2021-2045 Highway and Bridge Projects

2021-2045 Highway and Bridge Projects

Appendix A: 2021-2045 Highway and Bridge Projects 2021-2032 Projects by County (Twelve-Year Plan) 2033-2045 Projects and Reserve Line-Items Appendix A: 2021-2045 Highway and Bridge Projects Projects by County, 2021-2032 Key to Phases: C = Construction; F = Final Design; P = Preliminary Design; R = Right-of-Way Acquisition; S = Study; U = Utility Relocation First Four Years, Second Four Years, Third Four Years, County S.R. Section MPMS Project Title Phase Area Total 2021-2024 2025-2028 2029-2032 Bradford Bradford 99158 SR220 Major Guide Signs C HRST 100,000 100,000 Bradford 106247 Group Non-composite Deck F BRDG 300,000 300,000 Bradford 106247 Group Non-composite Deck +C BRDG 2,000,800 2,000,800 Bradford 106267 NTIER Cable Guide Rail Upgrade P SAMI 150,000 150,000 Bradford 106267 NTIER Cable Guide Rail Upgrade F SAMI 150,000 150,000 Bradford 106267 NTIER Cable Guide Rail Upgrade U SAMI 100,000 100,000 Bradford 106267 NTIER Cable Guide Rail Upgrade R SAMI 150,000 150,000 Bradford 106267 NTIER Cable Guide Rail Upgrade C SAMI 1,750,000 1,750,000 Bradford 110324 20-21 RPM Contract NTIER C HRST 30,000 30,000 Bradford 110325 21-22RPM Contract NTIER C HRST 30,000 30,000 Bradford 113489 SCM Monitoring NTIER S HRST 300,000 300,000 600,000 Bradford LBR 5110 T-348 over Millstone Creek P BRDG 200,000 200,000 Bradford LBR 5110 T-348 over Millstone Creek F BRDG 100,000 100,000 Bradford LBR 5110 T-348 over Millstone Creek U BRDG 15,000 15,000 Bradford LBR 5110 T-348 over Millstone Creek R BRDG 10,000 10,000 Bradford LBR 5110 T-348 over Millstone Creek C BRDG 250,000 250,000 500,000 Bradford LBR 5166 T-821 over Beckwith Creek P BRDG 100,000 100,000 200,000 Bradford LBR 5166 T-821 over Beckwith Creek F BRDG 100,000 100,000 Bradford LBR 5166 T-821 over Beckwith Creek U BRDG 20,000 20,000 Bradford LBR 5166 T-821 over Beckwith Creek R BRDG 15,000 15,000 Bradford LBR 5166 T-821 over Beckwith Creek C BRDG 1,400,000 1,400,000 Bradford LBR 57557 T-553 ov Wallace Run U BRDG 10,000 10,000 Bradford LBR 57557 T-553 ov Wallace Run R BRDG 15,000 15,000 Bradford LBR 57557 T-553 ov Wallace Run C BRDG 600,000 600,000 Bradford LBR 88852 T-105 over Cayuta Creek C BRDG 2,625,000 2,625,000 Bradford LBR 102862 T-762 ov Seeley Creek #38 U BRDG 20,000 20,000 Bradford LBR 102862 T-762 ov Seeley Creek #38 R BRDG 15,000 15,000 Northern Tier 2045 Long-Range Transportation Plan 1 Projects by County, 2021-2032 Key to Phases: C = Construction; F = Final Design; P = Preliminary Design; R = Right-of-Way Acquisition; S = Study; U = Utility Relocation First Four Years, Second Four Years, Third Four Years, County S.R. Section MPMS Project Title Phase Area Total 2021-2024 2025-2028 2029-2032 Bradford LBR 102862 T-762 ov Seeley Creek #38 C BRDG 1,800,000 1,800,000 Bradford LBR 114098 T-377 over Sugar Run P BRDG 100,000 100,000 Bradford LBR 114098 T-377 over Sugar Run F BRDG 50,000 50,000 Bradford LBR 114098 T-377 over Sugar Run C BRDG 800,000 800,000 Bradford 000 68018 NTIER TIP reserve D3 C SAMI 928,000 1,207,000 2,135,000 Bradford 6 M36 87973 Sugar Creek to Gulf Rd +C HRST 2,684,240 2,684,240 Bradford 6 M36 87973 Sugar Creek to Gulf Rd +C HRST 2,500,745 2,500,745 Bradford 6 125 99418 Township Rd to Old Mills Rd +C SAMI 940,775 940,775 Bradford 6 125 99418 Township Rd to Old Mills Rd +C SAMI 1,060,000 1,060,000 Bradford 6 125 99418 Township Rd to Old Mills Rd +C SAMI 1,500,000 1,500,000 Bradford 6 131 101100 SR6 & SR 187 Intersection F HRST 100,000 100,000 Bradford 6 131 101100 SR6 & SR 187 Intersection U HRST 200,000 200,000 Bradford 6 131 101100 SR6 & SR 187 Intersection R HRST 200,000 200,000 Bradford 6 131 101100 SR6 & SR 187 Intersection C HRST 2,096,803 1,803,197 3,900,000 Bradford 6 133 101052 Old Mills Rd to Main St P HCON 450,000 450,000 Bradford 6 133 101052 Old Mills Rd to Main St C HCON 9,330,000 9,330,000 Bradford 6 145 110394 SR6 Reconstruction Towanda Borough P HCON 750,000 750,000 Bradford 6 145 110394 SR6 Reconstruction Towanda Borough F HCON 500,000 500,000 Bradford 6 145 110394 SR6 Reconstruction Towanda Borough R HCON 500,000 500,000 Bradford 6 145 110394 SR6 Reconstruction Towanda Borough +C HCON 6,998,000 6,998,000 Bradford 6 147 110406 SR6 from Tracey Rd to Rummerfield Rd P HRST 50,000 50,000 Bradford 6 154 112596 SR 6 Wyalusing Twp Slide +F HRST 300,000 300,000 Bradford 6 154 112596 SR 6 Wyalusing Twp Slide +U HRST 50,000 50,000 Bradford 6 154 112596 SR 6 Wyalusing Twp Slide R HRST 50,000 50,000 Bradford 6 154 112596 SR 6 Wyalusing Twp Slide +C HRST 1,019,000 1,019,000 Bradford 6 154 112596 SR 6 Wyalusing Twp Slide +C HRST 1,981,000 1,981,000 Bradford 6 159 114016 West of SR 3011 to Wonder View Lane P HRST 25,000 25,000 Bradford 6 160 114017 Burlington to East of SR 3011 P HRST 25,000 25,000 Bradford 6 161 114018 Wyalusing to Lattimore Road P HRST 25,000 25,000 Bradford 6 161 114018 Wyalusing to Lattimore Road C HRST 832,000 2,350,000 3,182,000 Bradford 6 162 114019 SR 4019 to SR 3033 P HRST 25,000 25,000 Northern Tier 2045 Long-Range Transportation Plan 2 Projects by County, 2021-2032 Key to Phases: C = Construction; F = Final Design; P = Preliminary Design; R = Right-of-Way Acquisition; S = Study; U = Utility Relocation First Four Years, Second Four Years, Third Four Years, County S.R. Section MPMS Project Title Phase Area Total 2021-2024 2025-2028 2029-2032 Bradford 6 164 114021 Susquehanna River to Laning Creek P HRST 25,000 Bradford 14 077 88915 SR 14 over Tannery Creek F BRDG 150,000 150,000 Bradford 14 077 88915 SR 14 over Tannery Creek U BRDG 20,000 20,000 Bradford 14 077 88915 SR 14 over Tannery Creek R BRDG 15,000 15,000 Bradford 14 077 88915 SR 14 over Tannery Creek +C BRDG 500,000 500,000 1,000,000 Bradford 14 093 94631 SR 14 over Tb South Creek #2 F BRDG 150,000 150,000 Bradford 14 093 94631 SR 14 over Tb South Creek #2 U BRDG 15,000 15,000 Bradford 14 093 94631 SR 14 over Tb South Creek #2 R BRDG 15,000 15,000 Bradford 14 093 94631 SR 14 over Tb South Creek #2 +C BRDG 500,000 500,000 1,000,000 Bradford 14 102 91435 SR 14 over Tb South Creek #1 F BRDG 150,000 150,000 Bradford 14 102 91435 SR 14 over Tb South Creek #1 U BRDG 20,000 20,000 Bradford 14 102 91435 SR 14 over Tb South Creek #1 C BRDG 500,000 500,000 1,000,000 Bradford 14 110 99156 Windfall Rd to Tennessee Gas Rd +C HRST 3,470,000 3,470,000 Bradford 14 123 97599 PA 14 ov Tb to Towanda Cr P BRDG 200,000 200,000 Bradford 14 123 97599 PA 14 ov Tb to Towanda Cr F BRDG 100,000 100,000 Bradford 14 123 97599 PA 14 ov Tb to Towanda Cr U BRDG 20,000 20,000 Bradford 14 123 97599 PA 14 ov Tb to Towanda Cr R BRDG 15,000 15,000 Bradford 14 123 97599 PA 14 ov Tb to Towanda Cr +C BRDG 870,000 130,000 1,000,000 Bradford 154 090 114178 SR154 over Beech Flats Creek P BRDG 200,000 200,000 Bradford 154 090 114178 SR154 over Beech Flats Creek F BRDG 100,000 100,000 Bradford 154 090 114178 SR154 over Beech Flats Creek U BRDG 10,000 10,000 Bradford 154 090 114178 SR154 over Beech Flats Creek R BRDG 15,000 15,000 Bradford 154 090 114178 SR154 over Beech Flats Creek C BRDG 600,000 600,000 Bradford 187 068 79243 SR187ovTribWappasening Cr U BRDG 10,000 10,000 Bradford 187 068 79243 SR187ovTribWappasening Cr C BRDG 1,600,000 1,600,000 Bradford 187 069 98916 PA187ovTbSugarCrk U BRDG 10,000 10,000 Bradford 187 069 98916 PA187ovTbSugarCrk C BRDG 615,000 615,000 Bradford 187 071 98975 SR 467 to Taylor Hill Rd F HRST 10,000 10,000 Bradford 187 074 99278 SR187 over Wysox Creek P BRDG 225,000 225,000 Bradford 187 074 99278 SR187 over Wysox Creek F BRDG 150,000 150,000 Bradford 187 074 99278 SR187 over Wysox Creek U BRDG 20,000 20,000 Northern Tier 2045 Long-Range Transportation Plan 3 Projects by County, 2021-2032 Key to Phases: C = Construction; F = Final Design; P = Preliminary Design; R = Right-of-Way Acquisition; S = Study; U = Utility Relocation First Four Years, Second Four Years, Third Four Years, County S.R.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    132 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us