1-D,3-E & 8-F Type Qtrs. at Rairakhol Fire Station In

1-D,3-E & 8-F Type Qtrs. at Rairakhol Fire Station In

TENDER INVITING AUTHORITY: JOINT MANAGER (ELECTRICAL DIVISION),THE ODISHA STATE POLICE HOUSING & WELFARE CORPORATION LTD, BHUBANESWAR NAME OF THE WORK :-EXECUTION OF EXTERNAL ELECTRIFICATION WORK FOR POWER SUPPLY TO 1-D,3-E & 8-F TYPE QTRS. AT RAIRAKHOL FIRE STATION IN THE DIST. OF SAMBALPUR . BID REF NO.- 06/JM/ELECT/OPHWC/2018-19 Bidder Name SCHEDULE OF WORKS Estimated Cost in Rs. Sl. No. Description of work Unit Qty. RATE IN RS. AMOUNT IN RS. 11/.04 KV 63 KVA Transformer(Star- 1 No 1 102070.00 102070.00 1,BIS/EEL-2) 9 Mtr. Long (150X150 mm )RS Joist 2 No 3 21123.18 63369.54 Pole. A TOTAL MATERIAL COST IN RS. 165439.54 B Stock,storage and insurance (@3% on A) 4963.19 C TOTAL RS. 170402.73 D T&P @ 2% of C 3408.05 E Contigency @ 3% of C 5112.08 Transportation @ 7.5% of C+GST on F Transportation cost 14313.83 Erection charges @ 5% of C +GST on G erection charges 9542.55 TOTAL RS.(PART-A) 202779.24 1 9 Mtr. Long 300 KG PSC pole No 2 3540.00 7080.00 8 Mtr. Long 300 KG PSC pole for LT 2 Line No 12 2360.00 28320.00 A Sub Total 35400.00 B Stock,storage and insurance (@3% on A) 1062.00 C TOTAL RS.(A+B=C) 36462.00 D T&P @ 2% of C 729.24 E Contigency @ 3% of C 1093.86 Transportation @ 7.5% of C+GST @ 18% on F Transportation cost 3062.81 Erection charges @ 20% of C +GST @ 18% G on erection charges 8167.49 H TOTAL RS.(PART-B) 49515.40 1 55 sq. mm AAAC Km 0.12 35400.00 4248.00 Cost of materials for 11 kv tapping pole 2 without pole No 1 15836.31 15836.31 Materials for 11 KV line DP with AB 3 switch(400 Amp.) without pole No 1 60375.29 60375.29 Cost of 63 KVA 11/0.4 KV S/S without pole and transformer No 1 118227.74 118227.74 Cost of materials for 3 Ph 5 W LT Line 4 with 50 sq. mm AB Cable(30 Mtr. Span) without pole Km 0.35 407786.76 142725.37 A Sub Total 341412.71 B Stock,storage and insurance (@3% on A) 10242.38 C TOTAL RS.(A+B=C) 351655.09 D T&P @ 2% of C 7033.10 E Contigency @ 3% of C 10549.65 Transportation @ 7.5% of C+GST @ 12% on F Transportation cost 29539.03 Erection charges @ 10% of C +GST @ 12% G on erection charges 39385.37 H TOTAL RS.(PART-C) 438162.24 A TOTAL RS.(Part-A+Part-B+Part-C) 690456.88 PART-D 1 Boundary wall No 1 53440.00 53440.00 2 Plinth (stone masonary No 1 12794.00 12794.00 3 Metal spreading No 1 10000.00 10000.00 B Total Rs. 766690.88 766,691.00 C Total Estimated Cost in Figures EXCESS LESS (Please Tick) _________% Quoted Amount in Figure Quoted Amount in words N:B- The Estimated cost is inclusive of GST.(Except sl no. 1-3 of PART-D) Signature of Tenderer with seal Sd/- Sd/- Asst. Project Manager[Elect.] APM Elect. (Hqr.) Sd/- Sd/- Consultant(Elect.) JointJoint Manager(Elect Manager(Elect.).).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us