Jules Verne ATV Docking QUALIFY

Jules Verne ATV Docking QUALIFY

Jules Verne ATV Docking QUALIFY Description sams2, 121f02 at LAB1O2, ER1, Drawer 1:[128.73 −23.53 144.15] Increment: 14, Flight: 12A.1 250.0000 sa/sec (100.00 Hz) Sum 121f02 Δf = 0.244 Hz, Nfft = 1024 Jules Verne ATV Docking Hanning, k = 439 Sensor Temp. Res. = 4.096 sec, No = 0 Start GMT 03−April−2008, 094/14:30:00.000 Span = 29.90 minutes 250.0 sa/sec (100.00 Hz) 100 −6 Location LAB1O2, ER1, Drawer 1 90 Inc/Flight Increment: 16, Flight: S15 Plot Type spectrogram −7 80 70 NOTES: −8 • The European Space Agency’s first /Hz)] 60 2 Automated Transfer Vehicle (ATV), (g 10 Jules Verne, docked at the aft end of the Russian service module 50 −9 at GMT 094/14:45. Frequency (Hz) • ESA website for the ATV states that 40 the approach of the ATV to the ISS PSD Magnitude [log Σ slows down to 7cm/s, just prior to −10 30 docking. • Similar to a Soyuz or Progress docking, the events as recorded by 20 PIMS on console were as follows: −11 1. Initial contact and capture 10 (14:45:39) 2. Pause several minutes to let relative motion between the two 0 −12 spacecraft damp out 14:30:00 14:32:53 14:35:46 14:38:38 14:41:31 14:44:24 14:47:17 14:50:10 14:53:02 14:55:55 14:58:48 GMT 03−April−2008, 094/hh:mm:ss 3. Drive latches to make solid from: /misc/yoda/pub/pad/, $Name: $, 11−Apr−2008,14:37:11.543 mechanical connection (14:50:51) Microgravity Science Division Glenn Research Center Regime: Vibratory Category: Vehicle PIMS ISS Acceleration Handbook Date last modified 4/18/08 Source: ATV Docking Jules Verne ATV Docking QUANTIFY Description sams2, 121f02 at LAB1O2, ER1, Drawer 1:[128.73 −23.53 144.15] Increment: 14, Flight: 12A.1 1.0000 sa/sec (100.00 Hz) Jules Verne ATV Docking Vector Magnitude 121f02 Interval Max Sensor Size: 1.00, Step: 1.00 sec. Start GMT 03−April−2008, 094/14:40:00.000 250.0 sa/sec (100.00 Hz) 16 Location LAB1O2, ER1, Drawer 1 Inc/Flight Increment: 16, Flight: S15 14 Plot Type spectrogram 12 NOTES: • The ATV’s initial contact with ISS 10 occurs at approximately 6 minutes into the interval max plot. • Peak magnitude of initial contact as 8 measured by 121f02 was12.9 mg. • Unlike shuttle dockings, the driving 6 of the latches is not readily apparent in these plots. The oval calls out the Acceleration Vector Magnitude ( mg ) time period where the driving of the 4 latches occurred. 2 0 Mean = 0.7470 mg Overall Max = 12.9064 mg 0 5 10 15 Time (minutes) from: /misc/yoda/pub/pad/, $Name: $, 11−Apr−2008,14:56:29.756 ATV Docking (Image from ESA Website) Microgravity Science Division Glenn Research Center Regime: Vibratory Category: Vehicle PIMS ISS Acceleration Handbook Date last modified 4/18/08 Source: ATV Docking .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us