Exhibit E Lowell Hydroelectric Project (FERC No

Exhibit E Lowell Hydroelectric Project (FERC No

Draft License Application Volume II of II Part 1 - Exhibit E Lowell Hydroelectric Project (FERC No. 2790) December 2, 2020 Prepared by: Prepared for: Boott Hydropower, LLC Manchester, New Hampshire Draft License Application Volume II of II (Part 1) Lowell Hydroelectric Project This page is intentionally blank. ii | December 2, 2020 Table of Contents Lowell Hydroelectric Project Table of Contents Exhibit E Environmental Report (18 C.F.R. § 5.18) .............................................................................. E-1 E.1 Introduction .................................................................................................................................. E-1 E.2 General Description of the River Basin (18 C.F.R. § 5.18 (b)(1)) ................................................ E-6 E.2.1 Drainage Area and Length of River ..................................................................................... E-6 E.2.2 Tributary Rivers and Streams .............................................................................................. E-6 E.2.3 Topography ......................................................................................................................... E-6 E.2.4 Dams and Diversion Structures within the Basin ................................................................ E-9 E.2.5 Wetland and Vegetative Cover.......................................................................................... E-10 E.2.6 Climate .............................................................................................................................. E-11 E.2.7 Major Land and Water Uses .............................................................................................. E-11 E.2.8 Economic Activities ........................................................................................................... E-12 E.3 Cumulative Effects (18 C.F.R. § 5.18(b)(2)) .............................................................................. E-13 E.3.1 Resources That Could Be Cumulatively Affected ............................................................. E-13 E.3.2 Geographic Scope ............................................................................................................. E-13 E.3.3 Temporal Scope ................................................................................................................ E-13 E.4 Compliance with Applicable Laws (18 C.F.R. § 5.18 (b)(3)) ...................................................... E-14 E.4.1 Section 401 of the Clean Water Act .................................................................................. E-14 E.4.2 Endangered Species Act ................................................................................................... E-14 E.4.3 Magnuson-Stevens Fishery Conservation Management Act ............................................ E-14 E.4.4 Coastal Zone Management Act ......................................................................................... E-15 E.4.5 National Historic Preservation Act ..................................................................................... E-15 E.4.6 Wild and Scenic Rivers and Wilderness Act ..................................................................... E-16 E.5 Project Facilities and Operation (18 C.F.R. § 5.18(b)(4)) .......................................................... E-17 E.5.1 Maps of Project Facilities within Project Boundaries (18 C.F.R. § 5.18(b)(4)(i)) .............. E-17 E.5.2 Project Location and Facilities Overview (18 C.F.R. § 5.18(b)(4)(ii)) ................................ E-17 E.5.3 Existing Structures Created Before Project Redevelopment ............................................ E-20 E.5.4 Structures Constructed During Project Redevelopment ................................................... E-24 E.5.5 Estimated Average Annual Energy Production (18 C.F.R. §5.18(b)(4)(v) ........................ E-28 E.5.6 Estimated Dependable Capacity (18 C.F.R. §5.18(b)(4)(v) .............................................. E-30 E.5.7 Current and Proposed Project Operations (18 C.F.R. §5.18(b)(4)(vi) .............................. E-30 E.5.8 Pneumatic Crest Gate Operations .................................................................................... E-30 E.5.9 Proposed Project Operations (18 C.F.R. §5.18(b)(4)(vi) .................................................. E-34 E.6 Proposed Action and Action Alternatives ................................................................................... E-35 E.6.1 Summary of Existing Measures ......................................................................................... E-35 E.6.2 Summary of Proposed Measures ...................................................................................... E-36 E.7 Environmental Analysis by Resource Area ................................................................................ E-38 E.7.1 Geology and Soil Resources ............................................................................................. E-39 E.7.2 Water Quantity and Quality ............................................................................................... E-55 E.7.3 Fish and Aquatic Resources ............................................................................................. E-79 E.7.4 Terrestrial Resources ...................................................................................................... E-106 E.7.5 Rare, Threatened and Endangered Species ................................................................... E-138 E.7.6 Recreation and Land Use ................................................................................................ E-146 E.7.7 Aesthetics and Socioeconomic Resources ..................................................................... E-167 E.7.8 Cultural Resources .......................................................................................................... E-179 E.8 Economic Analysis ................................................................................................................... E-191 December 2, 2020 | iii Table of Contents Lowell Hydroelectric Project E.9 Consistency with Comprehensive Plans .................................................................................. E-192 E.9.1 Federal Plans .................................................................................................................. E-192 E.9.2 Massachusetts Comprehensive Plans ............................................................................ E-193 E.9.3 New Hampshire Comprehensive Plans .......................................................................... E-194 E.10 Consultation Documentation .................................................................................................... E-195 E.11 Literature Cited ......................................................................................................................... E-196 Table of Figures Figure E.1-1. Lowell Project Location Map ............................................................................................... E-2 Figure E.2-1. Merrimack River Watershed and Major Subbasins............................................................. E-8 Figure E.5-1. Lowell Hydroelectric Project Canal System Map – Existing Facilities .............................. E-19 Figure E.7-1. Lowell Project Topographic Map Showing Existing Project Boundary ............................. E-40 Figure E.7-2. Lowell Project Topographic Map ....................................................................................... E-41 Figure E.7-3. Lowell Project Topographic Map ....................................................................................... E-42 Figure E.7-4. Lowell Project Topographic Map ....................................................................................... E-43 Figure E.7-5. Lowell Project Topographic Map ....................................................................................... E-44 Figure E.7-6. Lowell Project Topographic Map ....................................................................................... E-45 Figure E.7-7. Lowell Project Topographic Map ....................................................................................... E-46 Figure E.7-8. Merrimack River Watershed Bedrock Geology ................................................................. E-48 Figure E.7-9. Lowell Project Soils Map ................................................................................................... E-52 Figure E.7-10. Lowell Project Soils Map ................................................................................................. E-53 Figure E.7-11. Lowell Project Soils Map ................................................................................................. E-54 Figure E.7-12. USGS and STORET Water Quality Sample Locations ................................................... E-63 Figure E.7-13. Water Temperature Data Collected at USGS Gage 01100000 Merrimack River BL Concord River at Lowell, MA on the Merrimack River, 1998 – 2004 ...................................................... E-65 Figure E.7-14. Dissolved Oxygen Data Collected at USGS Gage 01100000 Merrimack River BL Concord River at Lowell, MA on the Merrimack River, 1998 – 2004 ..................................................................... E-65 Figure E.7-15. Dissolved Oxygen Percent Saturation Data Collected at USGS Gage 01100000 Merrimack River BL Concord River

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    216 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us