SCHOOL IMPROVEMENT PLAN (SIP) 2017 – 2020 Year 1 of 3

SCHOOL IMPROVEMENT PLAN (SIP) 2017 – 2020 Year 1 of 3

Aberdare Community School Ysgol Gymunedol Aberdâr SCHOOL IMPROVEMENT PLAN (SIP) 2017 – 2020 Year 1 of 3 Strategic Goals 1. Achieving excellence in learning and teaching 2. Improving success in pupil outcomes 3. Developing a skills-focused curriculum 4. Building our community 1 CONTENTS Page School Overview - (context, process , vision, performance and strategic goals) Strategic Goal 1: Achieving Excellence in Learning and Teaching 1A: Quality of Teaching 1B: Behaviour for Learning Strategic Goal 2: Improving Success in Pupil Outcomes 2A: Global Grade Tracking 2B: Reporting and Assessment 2C: Improving eFSM performance Strategic Goal 3: Developing a Skills-Focused Curriculum 3A: Successful Futures 3B: Curriculum Redesign 3C: Interventions Strategic Goal 4: Building our Community 4A: Leadership 4B: Community Partnership Appendices 1. Key Performance Targets 2. SIP EIG/PDG Grant spending 2 Index Aberdare Community School The School Context Aberdare Community School is an 11 to 18 mixed comprehensive school situated in the centre of Aberdare within Rhondda Cynon Taff. The school opened in September 2014, following the closure of three small comprehensive schools (Aberdare Girls’ School, Aberdare High School and Blaengwawr Comprehensive School). The school operated on a split-site basis in 2014/15 by using the buildings of the three legacy schools. In May 2015 the school moved into a new state-of-the-art facility as part of the Welsh Government 21st Century Schools Initiative. Currently the school has 1358 pupils, including 245 pupils in the sixth form. Around 30% of pupils are entitled to free school meals, which is above the Welsh average of 17.7% for secondary schools. About 29% of pupils are on the school’s special educational needs register, which is higher than the Wales average of 19.2%. 2% of pupils have statements of special educational needs compared with 2.7% for Wales as a whole. The school has a local authority special educational needs facility, known as the Astra and Sirius units, for pupils on the autistic spectrum. Almost all pupils come from English-speaking homes. Very few pupils speak Welsh as their first language and very few speak English as a second language. A small number of pupils are from a minority ethnic or mixed-race background. The headteacher was appointed in April 2017. The senior leadership team consists of the headteacher, one deputy headteacher and five assistant headteachers. The individual school budget per pupil for Aberdare Community School in 2016-2017 was £ 2,926.18 for Years 7-9; £ 3,695.01 for Year 10; and £ 3,925.01 for Year 11. The School Improvement Process The SIP is a dynamic plan, designed to provide a strategic approach to school improvement at Aberdare Community School. The strategic goals provide the main priorities for improvement and will provide the basis for change over the three-year period. Whilst we respond to internal pressures and external influences from the Local Authority, the Central South Consortium and Welsh Government policies, the SIP will provide a flexible framework for future success. As we progress through the three years, our strategic goals may evolve as we monitor, evaluate and review provision. This plan includes high level priorities, actions and targets for the 2017/18 academic year. Progress against these targets will be reviewed each term, with a final evaluation at the end of the academic year which, in conjunction with the school’s Self Evaluation Report, will enable more detailed planning for the next academic year. The SIP is a fully costed plan which details how the school is managing both the PDG and the EIG grant funding. The SIP is linked to Departmental Improvement Plans (DIPs) in order to ensure sustained improvement across all curriculum areas. 3 Long Term Goals – 3 Year Plan What We Want to Achieve Strategic Goal Year 1 (2017/18) Year 2 (2018/19) Year 3 (2019/20) Achieving excellence Introduce new teaching and learning To reduce the number of days lost to To reduce the number of days lost to in learning and behaviour for learning strategies, in fixed term exclusions by a further fixed term exclusions by a further order to improve the quality of 10%. 10%. teaching teaching and reduce the impact of To ensure that almost all learning To review and refine the Aberdare poor behaviour – reducing days lost to experiences are good or better as Learning Cycle, incorporating national FTEs by 25%. Aberdare Learning Cycle becomes developments (successful futures etc.) fully embedded. Improving success in An improvement in Key Stage 4 Key An improvement in Key Stage 4 Key An improvement in Key Stage 4 Key pupil outcomes Performance Indicators, showing a Performance Indicators, showing a Performance Indicators, showing a continuing upward trend. continuing upward trend. continuing upward trend. Building our Level 2+: 45% or Q2 Level 2+: 50% or Q1 Level 2+: 15% above modelled community Capped 9: 350 or +20 v modelled Capped 9: 360 or +30 v modelled expectation expectations expectations Capped 9: 10% above modelled WBQ L2: 45% or Q2 WBQ L2: 50% or Q2 expectation WBQ L2: Q1 Developing a skills- To fully embed the LNF in all To quality assure the provision for To further embed the skills rich focused curriculum curriculum areas across the school skills within lessons and the impact of curriculum and focus on preparations and ensure that the DCF is covered interventions, ensuring that all pupils for the introduction of successful where appropriate. To develop cross- make appropriate progress in literacy, futures curriculum. curricular projects in preparation for numeracy and digital competence. curriculum reform. Building our To successfully introduces strategic To review curriculum provision in line To ensure that the school is ready for community developments. To continue to build with national priorities and possibly a new curriculum for Wales and that partnership working with local introduce a 3-year Key Stage 4. To partnership working contributes community. To raise the profile of the continue to develop community links. significantly to improving pupil school. outcomes. 4 Strategic Goal 1: Summary of High Level Priorities 2017/18 1A Quality of Teaching EH / MJN / MPR Achieving Excellence in Learning and Teaching 1B Behaviour for Learning MJN / SW 5 Aberdare Community School School Improvement Plan 2017/18 (Year 1 of 3) To improve the quality of learning and teaching across the curriculum, ensuring 1. Achieving excellence in 2017/18 Strategic Goal Priority : that teaching is successful in engaging Timescale: learning and teaching Year 1 of 3 pupils’ interests and maximising pupil progress. Lead CIF Link 3.1, 5.3 EH / MJN / MPR Responsibility: Strategies By By Resources / Success Criteria Evaluation When? Who? Budget To form a task and finish group to review 09/2017 EH Meeting Time Group has successfully created a Task and Finish group have the “Aberdare Lesson” and create a INSET Day new shared lesson format. revised the “Aberdare revised lesson format for the school (The Lesson” and shared with all Aberdare Learning Cycle) and ensure all staff. staff are aware of the revised structure. To ensure that all staff become more 07/2018 EH Meeting Time All teachers participate in both peer All teachers are part of peer reflective practitioners through effective Cover observations and the sharing good observation groups. peer observations and a sharing best INSET Time practice INSET programme. Teaching and Learning practice INSET day. Inset scheduled for Summer. To monitor the revised lesson structure 07/2018 MJN Meeting Time Whole school and departmental Quality assurance and the quality of teaching and learning LoLs quality assurance calendars are in calendars are in place and via both whole-school and departmental place and evidences an regular QA activity has quality assurance procedures. improvement in the quality of shown improvements in teaching. teaching and learning within many departments. To ensure that staff CPD contributes 07/2018 MPR CPD Budget (EIG) Evaluations of CPD provision Staff complete evaluation significantly to improving the quality of demonstrate the impact of forms following Inset and learning and teaching across the school. professional learning on day-to-day feedback to colleagues. practice. 6 Aberdare Community School School Improvement Plan 2017/18 (Year 1 of 3) To ensure that pupils demonstrate good 1. Achieving excellence in 2017/18 Strategic Goal Priority : behaviour in lessons and around the school, Timescale: learning and teaching Year 1 of 3 ensuring a positive attitude to learning. Lead CIF Link 2.2, 3.1 MJN / SW / MPR / TN Responsibility: Strategies By By Resources / Success Criteria Evaluation When? Who? Budget To create a staff behaviour forum to 09/2017 SW Meeting Time A revised behaviour management Behaviour Forum meets evaluate and revise the systems in place Visits to Other system is in place and used by all regularly. New behaviour to track and monitor pupil behaviour. Schools staff. system successfully INSET time introduced. To review whole-school and departmental 09/2018 MJN / Meeting Time Revised sanctions lead to a Revised sanctions in place sanctions to ensure better consistency and EH/ SW Visits to Other reduction of FTEs and but not had necessary improve attitudes to learning and Schools improvement in attendance figures. impact on reducing attendance. SIG Working Gp exclusions / poor attendance. To improve attendance rates and achieve 07/2018 EH Meeting Time To meet RCT target. We are currently 2.2% the RCT 2017/18 target below aspirational RCT target – this trend is mirrored across LA. Suitable strategies are in place with support of LA. To introduce Clean Slate as a way of 09/2017 MJN Meeting Time There is a substantial increase in Clean slate is in place and rewarding pupils who do not accrue any Inset Time the number of pupils receiving there has been a significant behaviour points over a period.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    28 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us