Identification of Critical Factors for Delay in Metro

Identification of Critical Factors for Delay in Metro

International Journal of Students’ Research in Technology & Management eISSN: 2321-2543, Vol 6, No 1, 2018, pp 30-39 https://doi.org/10.18510/ijsrtm.2018.615 IDENTIFICATION OF CRITICAL FACTORS FOR DELAY IN METRO RAIL PROJECTS IN INDIA 1*Yash Kumar Mittal, 2Virendra Kumar Paul 1 Research Scholar, 2 Professor, Department of Building Engineering and Management, School of Planning and Architecture-Delhi *[email protected], [email protected] Article History: Received on 17th April, Revised on 09th June, Published on 19th June 2018 Abstract Purpose of the study: World over, transportation infrastructure projects face delays in commissioning and India is no exception. This study is carried out with an objective to specifically identify the critical delay factors in the commissioning of metro rail projects in India. Methodology: A questionnaire survey was conducted to identify the major causes of delay from the opinion of clients, contractors and consultants. Calculation of Relative Importance Index (RII) for the shortlisted factors yielded the ranking. The ranking by various categories of respondents was analysed using Spearman’s rank coefficient. Main Findings: The study concluded in identification of 10 most critical delay-factors from a list of 49 shortlisted factors spread across 7 categories. The identified factors included: (1) Delay in land acquisition and site handover to contractor, (2) Shifting of utilities and contingency works, (3) Scope change, (4) Delay in payments, (5) Effects of unforeseen subsurface and changing ground condition, (6) Shortage of construction materials in the market, (7) Delays in design approvals and decision making, (8) Shortage of labour, (9) Lack of data collection and survey before design, and (10) Delay in obtaining permits from local body. Implications: Project management interventions based on the identified critical factors of delay can improve the delivery of upcoming metro rail projects in terms of schedule compliance. Applications of this study: The Application of suitable course correction measures targeting the critical factors can result in mitigation of delays. Novelty/Originality of this study: The study is one of its kind attempt to investigate all the commissioned metro rail projects in India for analyzing delays in the Indian urban rail sector. Keywords: Metro Rail Projects; Delay; Critical Factors; Ranking; Index INTRODUCTION Delay in Infrastructure Projects The urban population of India stood at 31.16 % as per the 2011 census of India. It is projected to rise to 60 percent by the year 2050. To respond to this shifting trend, in the last decade, 8 metro rail projects have been commissioned in India to augment the provisions for public transport. Regardless of the importance and demand for metro rail projects as a means of public transport, issues like untimely completion and delays are common to the planning and execution of these projects. Poor project delivery in terms of time and cost adherence, in almost all the cases of metro projects, proves the case of volatile project performance. The factors of time, cost and quality with respect to Indian construction projects in different regions have been investigated from time to time. Whereas the performance evaluation of metro rail projects in the transportation sector, which equally fails to comply with the project performance standards, has not received the desired attention. Iyer & Jha (2006) found that out of the set of studied projects in India, 40% were found to exhibit poor project performance in terms of time overrun. Ahsan & Gunawan (2010) studied the time performance of projects in a selected group of countries in Asia and found the time performance of Indian construction projects to be the poorest, with an average schedule overrun of 55%. Vijayamohan Pillai & K P (2003) studied 24 power projects in India and analysed the extent of time and cost overruns. The projects were reported with an average time overrun of more than 150%. Bharath & Pai (2013) in a similar study found that Bandra-Worli sea link project in Mumbai observed more than 400% cost overrun and five years of delay. Singh (2010) analysed the extent of cost and time overruns on a large set of infrastructure projects and reported that 445 out of the then going 925 projects were experiencing delays. In the study, projects spread across the seventeen sectors of infrastructure as categorised by the Ministry of Statistics and Programme Implementation, executed during 1992-2009, were found to exhibit an average time overrun of 125%. This validates the case of time overrun and cost overshoot in case of Indian infrastructure projects. Time and cost overrun are also commonly observed in case of metro rail projects in India. Delhi metro project, commissioned in 2002, was the first modern metro project in India. The first phase of the project performed well in terms of schedule and cost compliance. The other commissioned projects in the last decade include Namma Metro, Rapid Metro, Mumbai Metro, Jaipur Metro, Chennai Metro, Kochi Metro and Hyderabad Metro. Almost all of these metro rail projects have faced delays 30 |www.ijsrtm.in ©Authors International Journal of Students’ Research in Technology & Management eISSN: 2321-2543, Vol 6, No 1, 2018, pp 30-39 https://doi.org/10.18510/ijsrtm.2018.615 and ended up with substantial schedule overruns. With reference to such scale and frequency of delays in metro rail projects, it becomes significant to investigate the projects for identifying the factors responsible for the delay. The studies conducted so far have discussed and analysed the factors related to delays of construction projects in the context of specific regions. Metro rail projects in India demand similar critical investigations. The number of upcoming projects and the issues during the pre-planning, planning and execution stages makes it imperative to identify the agents of delay, their contribution and the viewpoint of various stakeholders. Hence, this study focuses on the identification of critical delay factors and their ranking based on the opinion of different stakeholders. LITERATURE REVIEW Delay in projects There is substantial literature available corresponding to delay in construction projects ranging from case examples of developing to developed nations. A majority of researches focus on the identification of critical factors and impacts of delay specific to a region. This study takes reference of the above mentioned category of works to derive a methodology for research. Assaf & Al-Hejji (2006) examined the construction projects in Saudi Arabia using a questionnaire based study and the findings reported that 70 % of the considered construction projects failed to complete within the stipulated time. The most common factor responsible for the delay as identified by the owner, consultant and the contractor using questionnaire survey was “Change Order”. In a study based in Nigeria, Ajanlekoko (1987) observed the schedule compliance in construction projects to be poor. Ogunlana, Promkuntong & Jearkjirm (1996) observed significant delays in Thailand whereas Al-Momani (2000) conducted an investigation of severe construction delays in Jordan. Causes of delay Ahmed et al. (2003) emphasized on the need to identify the causes of delay in construction industry in Florida and advocated that the delays could be mitigated by working on the identified causes. Alaghbari et al. (2007) reported the factors of delay in building construction projects in Malaysia by conducting an opinion survey on shortlisted 31 factors. This study measured the importance of factors classified in four categories –contractor factors, owner factors, consultant factors and external factors. Mezher & Tawil (1998) reported the important factors of delay in the study conducted for construction projects in Lebanon. Financial issues in case of owner, contractual relationships for a contractor and project management issues for consultant were identified as the most important factors of delay. Sambasivan & Soon (2007) studied the factors of project delay and its repercussions on project completion in the Malaysian construction industry. The ten most significant causes of delay identified from a set of twenty eight different causes were (1) contractor’s improper planning, (2) contractor’s poor site management, (3) inadequate contractor experience, (4) inadequate client’s finance and payments for completed work, (5) problems with subcontractors, (6) shortage in material, (7) labor supply, (8) equipment availability and failure, (9) lack of communication between parties, and (10) mistakes during the construction stage. Memon et al. (2014) studied the factors of time overrun in case of Malaysian construction industry and reported that frequent design changes; change in the scope of the project; financial difficulties of owner; delays in decision making; and unforeseen ground conditions as the most contributing factors. Al-Khalil & Al-Ghafly (1999) determined the most important causes of delay in public utility projects in Saudi Arabia. The three parties i.e. Contractors, Consultants and Owners, were found to agree on the importance ranking of delay causes. Koushki, Al-Rashid & Kartam (2005) derived the three main causes of time-delays included changing orders, owners’ financial constraints and owners’ lack of experience in the construction projects in Kuwait. The findings of the study by Faridi & El-Sayegh (2006) mention that half of the construction projects face delays because of

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us