Site Management Plan

Site Management Plan

Site Management Plan 402 & 430 Buffalo Avenue Site BCP Site No. C932164 Niagara Falls, New York Revised December 2015 0294-013-001 Prepared For: Merani Hospitality, Inc. Prepared By: In Association With: B n vi ronmental ng i neeri n g cience, 2558 Hamburg Turnpike, Suite 300, Buffalo, New York 14218 | phone: (716) 856-0599 | fax: (716) 856-0583 BROWNFIELD CLEANUP PROGRAM SITE MANAGEMENT PLAN 402 and 430 BUFFALO AVENUE SITE NYSDEC SITE NUMBER: C932164 NIAGARA FALLS, NEW YORK Revised December 2015 0294-013-001 Prepared for: Merani Hospitality, Inc. 7001 Buffalo Avenue Niagara Falls, New York Prepared By: B Benchmark Environmental Engineering & Science, PLLC nvironmen tal ngineering 2558 Hamburg Turnpike, Suite 300 cence,i Buffalo, NY 14218 (716) 856-0599 In Association With: TurnKey Environmental Restoration, LLC 2558 Hamburg Turnpike, Suite 300 Buffalo, NY 14218 (716) 856-0635 Revisions to Final Approved Site Management Plan: Revision # Submitted Date Summary of Revision DEC Approval Date SITE MANAGEMENT PLAN 402 and 430 BUFFALO AVENUE SITE Table of Contents ES EXECUTIVE SUMMARY…………………………………………………………..ES1 1.0 INTRODUCTION ...................................................................................................... 1 1.1 General .........................................................................................................................1 1.2 Revisions ......................................................................................................................2 1.3 Notifications .................................................................................................................2 2.0 SUMMARY OF PREVIOUS INVESTIGATION & REMEDIAL ACTIONS ....................... 5 2.1 Site Location and Description ......................................................................................5 2.2 Physical Setting ............................................................................................................5 2.2.1 Land Use ......................................................................................................................................... 5 2.2.2 Geology ............................................................................................................................................. 6 Overburden ....................................................................................................................... 6 Bedrock ............................................................................................................................ 6 2.2.3 Hydrogeology ..................................................................................................................................... 7 2.3 Investigation History ....................................................................................................7 2.3.1 November 2013 Limited Phase II Environmental Investigation Report and December 2013 Supplemental Phase II Site Assessment .......................................................................................................... 7 2.3.2 September 2014 – 401 Buffalo Avenue Supplemental Investigation .................................................. 8 2.3.3 BCP Remedial Investigation (RI) ...................................................................................................... 8 Transformer Room - PCB Investigation Results ................................................................ 8 Site-Wide Gamma Walkover ........................................................................................... 9 Soil/Fill Investigation Results .......................................................................................... 9 Groundwater Investigation Results .................................................................................... 9 2.4 Remedial History .......................................................................................................10 2.4.1 401 Buffalo Avenue – Interim Remedial Measures ......................................................................... 10 Chemical Waste ............................................................................................................. 10 Radiologic Material Activities ......................................................................................... 10 Petroleum- Impacted Soil/Fill Activities ......................................................................... 11 Metals Impacted Soil/Fill Activities .............................................................................. 11 Transformer Room – PCB Activities ............................................................................. 12 2.4.2 402 and 430 Buffalo Avenue Interim Remedial Measures .............................................................. 13 430 Buffalo Avenue IRM – TP-3 Excavation Area .................................................... 13 402 Buffalo Avenue IRM - Radiologic Material Activities. ........................................... 13 2.5 Remedial Action Objectives ......................................................................................14 2.5.1 Soil: ................................................................................................................................................ 14 2.5.2 Groundwater: .................................................................................................................................. 14 2.6 Remaining Contamination .........................................................................................14 2.6.1 Remaining On-Site Soil/Fill .......................................................................................................... 15 2.6.2 Remaining On-Site Groundwater .................................................................................................... 15 3.0 INSTITUTIONAL & ENGINEERING CONTROL PLAN ............................................ 16 3.1 General .......................................................................................................................16 3.2 Institutional Controls .................................................................................................16 i 0294-013-001 B T K SITE MANAGEMENT PLAN 402 and 430 BUFFALO AVENUE SITE Table of Contents 3.3 Engineering Controls .................................................................................................17 3.3.1 Cover System ................................................................................................................................... 17 3.3.2 Criteria for Completion of Remediation/Termination of Remedial Systems ...................................... 18 Cover System .................................................................................................................. 18 4.0 MONITORING PLAN .............................................................................................. 19 4.1 General .......................................................................................................................19 4.2 Cover System Inspection ...........................................................................................19 5.0 OPERATION & MAINTENANCE PLAN .................................................................. 21 5.1 General .......................................................................................................................21 6.0 PERIODIC ASSESSMENTS/EVALUATIONS ............................................................. 22 6.1 Climate Change Vulnerability Assessment ...............................................................22 6.2 Green Remediation Evaluation ..................................................................................22 6.3 Remedial System Optimization .................................................................................23 7.0 REPORTING REQUIREMENTS ............................................................................... 24 7.1 Site Management Reports ..........................................................................................24 7.2 Periodic Review Report .............................................................................................26 7.2.1 Certification of Institutional and Engineering Controls .................................................................... 27 7.3 Corrective Measures Work Plan ................................................................................28 8.0 REFERENCES ........................................................................................................ 29 ii 0294-013-001 B T K SITE MANAGEMENT PLAN 402 and 430 BUFFALO AVENUE SITE LIST OF TABLES Table 1 Notifications (In Text) Table 2 Summary of RI PCB Wipe Sample Results Table 3 Summary of RI Surface Soil Analytical Results Table 4 Summary of RI Subsurface Soil Analytical Results Table 5 Summary of RI Groundwater Analytical Results Table 6 Petroleum Area IRM Post Excavation Analytical Results Table 7 401 Buffalo Avenue IRMs Post Excavation Soil Analytical Results Table 8 Transformer Room – Post Excavation Soil Analytical Results Table 9 Transformer Room – Post-Remedial Wipe Sampling Results Table 10 430 Buffalo Avenue TP-3 IRM Post Excavation Soil Analytical Results Table 11 Remaining on-Site Soil Above Unrestricted Use SCOs Table 12 Reporting Summary/Schedule (In Text) LIST OF FIGURES Figure 1 Site Location Map Figure 2 Site Plan (Aerial) Figure 3 Groundwater Isopotential Map Figure 4 RI Sample Locations Figure 5A 401 Buffalo Avenue IRM Activities Figure 5B Transformer Room

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    202 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us