Proposed County Road 595 Alternatives Analysis and Project Assessment

Proposed County Road 595 Alternatives Analysis and Project Assessment

Proposed County Road 595 Alternatives Analysis and Project Assessment Marquette County Road Commission DRAFT FOR PUBLIC REVIEW - IMPORTANT: FINAL ENGINEERING HAS NOT BEEN COMPLETED ON THE PLANS FOR THE PROPOSED COUNTY ROAD 595. REVISIONS MAY BE MADE TO THIS DOCUMENT, INCLUDING CHANGES IN WETLAND IMPACTS, PRIOR TO THE SUBMITTAL OF AN APPLICATION FOR PERMIT. August 15 October 6, 2011 EXECUTIVE SUMMARY An application for permit was filed with the Michigan Department of Environmental Quality (MDEQ) by Woodland Road LLC in August 2009 for the proposed Woodland Road in Marquette County. In May 2010 Woodland Road LLC withdrew the application for permit due to the inability to resolve pending issues with the project as raised by the MDEQ and U.S. Environmental Protection Agency (EPA). After withdrawal of the application, one of the members of the Woodland Road LLC, Kennecott Eagle Minerals Company (KEMC) made a decision to proceed with County Road 550 as the primary transportation route for the Eagle Development Project. The decision to utilize the CR 550 route, a portion of which travels through the cities of Marquette, Negaunee, and Ishpeming, caused substantial concern among local governmental units and the general public. As a result of the actions explained above, on September 7October 4, 2010 the Marquette County Board of Commissioners formally requested that the Marquette County Board of Road Commissioners (MCRC) develop a new all-season primary county road from US-41 to the Triple A Road within a four-mile wide corridor beginning at County Road FY. In response to this directive and after a public hearing, MCRC adopted a resolution on October 18, 2010, that concluded, in part, “that it is in the public’s interest to create a new all-season primary county road to run north-south beginning at the intersection of US-41/CR FY northerly to CR IAA (aka Triple A Road) and the name of the route shall be known as CR 595.” As the governing body granted authority by law to provide for and maintain public road infrastructure in Marquette County, the MCRC is therefore applying for a permit from the MDEQ to construct CR 595. The purpose of the proposed CR 595 project is to construct a primary county north- south road that (1) connects and improves emergency, commercial and recreational access to a somewhat isolated but key industrial, commercial and recreational area in northwest Marquette County to US-41, and (2) reduces truck travel from this area through the County’s population centers. Project Need The economic, safety, and recreational needs justifyingMCRC has determined the new proposed CR 595 are compelling as explained in this assessment. The CR 595 project is necessary forto serve the mining, timber, aggregate, and recreation industries as well as emergency services in Marquette County. A primary economic benefit of CR 595 would be the overall reduction of travel distance required to access these industries and activities in northwest Marquette County by replacing the existing seasonal and circuitous current routes. Improving trucking efficiency is important to the mining, timber, and aggregate industries and will benefit their long-term success. Not only would these industries benefit directly from CR 595, but the many businesses that serve these industries would benefit as well. The construction of CR 595 would directly create an estimated 200 jobs and the related benefits to the area businesses would be significant. More importantly, however, the CR 595 project will address public needs going far beyond the economic interests of these regionally key industries. There is a demonstrable need for improved access to northwest Marquette County for emergency fire control, emergency medical services, search and rescue, and for recreational access. Location of the project west of the Dead River dam system optimally addresses this need as a safeguard against access impediments created if thethat dam system fails again (as in 2003). There is a significant timber resource in northwest Marquette County, and fire suppression provided by the Michigan Department of Natural Resources (MDNR) is critical to protecting this resource. In addition, providing better firefighter emergency access to the many private recreational “camps” in the area is a crucialan important additional benefit. CR 595 would vastly improve emergency response during winter months due to the shorter distance that snowmobile units with rescue sleds would have to travel from accident sites to reach an ambulance waiting on CR 595. Logging accidents are common in this area of Marquette County, and requests for assistance from recreationists are also common. CR 595 would significantly enhance response time for EMS in this area. Specifically, as explained by Marquette County Sheriff Mike Lovelace and his staff: "Enhancement number one would be the effective and efficient response to any and all incidents, accidents, forest fires, floods, other emergencies and natural disasters in the remote northwestern portions of Marquette County that we did not previously possess. Currently we have to respond via two- track roads with front wheel drive patrol cars, four-wheel drive patrol trucks, ATVs, dirt bike, or on foot with Deputies and/or Search and Rescue volunteers. During the winter we would probably have to respond with snowmobiles on the State-maintained snowmobile trails in order to get anywhere as the seasonal roads are not plowed during the winter. Less time in a rescue sled being towed by a ATV on a rough two track road or trail, or by a snowmobile in the winter with more time spent in an ambulance on paved roads greatly enhances the chances for a victim's survival." In addition, MDNR Forest Management Division has stated that CR 595 would reduce fire fighter response time to the Yellow Dog Plains from the MDNR Ishpeming office to about 45 minutes, about half of the existing response time. The proposed road would also facilitate access for fire fighters to other areas of Marquette County to the north, such as Northwestern Road, and would provide quicker access to some of the lands south of the Huron Mountains. Forest fire response time can be critical to the success of containing a forest fire, especially in the jack pine plantations common in the Yellow Dog Plains. Finally, The proposed CR 595 would divert substantial truck and other vehicle traffic away from urban areas of Marquette County, east of the project area, thereby reducing traffic congestion and improving public safety. CR 595 would mitigate the potential impact of increased traffic volume associated with mining and timber operations onin the more densely ____________________________________________________________________________ Alternatives Analysis & Project Assessment October 6, 2011 Proposed County Road 595 Page 2 populated areas of Negaunee, Ishpeming, and the City of Marquette. As it relates to the increased traffic volume, area timber companies have estimated that their workers accessing theirthe work sites in this area (not including the hauling of harvested timber) would amount to welltravel over 2,000 round trips per year,. Most of which must presently travel those workers’ trips are currently on CR 510 or CR 550 and through Marquette. Add to that the In addition, nearly 2,000 loads of timber are hauled out of the woods from the northwest part of the county on an average annual basis and the reduction of over 1, meaning that there are 4,000 round trips of logging trucks. Currently half of those loads that now travel on CR 550 and through the City of Marquette and the significance of CR 595 becomes evident.. Wetland Impacts and Mitigation The proposed CR 595 impacts approximately 23.25.6 acres of wetland over a distance of 22.521.4 miles, including the impacts associated with the Trail 5 snowmobile trail relocation project. and Triple A stream restoration. Impacts to wetlands are unavoidable with the proposed CR 595 project, but extensive planning and engineering design for the road has resulted in avoiding wetlands to the extent practicable and minimizing impacts as much as possible. A wetland mitigation plan has been prepared based upon extensive field study of potential sites. The unavoidable impacts to wetlands would be replaced at a minimum ratio of 1.5: to 1 in order to provide for no net loss of wetland area. Wetland functions would be replaced by creation of 43.949.4 acres of new wetlands. Five wetland mitigation sites are located in three of the four watersheds involved in the proposed CR 595 project. Due to the very small amount of wetland impact in the Michigamme River watershed (0.7 acre), the wetland mitigation for those impacts is proposed in the Escanaba River watershed, relatively close to the wetland impact. It is anticipated that these wetland mitigation sites will replace the functions lost with the impacts to existing wetlands by providing similar ecosystem types in similar positions in the regional landscape. There are a total of 2322 river and stream crossings of the proposed CR 595 road corridor (not including the East Branch of the Salmon Trout mitigation project) resulting in new, expanded and improved road crossings via the installation of new bridges andor concrete box culverts at most of those locations. These crossings can have both a negative and positive impact on surface water resources. Of the 2322 regulated stream crossings in the CR 595 project, 1715 are existing stream crossings and sixseven will be new crossing locations. Of those 1715 existing crossings, all of the structures are considered to be inadequately sized or are having degrading effects on the stream habitat. The implementation of aspects of Stream Simulation Methodology adopted by the MDNR and MDEQ for this project will ensure that each of the 23 stream crossings proposed on CR 595 has minimal negative long-term impact on the stream and near-stream habitat.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    288 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us