Form -1 MINING PLAN & PRE-FEASIBILITY REPORT

Form -1 MINING PLAN & PRE-FEASIBILITY REPORT

form -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent: 2.25.5 Ha)-B2 Project IN S.F.NO : 2/2C1A & 2/2C1B (P) VILLAGE : J. ALANGULAM TALUK : THIRUMANGALAM DISTRICT : MADURAI STATE : TAMIL NADU SUBMITTED TO State Level Environment Impact Assessment Authority (SEIAA), Government of Tamilnadu Chennai SUBMITTED BY THIRU. I. VETRIVEL S/O THIRU. IRULANDI THEVAR D. NO. 7/2, THIRUVALLUVAR NAGAR, USILAMPATTI TALUK, MADURAI DISTRICT. S.NO DESCRIPTION PAGE NOS 1 To Obtain Environmental clearance 2 Environmental clearance Format 3 Declaration letter 4 Demand Draft 5 Form-I Approved Mining Plan Along With Approval 6 Letter Precise area communication letter from District 7 Collector/ Principal Secretary to Government 8 Pre-Feasibility Report 9 VAO signed for quarry site Letter from the AD/DD mines about the details (Name of the Owner, S.F.No Extent & Distance from the boundary of this quarry) of quarries 10 (Proposed/Existing/Abandoned Quarries) Within a radius of 500m from the boundary of the proposed quarry site (Applicable for Rough stone/Granite) 11 Affidavit Document ENVIRONMENT CLEARANCE 12 Lr.No.SEIAA-TN/F.No.3993/EC/1(a)/2271/2015 dated:23.10.2015 13 Resistivity Survey License Consolidated Above Document In PDF Format 14 Enclosed (DVD) Form-1, Prefeasibility Report, Mining Plan for Rough Stone quarry S.F. No2/2C1A & 2/2C1B (P) of J. ALANGALAM Village, THIRUMANGALAM Taluk, MADURAI District, Tamil Nadu of Thiru. I. VETRIVEL, (Extent – 2.25.5Ha). FORM -1 FORM – I THIRU. I. VETRIVEL (I) Basic Information S.No Item Detail 1 Name of the project/s J. ALANGALAM Village Rough stone Quarry project. 2 S.No. in the schedule 2/2C1A & 2/2C1B (P) 3 Proposed capacity/area/length Rough Stone 185580 m3 /tonnage to be handled /command area/lease area /number of wells to be Extent = 2.25.5Hectares. drilled. 4 New/Expansion/Modernization Fresh quarry (MODIFIED MINING PLAN) 5 Existing Capacity/Area etc. Fresh quarry 6 Category of Project i.e. ‘A’ or ‘B’ Category – B (B2) 7 Does it attract the general condition? If No. It doesn’t attract any items mentioned yes, please specify. in the general conditions 8 Does it attract the specific condition? If yes, please specify. (MODIFIED MINING PLAN) Location: Plot/Survey/Khasra No. 2/2C1A & 2/2C1B (P) 9 Village J. ALANGALAM Taluk THIRUMANGALAM District Madurai State Tamilnadu 10 Nearest railway station/airport along Madurai -25Kms with distance in kms Madurai -25Kms 11 Nearest Town, city, district Town - THIRUMANGALAM -10Kms Headquarters along with distance in kms. 12 Village Panchayats, Zilla Parishad, Vill a g e - J. ALANGALAM Municipal Corporation, Local body Panchay a t Union - THIRUMANGALAM (complete postal addresses with Taluk - THIRUMANGALAM telephone nos. to be given) District - Madurai 13 Name of the applicant THIRU. I. VETRIVEL 14 Registered Address THIRU. I. VETRIVEL, S/O THIRU. IRULANDI THEVAR D. NO. 7/2, THIRUVALLUVAR NAGAR, USILAMPATTI TALUK, MADURAI DISTRICT. Address for correspondence: Same as above Name THIRU. I. VETRIVEL 15 Designation (Owner/Partner /CEO) Owner Address Same as above Pin code 625532 E-mail drskpannan@ gmail.com Telephone No. 9894450775 Fax No. Nil 16 Details of Alternative Sites examined, if There is no alternative site examined as any. Location of these sites should be The project is site specific. shown on a topo sheet. 17 Interlinked Projects There is no inter linked projects 18 Whether separate application of There is no inter linked projects interlinked project has been submitted? 19 If yes, date of submission Does not arise 20 If no, reason Since the project involves rough stone Operation only, there is no interlinked projects. Whether the proposal involves (i)The project doesn’t attract the Forest approval/clearance under: if yes, (Conservation) Act 1980. There is no Forest land 21 details of the same and their status to be involved within the quarry lease applied area given. (ii) There is no wild life with in 10 km radius from i. The Forest (Conservation) Act, 1980? ii. the project site area under the Wildlife (protection) The Wildlife (Protection) Act, 1972? iii. The Act1972. C.R.Z. Notification, 1991? (iii) The quarry is not located away from Bay of Bengal. Hence, the project doesn’t attract the C.R.Z. Notification, 1991. Whether there is any Government Nil 22 Order/Policy relevant/ relating to the site. 23 Forest Land involved ( hectares) Nil. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? No litigation is pending with court as against this a) Name of the Court project. 24 b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change No Nil in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No Not required, since the project is dry, vacant, Vegetation and buildings? uncultivable area, strewn with boulders of various sizes, few shrubs and weeds, No cutting of trees or demolition of buildings involved. 1.3 Creation of new land uses? No The total quarrying activity is proposed to be carried out within the quarry lease applied area and hence there is no proposal for the creation of new land use 1.4 Pre-construction investigations No Rough Stone occurrences are exposed in the existing e.g. bore houses, soil testing? pit and no further exploratory drilling is necessary. 1.5 Construction works? yes Office building will be constructed in the quarry lease hold area. 1.6 Demolition works? No No demolition work is involved. 1.7 Temporary sites used for No No temporary site for construction works is construction works or housing of involved. construction workers? 1.8 Above ground buildings, No There will not any high rise buildings structures or earthworks including linear structures, cut and fill or 1.9 Underground works including No No underground working is involved. mining or tunneling? 1.10 Reclamation works? No There is no proposal for backfilling. The Quarrying operation will be performed to exploit 95% of the total reserves. 1.11 Dredging? No There is no scope for dredging 1.12 Offshore structures? No There is no such activities involved 1.13 Production and Manufacturing Yes Rough Stone production for 5 years = 131777 m3 process and there is no manufacturing process here. 1.14 Facilities for storage of goods or Yes The wastes are generated during the mining period is materials? shall be proposed to dump (Backfilling) in S-W side. And Topsoil along lease boundary 1.15 Facilities for treatment or yes The wastes are generated during the mining period is disposal of solid waste or liquid shall be proposed to dump (Backfilling) in effluents? S-W side. And Topsoil along lease boundary 1.16 Facilities for long term housing No The proposed project is for a period of 5 of operational workers? Years where local people will be employed and there is no scope for long term housing for workers. 1.17 New road, rail or sea traffic No The existing road is adequate. It will be properly re during construction or laid or strengthened. operation? 1.18 New road, rail, air waterborne or No Not required. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No This project will not cause any changes transport routes or infrastructure to the existing traffic movement leading to changes in traffic movements? 1.20 New or diverted transmission No The project doesn’t involve diversion of lines or pipelines? transmission or pipe lines 1.21 Impoundment, damming, No The project does not involve impoundment, culverting, realignment or other damming, Culverting, realignment or other changes. changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No There is no stream crossing within the proposed area 1.23 Abstraction or transfers of water No About 2.5 KLD water will be used for dust form ground or surface waters? suppression, green belt and domestic sanitary needs. 1.24 Changes in water bodies or the No No changes in the water bodies or the land surface land surface affecting drainage or under this project. run-off? 1.25 Transport of personnel or No There is no proposal for transport of materials for construction, operation personnel or material for construction, operation or or de commissioning? de-commissioning 1.26 Long-term dismantling or No No dismantling, De-commissioning or decommissioning or restoration restoration works required or planned works? 1.27 Ongoing activity during No No such type of activities involved in the Decommissioning which could have project an impact on the environment? 1.28 Influx of people to an area in Yes Considering the small magnitude of the operation of either temporarily or permanently? the employment of locals mainly, no major influx of the people will happen. 1.29 Introduction of alien species? No No introduction of any species is involved 1.30 Loss of native species or genetic No As the area is devoid of any vegetation diversity? and habitation, there is no loss of any native species. 1.31 Any other actions? No None 2. Use of Natural resources for Construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Yes/ Details there of (with approximate quantities S.No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us