Hickory Hall Dormitory a Twin Study in the Making Presented by Adam J

Hickory Hall Dormitory a Twin Study in the Making Presented by Adam J

Design and Construction of the Hickory Hall Dormitory a twin study in the making Presented by Adam J. Cohen, Architect, CPHC NA & EU, LEED AP 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 7th Annual North American Passive House Conference September 27-30, 2012 Denver CO Design and Construction of the Hickory Hall Dormitory a twin study in the making Presented by Adam J. Cohen, Architect, CPHC NA & EU, LEED AP 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 7th Annual North American Passive House Conference September 27-30, 2012 Denver CO Session Learning Objectives: • Outline the envelope differences between Elm Hall (std. construction) and Hickory Hall (Passivhaus construction) • Show a basic understanding of the economic feasibility of Hickory Hall vs. Elm Hall • Describe the mechanical system strategy employed in Hickory Hall. • Describe why a dormitory with a double loaded corridor makes an efficient Passivhaus. 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 Emory and Henry College, Emory, Virginia Emory, Virginia • Founded in 1836, opened its doors to students in 1838 • Oldest college in Southwest Virginia • One of only a few colleges in the country whose entire campus is listed on the National Historic Register • Dr. Rosalind Reichard, Emory & Henry’s 20th president is very progressive 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 HICKORY CHESTNUT ELM • New residential quad planned in 2006-2008 • Elm Hall completed in 2010 • Hickory Hall to be completed December 2012 • Chestnut Hall tentative construction date 2014 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 Hickory Hall Elm Hall Under Construction Completed August 2010 • 40,000 sq ft • 36,000 sq ft • 117 beds • 116 beds • Modular wooden construction (3 floors) • Modular wooden construction (3 floors) • Full concrete basement • Partial CMU basement (balance crawl space) • Passivhaus & LEED • LEED 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 • Airtightness – not yet quantified • Hickory Hall assumed .6 ACH50 • Elm Hall assumed 6 ACH50 • Slab - Added 4” termite treated EPS • Walls • Concrete – Changed to insulated precast with interior insulated wire chase (2x4) • Walls added 2 ½” Roxul Cavity Rock exterior insulation • Roof – Added 2” cellulose • Windows - Changed to PH certified windows (25% reduction in heat demand!) 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 • Plug, Lighting & HW Load Reduction Measures • Go to 1000 rpm washers instead of 600 to reduce dryer energy (suggested 1200 rpm) • Go to motor driven elevator • Occupancy sensors everywhere • Not Implemented: • Dorm room energy feedback and competition • Solar HW heating 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 Heat Balance 300000 Annual Heat Demand = 1.5 250000 kBTU/sqft yr! 200000 /yr] Useful Internal Heat kBTU Gain [kBTU/yr] 150000 Heat [ Annual Useful Solar Heat Gain [kBTU/yr] Annual 100000 Annual Heat Losses 50000 [kBTU/yr]: 0 Losses Gains 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 • To determine room peak loads • Heating • Upper northwest corner (3 sides exposed, twin window) • Minimalist occupants • Cooling • Center south (1 side exposed, twin window) • Maximalist occupants 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 Mechanical System 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 CONTACT: [email protected] (540) 774.4800 7th Annual National Passivhaus Conference Denver, Colorado Sept. 27 – 30, 2012 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us