Amtrak: America’S Railroad

Amtrak: America’S Railroad

Amtrak: America’s Railroad TESTIMONY OF JOSEPH H. BOARDMAN PRESIDENT AND CHIEF EXECUTIVE OFFICER AMTRAK BEFORE THE SUBCOMMITTEE ON SURFACE TRANSPORTATION AND MERCHANT MARINE INFRASTRUCTURE, SAFETY AND SECURITY OF THE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION WEDNESDAY, APRIL 17, 2013 2:30 P.M. 253 RUSSELL SENATE OFFICE BUILDING The Northeast Corridor capacity challenge - 800 750 700 650 VRE 600 MARC LIRR 550 REPRESENTATIVE WEEKDAY TRAIN MOVEMENTS - SPRING 2007 NJT 500 SEPTA 450 CSX TRAINS per DAY NS 400 MBTA THE NORTHEAST CORRIDOR 350 MN 300 SLE P&W 250 A mtak. NJT, LIRR train NY P AMTRAK movementsPenn show n separately 200 to keep reasonable scale. 150 today 100 New Station 50 0 York Richmond - Main St., VA Ashland, VA South Milford, VA Cross Roads, VA Arkendale, VA Lorton, VA Includes train movements operating WASHINGTON, DC only on NEC "Spine" Right-of-Way Bowie State, MD West Baltimore, MD Gunpowder River, MD Perryville, MD Newark, DE Holly Oak, DE PHILADELPHIA, PA Cornwells Heights, PA Hamilton, NJ New Brunswick, NJ Newark- Liberty Airport, NJ NEW YORK , NY New Rochelle, NY Rowayton, CT Stratford, CT Branford, CT Westbrook, CT Waterford, CT Stonnington, CT Kingston, RI Cranston, RI Hebronville, RI Route 128, MA BOSTON, MA 2 The Northeast Corridor capacity challenge - tomorrow Boston Providence New Haven Newark New York Philadelphia Wilmington Baltimore Segment exceeding Washington capacity by 2030 Projected NEC capacity situation, 2030 3 Opening Portal Bridge NJ Transit train holding for Portal bridge opening Tugboat All trains entering or leaving New York from the south must cross the century-old Portal Bridge – a double-tracked swing bridge over the Hackensack River that opens to admit river traffic and closes to operate 4 trains (each opening requires 4 people onsite, typically 4-6 openings/week) Maintaining Portal Bridge Work goes on at Portal Bridge between trains, with “flag protection” – workers stand aside to let trains pass at speed (60mph) 5 Focus on the passenger 6 The Gateway Project New Portal Bridge 7 Today’s Amtrak System 8 The Amtrak system - minus western long distance services This shows what happens if you remove the six long distance trains with 9 the highest annual total operating loss.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us