Airmyn Map ID: 1

Airmyn Map ID: 1

Airmyn Map ID: 1 SHLAAID: Airmyn1 JSP Sub Area: Western Settlement hierarchy: Other Allocations DPD Ref: N/A Type: Permission SiteDate of permission: 11/03/2009 Location: 107 High Street Reason Considered: Site with planning permission DC/06/06005/OUT Area (ha):0.28 Developable area ratio (%): Net developable area (ha): Density (dph):29 Net capacity: 8 Capacity remaining: 8 GF/PDL: Brownfield National/Regional Policy Restrictions: N/A Level of Flooding (SFRA): Whole of site in Tidal Flood Zone 3a. Danger to all from defence breaching. Less than 6 hours warning time. Physical Limitations: N/A Ownership Details: N/A Can Availability and Suitability Constraints be Overcome?: N/A Lead in times (years): 1.5 Build rates 2011-12: 4 Build rates 2012-13: 6 Build rates 2013-2014+: 8 Overall Deliverability: Deliverable in 0-5 years Deliverable in years 0-5 :8 Deliverable in years 6-10 : 0 Deliverable in years 11-15 : 0 Strategic Housing Land Availability Assessment September 2011 Page 1 of 784 Alamein Barracks Map ID: 1 SHLAAID: Alamein Barracks1 JSP Sub Area: Northern Settlement hierarchy: DS2 Allocations DPD Ref: DRF22 Type: Potential Site Date of permission: Location: Land east of Auchinleck Close Reason Considered: Land bids 1195, 1449. Area (ha):1.00 Developable area ratio (%): 75% Net developable area (ha): 0.75 Density (dph):35 Net capacity: 26 Capacity remaining: 26 GF/PDL: Greenfield National/Regional Policy Restrictions: None Level of Flooding (SFRA): Flood Zone 1 Physical Limitations: None Ownership Details: Owner: Broadland Properties. Agent: Walton & Co. Can Availability and Suitability Constraints be Overcome?: No Constraints Lead in times (years): 2.5 Build rates 2011-12: 15 Build rates 2012-13: 20 Build rates 2013-2014+: 25 Overall Deliverability: Deliverable in 0-5 years Deliverable in years 0-5 :26 Deliverable in years 6-10 : 0 Deliverable in years 11-15 : 0 Strategic Housing Land Availability Assessment September 2011 Page 2 of 784 Alamein Barracks Map ID: 2 SHLAAID: Alamein Barracks2 JSP Sub Area: Northern Settlement hierarchy: DS2 Allocations DPD Ref: DRF19 Type: Potential Site Date of permission: Location: Land between Ramsden Close and Auchinleck Close Reason Considered: Land bid 660 Area (ha):11.10 Developable area ratio (%): 75% Net developable area (ha): 8.33 Density (dph):35 Net capacity: 291 Capacity remaining: 291 GF/PDL: Greenfield National/Regional Policy Restrictions: None Level of Flooding (SFRA): Flood Zone 1 Physical Limitations: None Ownership Details: Agent: Barclay Simpson Can Availability and Suitability Constraints be Overcome?: No Constraints Lead in times (years): 2.5 Build rates 2011-12: 45 Build rates 2012-13: 55 Build rates 2013-2014+: 70 Overall Deliverability: Deliverable in 0-10 years Deliverable in years 0-5 :175 Deliverable in years 6-10 : 116 Deliverable in years 11-15 : 0 Strategic Housing Land Availability Assessment September 2011 Page 3 of 784 Alamein Barracks Map ID: 3 SHLAAID: Alamein Barracks3 JSP Sub Area: Northern Settlement hierarchy: DS2 Allocations DPD Ref: DRF18 Type: Potential Site Date of permission: Location: Alamein Barracks Reason Considered: Land bid 1362 NLUD 145 Area (ha):26.87 Developable area ratio (%): 75% Net developable area (ha): 20.2 Density (dph):60 Net capacity: 1209 Capacity remaining: 1209 GF/PDL: Greenfield/Brownfield National/Regional Policy Restrictions: None Level of Flooding (SFRA): Flood Zone 3a along northern and eastern parts of the site. Physical Limitations: None Ownership Details: Owner: Omnivale Ltd/ Strawsons Agent: Antony Asbury Associates Can Availability and Suitability Constraints be Overcome?: To be determined through site specific flood risk assessment. Lead in times (years): 2.5 Build rates 2011-12: 60 Build rates 2012-13: 80 Build rates 2013-2014+: 105 Overall Deliverability: Deliverable in 11-16 years Deliverable in years 0-5 :263 Deliverable in years 6-10 : 525 Deliverable in years 11-15 : 421 Strategic Housing Land Availability Assessment September 2011 Page 4 of 784 Alamein Barracks Map ID: 4 SHLAAID: Alamein Barracks4 JSP Sub Area: Northern Settlement hierarchy: DS2 Allocations DPD Ref: DRF23 Type: Potential Site Date of permission: Location: Land North East Of Auchinleck Close Reason Considered: Land bid 1749 Area (ha):5.53 Developable area ratio (%): 75% Net developable area (ha): 4.15 Density (dph):35 Net capacity: 145 Capacity remaining: 145 GF/PDL: Greenfield National/Regional Policy Restrictions: N/A Level of Flooding (SFRA): Flood Zone 3a along northern and eastern parts of the site. Physical Limitations: None Ownership Details: Owner: Sunderlandwick Farms. Agent: Pegasus Planning Group Can Availability and Suitability Constraints be Overcome?: To be determined through site specific flood risk assessment. Lead in times (years): 2.5 Build rates 2011-12: 25 Build rates 2012-13: 30 Build rates 2013-2014+: 35 Overall Deliverability: Deliverable in 0-10 years Deliverable in years 0-5 :88 Deliverable in years 6-10 : 57 Deliverable in years 11-15 : 0 Strategic Housing Land Availability Assessment September 2011 Page 5 of 784 Aldbrough Map ID: 1 SHLAAID: Aldbrough1 JSP Sub Area: Eastern Settlement hierarchy: DS4 Allocations DPD Ref: ALD1 Type: Potential Site Date of permission: Location: Land at Aldbrough Hall Reason Considered: Land bid 1262 Area (ha):1.57 Developable area ratio (%): 75% Net developable area (ha): 1.18 Density (dph):30 Net capacity: 35 Capacity remaining: 35 GF/PDL: Greenfield National/Regional Policy Restrictions: None Level of Flooding (SFRA): Flood Zone 1 Physical Limitations: None Ownership Details: Owner: Elisabeth & Stephen Boddy Can Availability and Suitability Constraints be Overcome?: No Constraints Lead in times (years): 2.5 Build rates 2011-12: 15 Build rates 2012-13: 20 Build rates 2013-2014+: 25 Overall Deliverability: Deliverable in 0-5 years Deliverable in years 0-5 :35 Deliverable in years 6-10 : 0 Deliverable in years 11-15 : 0 Strategic Housing Land Availability Assessment September 2011 Page 6 of 784 Aldbrough Map ID: 2 SHLAAID: Aldbrough2 JSP Sub Area: Eastern Settlement hierarchy: DS4 Allocations DPD Ref: ALD2 Type: Potential Site Date of permission: Location: Land west of Hornsea Road Reason Considered: Land bids 1210, 668, 1225, 1220 Area (ha):0.90 Developable area ratio (%): 75% Net developable area (ha): 0.68 Density (dph):30 Net capacity: 20 Capacity remaining: 20 GF/PDL: Greenfield National/Regional Policy Restrictions: None Level of Flooding (SFRA): Flood Zone 3a on the northeastern edge of the site. Physical Limitations: None Ownership Details: Agent: Frank Hill & Son/ Hickling Gray Associates Can Availability and Suitability Constraints be Overcome?: To be determined through site specific flood risk assessment. Lead in times (years): 2.5 Build rates 2011-12: 15 Build rates 2012-13: 20 Build rates 2013-2014+: 25 Overall Deliverability: Deliverable in 0-5 years Deliverable in years 0-5 :20 Deliverable in years 6-10 : 0 Deliverable in years 11-15 : 0 Strategic Housing Land Availability Assessment September 2011 Page 7 of 784 Aldbrough Map ID: 3 SHLAAID: Aldbrough3 JSP Sub Area: Eastern Settlement hierarchy: DS4 Allocations DPD Ref: ALD3 Type: Allocation Date of permission: Location: Land north of North Street Reason Considered: Housing Allocation ALD1, NLUD 254 Area (ha):0.87 Developable area ratio (%): 75% Net developable area (ha): 0.65 Density (dph):30 Net capacity: 20 Capacity remaining: 20 GF/PDL: Brownfield National/Regional Policy Restrictions: None Level of Flooding (SFRA): Flood Zone 1 Physical Limitations: Potential area of contaminated land (Pig Farm) Ownership Details: No Bid Submitted Can Availability and Suitability Constraints be Overcome?: Land remediation may be required. Pending owner/developer interest Lead in times (years): 2.5 Build rates 2011-12: 15 Build rates 2012-13: 20 Build rates 2013-2014+: 25 Overall Deliverability: Deliverable in 0-5 years Deliverable in years 0-5 :20 Deliverable in years 6-10 : 0 Deliverable in years 11-15 : 0 Strategic Housing Land Availability Assessment September 2011 Page 8 of 784 Aldbrough Map ID: 4 SHLAAID: Aldbrough4 JSP Sub Area: Eastern Settlement hierarchy: DS4 Allocations DPD Ref: N/A Type: Permission SiteDate of permission: 06/12/2005 Location: 36 North Street Reason Considered: Site with planning permission DC/05/04156/PLF Area (ha):0.07 Developable area ratio (%): Net developable area (ha): Density (dph):150 Net capacity: 10 Capacity remaining: 2 GF/PDL: Brownfield National/Regional Policy Restrictions: N/A Level of Flooding (SFRA): Flood Zone 1 Physical Limitations: N/A Ownership Details: N/A Can Availability and Suitability Constraints be Overcome?: N/A Lead in times (years): 0 Build rates 2011-12: 4 Build rates 2012-13: 6 Build rates 2013-2014+: 8 Overall Deliverability: Deliverable in 0-5 years Deliverable in years 0-5 :2 Deliverable in years 6-10 : 0 Deliverable in years 11-15 : 0 Strategic Housing Land Availability Assessment September 2011 Page 9 of 784 Aldbrough Map ID: 5 SHLAAID: Aldbrough5 JSP Sub Area: Eastern Settlement hierarchy: DS4 Allocations DPD Ref: N/A Type: Permission SiteDate of permission: 12/06/2001 Location: East Hill Farm Hornsea Road Reason Considered: Site with planning permission DC/01/02131/PLF Area (ha):0.07 Developable area ratio (%): Net developable area (ha): Density (dph):30 Net capacity: 2 Capacity remaining: 2 GF/PDL: Greenfield National/Regional Policy Restrictions: N/A Level of Flooding (SFRA): Flood Zone 1 Physical Limitations: N/A Ownership Details: N/A Can Availability and Suitability

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    784 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us