HALF YEARLY COMPLIANCE REPORT OF RESIDENTIAL PLOTTED COLONY “BESTECH CITY” AT SECTOR-7, DHARUHERA, REWARI, HARYANA BY M/s BESTECH INDIA PVT. LTD. ADDRESS: BESTECH HOUSE, PLOT – 124, SECTOR – 44, GURGAON DECEMBER 2015 BOARD OF RESOLUTION CONSULTANT PROFILE & QCI NABET CERTIFICATE COMPLIANCE REPORT Modification & Expansion of Existing Residential Plotted Colony “Bestech City” Village – Malpura, Sector – 7, Dharuhera, Rewari Compliance Report COMPLIANCE REPORT S. No. Conditions Proposal PART A - SPECIFIC CONDITIONS: A. Construction phase 1. “Consent to Establishment” shall be “Consent for Establish” has been obtained obtained from Haryana State Pollution from Haryana State Pollution Control Board Control Board under Air & Water Act & a & the copy of the same is attached as copy shall be submitted to the SEIAA Annexure - I. Haryana before the start of any construction work at site. 2. A first aid room as proposed in the project Adequate first Aid facilities have been report will be provided both during ensured for construction labours. construction and operational phase of the project. 3. Adequate drinking water and sanitary Fresh water will be supplied through private facilities should be provided for water tankers for drinking purpose. construction workers at the site. Provision should be made for mobile toilets. Open Temporary toilets have been provided for the defecation by the laborers is strictly labors. prohibited. The safe disposal of waste water and solid waste generated during the Solid waste generated from the site will be construction phase should be ensured. managed as per the Solid Waste Management (Handling) Rules 2000. 4. All the topsoil excavated during All the topsoil excavated during construction construction activities should be stored for activities is being stored for use in use in horticulture/ landscape development horticulture/ landscape development within within the project site. the project site. 5. The project proponent shall ensure that the We will ensure that the building material building material required during required during construction phase is properly construction phase is properly stored within stored within the project area and disposal of the project area and disposal of construction construction waste will not create any adverse waste should not create any adverse effect effect on the neighboring communities and on the neighboring communities and should will be disposed of after taking necessary be disposed of after taking necessary precautions for general safety and health precautions for general safety and health aspects of people, only in approved sites with aspects of people, only in approved sites the approval of competent authority. with the approval of competent authority. 6. Construction spoils, including bituminous Construction spoils, including bituminous material and other hazardous materials, material and other hazardous materials, is not must not be allowed to contaminate being allowed to contaminate watercourses watercourses and the dump sites for such and the dump sites for such material will material must be secured so that they should secured so that they will not leach into the not leach into the ground water and any ground water and any hazardous waste hazardous waste generated during generated during construction phase, will be Bestech India Pvt. Ltd. 1 Modification & Expansion of Existing Residential Plotted Colony “Bestech City” Village – Malpura, Sector – 7, Dharuhera, Rewari Compliance Report construction phase, should be disposed off disposed off as per applicable rules and norms as per applicable rules and norms with with necessary approval of the Haryana State necessary approval of the Haryana State Pollution Control Board. Pollution Control Board. 7. The diesel generator sets to be used during Low sulfur diesel will be used for the DG construction phase should be of ultra-low sets. The purchase bills of low sulfur diesel is sulphur diesel type and should conform to attached as Annexure - II Environment (Protection) Rules prescribed for air and noise emission standards. DG sets monitoring report is attached as Annexure - III. 8. The diesel required for operating DG sets The diesel required for operating DG sets is shall be stored in underground tanks and if being stored in underground tanks. Clearance required, clearance from Chief Controller of from Chief Controller of Explosives is Explosives shall be taken. attached as Annexure - IV. 9. Ambient noise levels should conform to the During construction period incremental residential standards both during day and pollution loads on the ambient air and noise night. Incremental pollution loads on the quality will be closely monitored as per the ambient air and noise quality should be prescribed standards. Air and Noise closely monitored during construction monitoring report is enclosed as in Annexure phase. Adequate measures should be taken - V. to reduce ambient air and noise level during construction phase, so as to conform to the stipulated residential standards of CPCB/MoEF. 10. Fly ash should be used as building material Fly ash will be used as building material. in the construction as per the provisions of Fly Ash Notification of September 1999 and as amended on 27th August 2003. 11. Storm water control and its re-use as per Storm water control and its re-use as per CGWB and BIS standards for various CGWB and BIS standards for various applications should be ensured. applications will be ensured. 12. Water demand during construction should Ready mix concrete will be used during be reduced by use of pre-mixed concrete, construction. curing agents and other best practices. 13. Roof must meet prescriptive requirement as As per Energy Conservation Building Code per Energy Conservation Building Code by we are using appropriate thermal insulation using appropriate thermal insulation material for roof to fulfill requirement. material to fulfill requirement. 14. Opaque wall must meet prescriptive Opaque wall will meet prescriptive requirement as per Energy Conservation requirement as per Energy Conservation Building Code which is proposed to be Building Code which is proposed to be mandatory for all air conditioned spaces mandatory for all air conditioned spaces while while it is desirable for non-air-conditioned it is desirable for non-air-conditioned spaces spaces by use of appropriate thermal by use of appropriate thermal insulation insulation material to fulfill requirement. material to fulfill requirement. Bestech India Pvt. Ltd. 2 Modification & Expansion of Existing Residential Plotted Colony “Bestech City” Village – Malpura, Sector – 7, Dharuhera, Rewari Compliance Report 15. The approval of the competent authority All requisite approvals from the competent shall be obtained for structural safety of the authority have been obtained. building on account of earthquake, adequacy of fire-fighting equipment, etc. as The copy of certificate of Structural safety is per National Building Code including attached as Annexure - VI. protection measures from lightening etc. If any forest land is involved in the proposed site, clearance under Forest Conservation Act shall be obtained from the competent Authority. 16. The Project proponent as stated in proposal 71 nos. of RWH pits will be constructed in the will construct 71 numbers rain water project for recharging the ground water. harvesting pits for recharging the ground water within the project premises. Rain water harvesting pits shall be designed to make provisions for silting chamber and removal of floating matter before entering harvesting pit. Maintenance budget and persons responsible for maintenance must be provided. Care shall also be taken that contaminated water do not enter any RWH pit. 17. The Project proponent shall provide for Adequate fire safety measures and equipment adequate fire safety measures and is being provided as required by Haryana Fire equipment as required by Haryana Fire Services Act, 2009 and instructions issued by Services Act, 2009 and instructions issued the local Authority/ Directorate of fire from by the local Authority/Directorate of fire time to time. Further the project proponent from time to time. Further the project shall take necessary permission regarding the proponent shall take necessary permission fire safety scheme/ NOC from competent regarding the fire safety scheme/NOC from Authority as required. competent Authority as required. 18. The Project proponent shall obtain Power Assurance from the DHBVN for assurance from the DHBVN for supply of supply of 8,320 KW of power supply has been 8320 KW of power supply before the start obtained & already submitted to your of construction. In no case project will be esteemed office. operational solely on generators without any power supply from external power utility. 19. Detail calculation of power load and Detail calculation of power load and ultimate ultimate power load of the project shall be power load of the project shall be submitted to submitted to DHBVN under intimation to DHBVN under intimation to SEIAA Haryana SEIAA Haryana before the start of before the start of construction. Provisions construction. Provisions shall be made for shall be made for electrical infrastructure in electrical infrastructure in the project area. the project area. 20. The Project Proponent shall not raise any We will not raise any construction in the construction in the natural land depression / natural land depression / Nallah/water course Nallah/water course and shall ensure that and ensured
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages96 Page
-
File Size-