Section 7: Surface Water and Water Quality

Section 7: Surface Water and Water Quality

Contents 7. Surface Water Resources and Water Quality 7-5 7.1 Surface Water Resources 7-5 7.1.1 Background 7-5 7.1.2 Description of the Nerang River Catchment 7-5 7.1.3 Climate 7-7 7.1.4 Surface Water Hydrology 7-8 7.1.5 Impacts on Surface Water Resources 7-17 7.1.6 Surface Water Hydrology 7-18 7.1.7 Impacts on Flooding 7-29 7.1.8 Mitigation Measures 7-33 7.2 Surface Water Quality 7-35 7.2.1 Objectives 7-35 7.2.2 Policy and Legislation 7-36 7.2.3 Key Environmental Values 7-43 7.2.4 Water Quality Monitoring Programs 7-44 7.2.5 Water Quality Data 7-45 7.2.6 Water Quality Objectives for Human Use 7-57 7.2.7 Key Activities and Potential Impacts 7-58 7.2.8 Vegetation Inundation 7-59 7.2.9 Existing Biomass Surrounding Hinze Dam 7-61 7.2.10 Analysis of Impact from Vegetation Inundation 7-62 7.2.11 Impacts from Increased Water Level 7-64 7.2.12 Dam Ecosystem Classification 7-66 7.2.13 Mitigation Measure 7-70 7.3 Climate Change Adaptation 7-72 Figures Figure 7-1 Hinze Dam Impact on Daily Flow Duration 7-6 Figure 7-2 Nerang River Catchment - Average Monthly Rainfall 7-7 Figure 7-3 Mean Monthly Dam Inflows (Existing Conditions) 7-10 Figure 7-4 Hinze Dam Inflows - Daily Exceedence Curve (Existing Conditions) 7-10 Figure 7-5 Flood Reporting Sites 7-15 Figure 7-6 Nerang River Catchment Downstream 7-16 Figure 7-7 Monthly Flow downstream of Hinze Dam 7-22 Figure 7-8 Monthly Flow at Glenhurst GS 7-22 Figure 7-9 Monthly Flow at Nerang River Estuary 7-23 Figure 7-10 Daily Flow Duration Curves Downstream of Hinze Dam 7-24 7-1 Figure 7-11 Daily Flow Duration Curves at Glenhurst GS 7-24 Figure 7-12 Daily Flow Duration Curves at Nerang River Estuary 7-25 Figure 7-13 Hinze Dam - Modelled Storage Behaviour 7-26 Figure 7-14 Hinze Dam Environmental Releases and Spills 7-27 Figure 7-15 Hinze Dam - Number of Days of Spill 7-27 Figure 7-16 Potential Project Impacts and Consequences 7-37 Figure 7-17 Waters of the Nerang River Catchment 7-39 Figure 7-18 Numinbah and Springbrook Water Quality Monitoring Sites 7-46 Figure 7-19 GCW and HDA Water Quality Monitoring Sites within Hinze Dam 7-48 Figure 7-20 Median temperature and Dissolved Oxygen Values for Upper Intake 7-50 Figure 7-21 Median Temperature and Dissolved Oxygen Values for Lower Intake 7-50 Figure 7-22 GCCC Water Quality Monitoring Sites 7-53 Figure 7-23 EPA Water Quality Monitoring Sites 7-54 Figure 7-24 Median Surface Conductivity and Temperature 7-58 Figure 7-25 Predicted Rate of Filling – 75% at Commencement 7-64 Figure 7-26 Predicted Rate of Filling – 50% Full at Commencement 7-64 Figure 7-27 Conceptual Modelling of Stratification in Hinze Dam 7-68 Figure 7-28 State and Function of Hinze Dam FSL 7-69 Tables Table 7-1 Nerang River Catchment 7-5 Table 7-2 Unsupplemented Surface Water Licences 7-7 Table 7-3 Nerang River Catchment - Rainfall Data 7-7 Table 7-4 Hinze Dam - Average Monthly Rainfall and Evaporation 7-8 Table 7-5 Streamflow Gauging Stations within the Nerang River Catchment 7-8 Table 7-6 Monthly Inflow at Hinze Dam (GS146017A) 1976-1986 7-9 Table 7-7 Existing Storages within the Nerang River Catchment 7-9 Table 7-8 Gold Coast City Water Supply - Demand Pattern 7-11 Table 7-9 Environmental Values for the Waters of the Nerang Catchment 7-11 7-2 Table 7-10 Environmental Flow Objectives - Nerang River (End of System) 7-13 Table 7-11 Major Historical Flood Events on the Nerang River System 7-14 Table 7-12 Nerang River Catchment – Predicted Flood Levels 7-14 Table 7-13 Hinze Dam Storage Characteristics 7-18 Table 7-14 Nerang River - Medium & High Flow Statistics 7-20 Table 7-15 Sage 3 Environmental Flow Objectives - Nerang River Estuary 7-21 Table 7-16 Hinze Dam - Spill Statistics 7-26 Table 7-17 Nerang Catchment - Water Allocation Security Objectives 7-28 Table 7-18 Total Environmental Releases 7-29 TTable 7-19 Peak Flood levels at Glenhurst GS 7-29 Table 7-20 Hinze Dam Outflow Peak Discharges 7-30 Table 7-21 Glenhurst GS Peak Discharges 7-30 Table 7-22 Flood Affected Area 7-30 Table 7-23 Peak Flood Levels at Hinze Dam Wall 7-31 Table 7-24 Modelled Peak Flood Levels at the Nerang-Murwillumbah Road Bridge 7-32 Table 7-25 Flood Impacts at Pocket Road Bridge 7-32 Table 7-26 Modelled Peak Flood Levels at the Springbrook Road Bridge 7-33 Table 7-27 Water Quality Objectives - Aquatic Ecosystem EVs 7-40 Table 7-28 Water Quality Objectives - Human Use EVs 7-40 Table 7-29 Primary Contact Recreation Environmental Values 7-41 Table 7-30 Drinking Water Environmental Values 7-41 Table 7-31 Upland Streams Water Quality Evaluation 7-45 Table 7-32 Freshwater Lakes/Reservoir Water Quality Evaluation 7-47 Table 7-33 Drinking Water Environmental Values 7-49 Table 7-34 Lowland Streams Water Quality 7-51 Table 7-35 Upper Estuary Water Quality Evaluation 7-52 Table 7-36 Mid Estuary Water Quality – EPA Program 7-52 Table 7-37 Mid Estuary Water Quality – GCCC Program 7-55 Table 7-38 Tidal Canal Water Quality 7-55 Table 7-39 Lower Estuary Water Quality Evaluation with EPA data 7-56 7-3 Table 7-40 Open Coastal Waters Water Quality 7-56 Table 7-41 WQOs to Protect Human Use - Fresh, Estuarine and Coastal Waters 7-57 Table 7-42 Biomass Estimates in Tonnes per Hectare 7-61 Table 7-43 Total Above Ground Biomass Surrounding Hinze Dam 7-62 Table 7-44 Estimate of BOD Load from Vegetation Inundation 7-63 Table 7-45 Estimate of Daily Wind Re-aeration of Dam 7-63 Table 7-46 Hinze Reservoir Dissolved Oxygen Budget 7-63 Table 7-47 Water Quality Objectives - Freshwater lakes/reservoirs 7-65 Table 7-48 Hinze Dam Water Quality Model Results 7-66 Table 7-49 Change in Climate for SEQ by 2030, relative to 1990 7-72 Table 7-50 Potential Impacts of Climate Change and Mitigation Measures 7-73 7-4 7. Surface Water Resources and Water Quality 7.1 Surface Water Resources This section of the EIS describes the likely impacts of the Project on the surface waters of the Nerang catchment. The Project involves raising the existing Hinze dam wall crest height from RL 93.5m AHD to RL 108.5m AHD and increasing the Full Supply Level from RL 82.2m AHD to RL 94.5m AHD. This will increase the inundation area of the dam by approximately 53.3km2 as well as affecting the downstream flow regime, flood frequency and extent. 7.1.1 Background During the optimisation and design phase of the Project extensive consultation was undertaken with the Department of Natural Resources and Water (DNRW). Models were obtained from DNRW and a briefing held to regarding the use of the models. Consultation was also undertaken in relation to: the desired outcomes in relation to the strategic reserves established by the Water Resource Plans; the FSL of the dam; the optimal outcome and buffer storage requirements; and requirements to achieve compliance with the Water Amendment Regulation No.6. In addition, consultation was also undertaken with Gold Coast Water (GCW) regarding the hydrological modelling outcomes in the context of Gold Coast Waterfutures. Consultation with representatives from the Queensland Water Commission was undertaken in relation to potential water harvesting options. 7.1.2 Description of the Nerang River Catchment Catchment Characteristics The major streams of the Nerang River catchment are the Nerang River, Little Nerang Creek and Mudgeeraba Creek. The catchment area covers a total of 494.9km2 and is described further in Table 7-1. Table 7-1 Nerang River Catchment Sub-catchment Area (km2) Nerang River (below Hinze Dam) 173.0 Nerang River (above Hinze Dam) 207.0 Little Nerang Creek 40.8 Mudgeeraba Creek 74.1 Total Catchment 494.9 The Nerang River headwaters are situated within in the McPherson ranges, which are forested and largely undistrubed. The Nerang and Little Nerang Creeks flow north easterly, through predominantly agricultural land, before converging at Hinze Dam. Downstream of the dam the river continues north east through foothills and the township of Nerang before flowing east across floodplains towards the coast. Mudgeeraba Creek joins the Nerang River a few kilometres upstream of the Southport Broadwater, where the river enters the ocean. Approximately two thirds of the Nerang River catchment comprising national parks, conservation areas, rural land uses and rural residential lots. The remainder of the catchment is urban, comprising industrial, commercial and medium to high density residential areas. 7-5 Hinze Dam is situated on the Nerang River at Adopted Middle Thread Distance (AMTD) 36.4 km. The dam was originally constructed in 1976 with a capacity of 42 400 ML and upgraded to 161 070 ML (Stage 2) in 1989. The dam has a catchment area of 210km2, almost half of the Nerang River catchment, and has had a significant impact on the flow regime of the Nerang River. Hydrologic modelling of the Nerang River catchment has been undertaken using the Integrated Quantity Quality Model (IQQM) to assess the impacts of the Project on the Nerang River.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    34 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us