Local Action Plan for the Port of Novi

Local Action Plan for the Port of Novi

The European Union's Southeast Europe programme supporting … DaHar – Danube Inland Harbour Development DaHar WP 4 – A4: Local Action Plan of the Port of Novi Sad Final version: 30th of December 2013 This project is co-funded by the A project implemented by the European Union DaHar partnership Danube Inland Harbour Development Title of Report Local Action Plan of the Port of Novi Sad Sub-Activity Version Final Date of version December 30th, 2013 Status Internal Main authors Port of Novi Milosav Georgijevic Sad University of Novi Sad This project is co-funded by the European Union Local Action Plan - template Document History: Version Comments Date Authorised by Draft 30-th October Port of Novi Sad Final 30-th December Port of Novi Sad Contributing author(s) of the Document: Organisation(s) Author(s) Univeristy of Novi Sad Sanja Bojic Port of Novi Sad Vladica Culafic Municipality of Galati Ovidiu Costea This publication has been produced with the assistance of the European Union. The content of this publication is the sole responsibility of the DaHar project partnership and can in no way be taken to reflect the views of the European Union. DaHar This project is co-funded by the European Union page 3 of 20 Local Action Plan - template Table of Content 1 INTRODUCTION.................................................................................................................................. 6 1.1 Port of Novi Sad ................................................................................................................................ 6 1.2 Participants involved (involved stakeholders): ...................................................................................... 7 1.3 Legal backgrounds for the Action Plan................................................................................................. 7 2 LOCAL ACTION PLAN ........................................................................................................................ 8 2.1 Logistical infrastructure of ports, port operation models ........................................................................ 8 2.1.1 Objectives .............................................................................................................................. 8 2.1.2 Proposed actions ..................................................................................................................... 9 2.1.3 Potential impact ...................................................................................................................... 9 2.1.4 Estimated terms (start and final) ............................................................................................... 9 2.1.5 Potential/requested partners/support providers ........................................................................... 9 2.1.6 Fiscal/regulatory/other needed measures ................................................................................. 10 2.2 Hinterland connections development ................................................................................................. 10 2.2.1 Objective.............................................................................................................................. 10 2.2.2 Proposed actions ................................................................................................................... 11 2.2.3 Potential impact .................................................................................................................... 11 2.2.4 Estimated terms (start and final) ............................................................................................. 12 2.2.5 Potential/requested partners/support providers ......................................................................... 12 2.2.6 Fiscal/regulatory/other needed measures ................................................................................. 12 2.3 Introduction and development of container and Ro-Ro services on the Danube...................................... 12 2.3.1 Objectives ............................................................................................................................ 12 2.3.2 Proposed actions ................................................................................................................... 13 2.3.3 Potential impact .................................................................................................................... 14 2.3.4 Estimated terms (start and final) ............................................................................................. 14 2.3.5 Potential/requested partners/support providers ......................................................................... 14 2.3.6 Fiscal/regulatory/other needed measures ................................................................................. 15 2.4 RIS related cargo transport management ............................................................................................ 15 2.4.1 Objectives ............................................................................................................................ 15 2.4.2 Proposed actions ................................................................................................................... 15 2.4.3 Potential impact .................................................................................................................... 15 2.4.4 Estimated terms (start and final) ............................................................................................. 16 2.4.5 Potential/requested partners/support providers ......................................................................... 16 2.4.6 Fiscal/regulatory/other needed measures ................................................................................. 16 2.5 Navigability and environmental protection on the Danube ................................................................... 16 2.5.1 Objective.............................................................................................................................. 16 2.5.2 Proposed actions ................................................................................................................... 16 2.5.3 Potential impact .................................................................................................................... 17 2.5.4 Estimated terms (start and final) ............................................................................................. 17 2.5.5 Potential/requested partners/support providers ......................................................................... 17 2.5.6 Fiscal/regulatory/other needed measures ................................................................................. 17 3 ANNEX .............................................................................................................................................. 18 DaHar This project is co-funded by the European Union page 4 of 20 Local Action Plan - template Abbreviations DaHar Danube Inland Harbour Development IWT Inland Waterway Transport PP Project Partner LAP Local Action Plan CU Coordination Unit WG Working Group WP Working Plan EC European Commission EUSDR European Union Strategy for Danube Region RIS River Information Services RIS TLS RIS Transport Logistic Services DaHar This project is co-funded by the European Union page 5 of 20 Local Action Plan - template - 1 INTRODUCTION Local Action Plan of the Port of Novi Sad is developed within the DaHar project as an extension of the Integrated Strategy for the functional specialization of the small and medium sized Danube ports (in the further text Strategy). It is based on the analysis of the EU and national projects, State of the Art Study of the Port and the Master Plans which are defined in the DaHar project. 1.1 Port of Novi Sad The Port of Novi Sad is situated at 45°20′N and 19°51′E, in the central part of the autonomous province of Vojvodina in northern Serbia. The port is located at km 1254 at the left bank of the Danube, in the Novi Sad – Savino selo Canal (part of the Danube – Tisa – Danube - DTD Canal network) at its km 0.4 - 1.2. It covers an area of 24 ha. Figure 1. Port of Novi Sad Port is situated at the intersection of the two Pan-European transport corridors (naval corridor VII and road and rail corridor X) and it is an important transport and cargo handling centre of Central Europe. DaHar This project is co-funded by the European Union page 6 of 20 Local Action Plan - template This clearly indicates a good geographical position of the port and determines the direction of development in order to meet the needs of the local economic environment and international flows of goods, with particular attention to the development of multimodal transport. The distance between the Port and the corridors: 300 m to the railway corridor Xb 3 km to the road corridor Xb. 1.2 Participants involved (involved stakeholders): University of Novi Sad, Faculty of Technical Sciences (DaHar IPA Partner) and Republic of Serbia, Autonomous Province of Vojvodina - Provincial Secretariat of Economy (DaHar Associated Strategic Partner) 1.3 Legal backgrounds for the Action Plan On the EU level: White paper, EU projects Danube Strategy, TEN-T Guidelines, EU Strategy for the Danube Region - Appeal of the Steering Group, Linz, 17th April 2013. On the national – local level: The strategy of economic development of the AP Vojvodina, 2012-2020, Novi Sad, 2011, Regional Development Plan of the AP Vojvodina 2014-2020,

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us