proposal Letter of Credit Attachment 2.14 - Proposer’s Qualification Statement Attachment 2.15 – Proposer’s Non-Collusion Affidavit Attachment 2.16 – Campaign Disclosure Form Attachment 3 – Site Conditions Attachment 4 – Site Interconnections Attachment 5 – Functional Requirements Attachment 6 – General Requirements Attachment 6.1 – Responsibilities Attachment 6.2 - Plant Systems & Tagging Requirements Attachment 6.3 - Codes & Standards Attachment 6.4 - Engineering Deliverables Attachment 6.5 – Electrical Requirements Attachment 6.6 - Low Voltage Motors Grayson Repowering Project 01-26-16 Specification No. 3595 Page 6 of 36 Attachment 6.7 - Medium Voltage Motors Attachment 6.8 – I&C Requirements Attachment 6.9 – Mechanical Requirements Attachment 6.10 – Structural Requirements Attachment 6.11 - Preferred Equipment, Spares & Technical Support Attachment 6.12 – Testing & Quality Support Attachment 6.13 – Shipping Requirements Attachment 6.14 – Site Staffing Support Attachment 6.15 – Training Attachment 6.16 – Noise Requirements Attachment 6.17 – Other Requirements Attachment 7 – Combustion Turbine Generator Specification Attachment 8 – Reciprocating Engine Generator Specification Attachment 9 – Heat Recovery Steam Generator Specification Attachment 10 – Emissions Control System Specification Attachment 11 – Steam Turbine Generator Specification Attachment 12 – Continuous Emissions Monitoring System Specification Attachment 13 – Fuel Gas Compressor Specification Attachment 14 – Inlet Air Mechanical Chiller Specification Attachment 15 – Performance Guarantees & Remedies Grayson Repowering Project 01-26-16 Specification No. 3595 Page 7 of 36 Attachment 16 – Power Island Equipment Contract Attachment 17 – Long Term Service Agreement Grayson Repowering Project 01-26-16 Specification No. 3595 Page 8 of 36 NOTICE INVITING PROPOSALS NOTICE is hereby given that the City of Glendale, through its municipal utility department, Glendale Water & Power (“GWP”) (together, the “City”) will receive sealed Proposals, until the deadline established below for the following work: Specification 3595 - Power Island Equipment – Proposed Grayson Repowering Project Proposal Deadline: Submit before 2 p.m., Pacific Standard Time, on Thursday, May 17, 2016 Proposals shall be delivered in an envelope or box containing one (1) original, five (5) hardcopies, and one (1) electronic copy to: Ramon Abueg – Chief Assistant General Manager, Glendale Water and Power, 141 N. Glendale Avenue, Level 4, Glendale, CA 91206-4496, One copy shall be delivered in unbound format. NO LATE PROPOSALS WILL BE ACCEPTED. RFP Available: January 27, 2016 Glendale Water & Power Administration 141 N. Glendale Avenue, Level 4 City of Glendale, CA 91206 Mandatory Pre-Proposal Conference: February 9, 2016 at 9:00am Location: UOC Training Center, 800 Air Way, Glendale, CA 91201 City of Glendale Contact Person: Ramon Abueg, Chief Assistant General Manager, (818) 548-3297 Grayson Repowering Project 01-26-16 Specification No. 3595 Page 9 of 36 Other RFP Information: 1. This Work shall be a Material/Equipment Supply and Technical Support Project. 2. Acceptance or Rejection of Proposals. The City reserves the right to reject any or all Proposals or any item of a proposal, to award all or any individual part/item, and to waive any or all information

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    444 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us