Infrastructure Key Projects Export

Infrastructure Key Projects Export

Country Project Name Main Sector Sector Public/Private Procurement Type PPP Model Value (USDmn) Size Unit Companies Timeframe Start Timeframe End Status Status Notes February 2016 - Construction halted as reports conducted by Saudi Aramco revealed the proposed airport location site may suggest an oil and gas opportunity; July 2015 - Soclesa Arabia awarded USD121mn equipment contract; June 2014 - Safari Co. won Saudi Arabia New King Abdullah Bin Abdulaziz Airport, Jazan Transport Airports Public 667 2.4 mn passengers/yr Edge architects[Design/Architect]{United Kingdom}, [Sponsor] Suspended construction contract; Project is part of USD10.66bn investment plan in the aviation infrastructure sector June 2012 - Section 3 opened to traffic; Section 1, Salalah-Thumrait (21-km) opened to traffic in early 2011; Section 2, from Wadi Oman Salalah-Thumrait Dual-Carriageway, Dhofar Transport Roads & Bridges Public 144.64 77 km Oman Ministry of Transport and Communication[Sponsor]{Oman} 2012 Completed Hareit till the Thumrait-Marmul intersection (51-km) was opened last January; Project Value - OMR55.70mn Public Authority for Civil Aviation[Operator]{Oman}, Oman Airports Management Company- OAMC[Operator]{Oman}, Special Economic Zone Authority[Sponsor]{Oman}, Hanjin Heavy Industries and Construction[Construction]{South Korea}, Oman Ministry of Transport and Oman Duqm International Airport, Phase II (Runway), Al Wusta Transport Airports Public 104 0.5 mn passengers/yr Communication[Sponsor]{Oman} 2011 2013 Completed December 2013 - Project completed; Project cost - OMR40mn April 2013 - Project will provide drinking water to more than 1.5mn people aimed at serving the potable water demands of five large Iran Persian Gulf Coast Water Supply Pipeline Energy & Utilities Water Public 243 762 km Government of Iran[Sponsor]{Iran} Announced cities and eleven small cities along the Persian Gulf coasts; Preliminary studies were completed in 1995 General Electric[Equipment]{United States}, Lebanese Government[Sponsor]{Lebanon}, J&P- January 2015 - Deir Amar plant is looking for funding ; July 2013 - Tender for supervision and management for the project has been Lebanon The Deir Ammar Combined Cycle Plant, Tripoli Energy & Utilities Power Plants & transmission grids Public 470 590 MW AVAX[Construction]{Greece} Contract Awarded launched; April 2013 - The plant will take around 25 months to build - with the first phase due to open in 18 months April 2013 - The Saudi Electricity Company (SEC) has signed contracts worth SAR1.376 (USD365mn) for the construction of 2 Saudi Arabia Al Kharj 2 Substation, Riyadh Energy & Utilities Power Plants & transmission grids Public 380 kV Siemens AG[Equipment]{Germany}, Saudi Electricity Company[Sponsor]{Saudi Arabia} Contract Awarded transmission plant in Al-Kharj and Salboukh and 5 five gas-powered generating units Royal Haskoning[Consultant/Project Management]{Netherlands}, Jan De Nul Group[Construction]{Belgium}, Khatib & Alami[Feasibility]{Lebanon}, Government of Oman[Sponsor]{Oman}, Galfar Engineering & Contracting SAOG[Construction]{Oman}, Daewoo Engineering & Construction Company[Construction]{South Korea}, CCC June 2016 - Construction underway; November 2015 - Duqm Port to begin early phase container operations in early 2016; Project Oman Duqm Port Expansion Project, Al Duqm Transport Ports Public 687 Engineering[Construction]{Greece} Under construction includes new port and dry-dock complex; Project cost - EUR620mn Oman Supreme Committee for Town Planning[Operator]{Oman}, Consolidated Contractors Company August 2016 - Tendering and bidding process for Phase 2, sections 1 & 2 to be launched Q4 2016; May 2015 - Construction underway; Oman Al Batinah Coastal Road Project, Muscat Transport Roads & Bridges Public 1500 240 km (CCC)[Consultant/Project Management]{Greece} Under construction January 2015 - Packages three and six of the Al Batinah coastal road project, with a combined value of USD1.34 bn awarded last year SNC-Lavalin[Construction]{Canada}, Qatargas[Operator]{Qatar}, Chiyoda Corporation[Construction]{Japan}, CTCI Corp[Construction]{Taiwan}, Total[Sponsor]{France}, Kentz Corporation Limited[Construction]{United Kingdom}, Mitsui[Sponsor](1){Japan}, November 2015 - Construction underway; Qatar Kentz has been awarded engineering, procurement, supply, construction and Marubeni[Sponsor](1){Japan}, Cosmo Oil[Sponsor](2){Japan}, Idemitsu Kosan[Sponsor](2){Japan}, commissioning of contract by Qatargas; April 2014 - Construction commenced; The facility will enhance Laffan Refinery 1 condensate Qatar Qatargas Laffan Refinery- Phase II, Ras Laffan, Doha Construction Industrial Construction Public Engineer Procure Construct (EPC) 1500 146000 b/d Qatar Petroleum[Sponsor](84){Qatar} 2014 2016 Under construction refining capacity to 300,000 b/d GE Power[Equipment]{United States}, Salalah Power and Water Company[Sponsor]{Oman}, SEPCO Electric Power Construction Corporation[Construction]{China}, Sembcorp May 2012 - Project completed; The project also has an associated desalination plant with capacity of 69,000 m3/day; 15 year power Oman Salalah - 1 IWPP, Taqah, Dhofar Energy & Utilities Power Plants & transmission grids Public 1000 490 MW Industries[Operator]{Singapore}, Teejan Group[Construction]{Oman} 2010 2012 Completed and water purchase agreement with OPWP; Net capacity is 445 MW Iraq Golden City Housing, Basra Construction Commercial Construction Public 250 600000 square metres Mister Wang Company[Construction]{Hong Kong}, Basra Governorate[Sponsor]{Iraq} Contract Awarded May 2013 - Contract awarded to Mister Wang; The duration of the project will be three years Abraj Al-Hilal 2 Residential Complex, Jeddah Gate, Emaar (UAE)[Operator]{United Arab Emirates}, Azmeel Contracting & Construction Saudi Arabia Makkah Construction Residential Construction Private 308 units Corporation[Construction]{Saudi Arabia} Under construction November 2015 - Construction underway Aeroports de Paris SA[Consultant/Project Management]{France}, Cowi[Consultant/Project Management]{Denmark}, Europe Arab Bank (EAB)[Financier]{United Kingdom}, Oman Arab bank[Financier]{Oman}, Oman Airports Management Company-OAMC[Operator]{Oman}, Consolidated December 2014 - Project completed successfully with completion of the new civil aviation building, a runway and air traffic control Oman Muscat International Airport Upgrade, Phase I Transport Airports Public 1800 4 km Contractors Company (CCC)[Construction]{Greece}, TAV Construction[Construction]{Turkey} 2014 Completed tower Agricultural Bank of China (ABC)[Financier]{China}, Arab African International Bank[Financier]{Egypt}, Invest Bank[Financier]{United Arab Emirates}, Bank of China[Financier]{China}, China Minsheng Banking Corporation[Financier]{China}, Industrial and Commercial Bank of China (ICBC)[Financier]{China}, Abu Dhabi Islamic Bank[Financier]{United Arab Emirates}, Viceroy Hotel and September 2015 - SKAI Holdings secured USD300mn syndicated finance package for the project; January 2015 - Structural work almost Resorts[Operator]{United States}, Skai Holdings[Operator]{United Arab Emirates}, China State complete, project is six months ahead of schedule; December 2013 - Enabling and piling works nearing completion; Hotel will offer United Arab Emirates Viceroy Dubai Palm Jumeirah Project, Dubai Construction Commercial Construction Private 1100 947000 square metres Construction Engineering Corporation (CSCEC)[Construction]{China} 2013 2016 Under construction 479 luxurious rooms and suites and 222 signature Viceroy Residences; Project cost - AED4.05bn Aldara Medical Corporation[Operator]{Saudi Arabia}, Drake & Scull International[Construction]{United Arab Emirates}, HOK[Design/Architect]{United States}, Hobbs + Black Associates Inc[Design/Architect]{United States}, Faithful+Gould[Construction]{United Kingdom}, Carillion May 2016 - Opening of facility is now less than 6 months away; September 2014 - Drake & Scull Saudi Arabia won an AED189mn MEP Saudi Arabia Al-Dara Hospital and Medical Centre - Phase II, Riyadh Social Infrastructure Healthcare Public 118 Plc[Construction]{United Kingdom} 2016 Under construction contract; Completion expected by 2016; Total construction area - 103000 square metres Abu Dhabi Industrial City Waste-to-Energy Power Tecam Group[Construction]{Spain}, Intecsa Industrial[Construction]{Spain}, Abu Dhabi National Energy June 2015 - Tecam Group subcontracted by EPC Intecsa Industrial to deliver a waste to energy plant in the United Arab Emirates United Arab Emirates Project, Abu Dhabi Energy & Utilities Power Plants & transmission grids Public 850 100 MW Company (TAQA)[Sponsor]{United Arab Emirates} Contract Awarded (UAE) Aldar Properties PJSC[Operator]{United Arab Emirates}, Athena SA[Construction]{Greece}, J&P- United Arab Emirates Second Marina Project ,Yas Island, Abu Dhabi Transport Ports Public AVAX[Construction]{Greece} Contract Awarded May 2013 - Construction contract worth AED590.1mn awarded to Athena SA, a subsidiary of J&P Avax Diba-Lima-Khasab Carriageway Project, Musandam March 2015 - Oman’s Transport and Communications Ministry has prequalified nine consortiums of contractors for the contruction of Oman Governorate (Section -2) Transport Roads & Bridges Public 1000 65 km Oman Ministry of Transport and Communication[Sponsor]{Oman}, Cowi[Design/Architect]{Denmark} In tender/Tender launched the project; DBO contract to float shortly; May 2014 - Project Management Consultant (PMC) tender floated November 2012 - Madrid Industrial Company plans to build new industrial

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us