Revisiting the Fish Market Relocation and the Planned Redevelopment Of

Revisiting the Fish Market Relocation and the Planned Redevelopment Of

th Issue 1 of 2019 (March 2019) ISSN 1836-599X Revisiting the Fish Market relocation and the planned redevelopment of the current site by Lesley Lynch NSW may have a new Government in the near future and there is a strong possibility that it may The incoming Government would be be a minority Government. This may be a useful wise to review the decision to relocate moment to consider the state of things with the the Fish Market to the head of Bays Precinct, including the new Fish Market site Blackwattle Bay so as to ensure the and how effectively the public interest is being protected in relation to critical matters such as public interest is properly protected. housing, transport, open space and other social infrastructure needs. practice in integrated, strategically planned urban renewal to be delivered through UrbanGrowth In the November Bulletin, I offered a provisional NSW. Public good would be a central driver for view on the design by Danish architects 3XN for planning decisions. Despite scepticism born of long the new Fish Market building to be built at the head experience with development in NSW, the a very smart response to the of Blackwattle Bay: ‘‘ community, including the Glebe Society, engaged constraints (and opportunities) of the site and with this project with considerable energy for community priorities pending getting the actual ’ – several years. development application (DA) – and that, regardless of the DA and the excellence or Four years on, the overall scenario is depressing. otherwise of the building, the myriad problems flowing from the location of the site remained. Continued on p.2 We were told the DA was pretty well complete and th would be available at the end of November. It has 50 anniversary launch – free event not surfaced and, despite queries, we have no explanation for this delay. A reminder, that there’s a free members evening on Wednesday It could be that someone smart has decided that 6 March, 6.30 - 7.45 pm at Glebe the risks of proceeding with the DA for the Town Hall (downstairs). Enjoy construction of the Fish Markets on this very wine & cheese and hear more difficult site with so many major issues unresolved about the Festival (at Tramsheds especially those relating to traffic and transport – – 23-30 June) and give your are too high just before an election. Or it could just suggestions. See insert for more info on the Festival. be a series of minor problems with finalising the DA. I suspect the former is the reason – but who Concerned about getting parking near Glebe Town knows? Hall? Having reservations about getting to the event on foot? Have we got a deal for you! We will pick Time for community re-appraisal / you up! Just call Diane on 0407 207 177. assessment RSVP: By Monday 4 March 2019 to help with catering. Book online: Regardless, the delay gives the community an https://www.eventbrite.com.au/e/50th-anniversary- opportunity to consider more carefully the Fish program-launch-free-members-evening-tickets- Market relocation in the context of what has 53081905408. happened with the overall Bays Precinct grand For more information, contact: project launched with all that enthusiasm and [email protected] or ring Judy on 0417 446 promise in 2014. We were promised world’s best 425. The demise of Urban Growth The CEO of UrbanGrowth NSW – who was always The disastrous lack of cooperation by our best hope for a good outcome with fair regard WestConnex and other transport for the public interest – resigned in December 2016. No public reason was given but it followed authorities with UrbanGrowth NSW UrbanGrowth’s decision to reject all the developers’ was never resolved. Not surprisingly non-complying bids for redevelopment of the White therefore, there is still no traffic or Bay Power Station and surrounding foreshore area. transport plan for the Bays Precinct – UrbanGrowth was effectively neutered in 2017 by although the area is hemmed in by being split into an on-going smaller UrbanGrowth already seriously congested streets NSW and a reconstitution of the old NSW Landcom. The Bays Precinct was split between the and public transport. two so there is no longer an integrated planning body managing the overall renewal strategy. The decision to relocate the Fish Is it reasonable to read this as yet another Markets developer victory? Given these obvious traffic/transport problems, the Government’s announcement that the Fish Market Failure of transport planning would be relocated to a constrained and technically The disastrous lack of cooperation by WestConnex challenging ‘on water’ site was a very surprising fait and other transport authorities with UrbanGrowth accompli to the community. It had always been NSW was never resolved. Not surprisingly presumed that it would be rebuilt on part of its therefore, there is still no traffic or transport plan for existing large and publicly-owned site. the Bays Precinct – although the area is hemmed When pressed for explanation, the Government in by already seriously congested streets and cited the need for the retailers to continue trading public transport. during the construction of the new building. This is This is a fundamental failure of Government. An unconvincing. The large current site could easily integrated transport plan was always known to be have accommodated a temporary Fish Market an imperative for the success of the Bays renewal: building concurrent with the construction of the new building. Without an integrated strategy that considers all aspects of movement, the transformation It is a reasonable assumption that the real will not achieve its ambition. (Bays Precinct motivation for relocation to a new and difficult site Transformation Plan 2017) was to maximise the publicly-owned land to be made available to developers for the high-rise In April 2017, Google cited the lack of any transport residential development we know is planned for planning as a key reason for the collapse of its most of the site. This is not necessarily a bad negotiations with UrbanGrowth NSW for the reason if the outcome will be in the broad public relocation of its head office to the Bays Precinct as interest. the first step in creating a technology hub around the White Bay Power Station. That is not likely. As things now stand, it is hard to see how any plan We are never likely to see the real cost of this can successfully manage the combined impact of decision – but it is a fair bet that the $250 million the planned WestConnex interchange at Rozelle, construction cost cited by the Premier in 2017 will the targeted six million annual visitors to the be significantly exceeded and certainly will be far relocated Fish Market and the planned high-density more expensive than building on the current site. residential development of the current Fish Market It would be of interest to see detailed comparative site. Unless, of course, there was significant analyses of the likely financial benefit to the public infringement on Wentworth Park – and that would purse of the two options. Will the extra cost of be contentious – as well as having only a marginal building on the new site outweigh the extra cash impact. the Government would get for making more of the There are some alleviating possible developments: site available to developers? It is highly likely it will. the planned Bays Precinct metro station; the But the main issue is the other costs to the public (faintly) possible return of a ferry service and the good that flow from this relocation: reopening of the Glebe Island Bridge. These are all necessary and achievable, but collectively will not the exacerbated traffic and parking problems substantially alleviate the existing and growing and increased problems for transit cyclists congestion around the new Fish Market site. given the narrow road/footpath space; 2 Glebe Society Bulletin no.1 of 2019 (March 2019) the loss of an opportunity to open up the The incoming Government would be wise to foreshore at the head of Blackwattle Bay and review the decision to relocate the Fish Market to make a real connection between Wentworth the head of Blackwattle Bay so as to ensure the Park and the harbour; public interest is properly protected and to consider a major intrusion into the waters of the Bay the public benefit of opening up the harbour view (this is not an ‘on land’ site – it is all being built under and over the water), and the noise problem given the close proximity of the largely open structure and high walkway to the nearby senior high school. It is a reasonable assumption that the real motivation for relocation to a new and difficult site was to maximise the publicly-owned land to be made available to developers for the high-rise residential development we know is planned for most of the site. And then there is the contamination issue. It had A temporary resident of the current Sydney Fish Market been intended to dredge the site as part of the (Image: Sharon Bautista) building is to be underwater. That was abandoned in favour of driving pillars through the sludge to the The planned renewal of the current hard rock. The cited reason was the high cost of dredging. Fish Market site The high cost could not have been a surprise – like There is no firm master plan yet for this large area others, I suspect the real reason was the very high of public foreshore land but UrbanGrowth NSW has toxicity of the contamination of the floor of the Bay designated a market district and high-rise and the danger of disturbing it.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us