KCC Highways Works Programme 2016/17 PDF 137 KB

KCC Highways Works Programme 2016/17 PDF 137 KB

To: Tonbridge and Malling Joint Transportation Board By: KCC Highways and Transportation Date: 7th June 2016 Subject: Highway Works Programme 2016/17 Classification: Information Only Summary: This report updates Members on the identified schemes approved for construction in 2016/17 1. Introduction This report provides an update and summarises schemes that have been programmed for delivery in 2016/17 Footway and Carriageway Improvement Schemes – see Appendix A Drainage Repairs & Improvements – see Appendix B Street Lighting – see Appendix C Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures – see Appendix D1 Integrated Transport Schemes – see Appendix D2 Local Growth Fund – see Appendix D3 Developer Funded Work – see Appendix E Section 278 Works – see Appendix E1 Section 106 Works – see Appendix E2 Bridge Works – see Appendix F Traffic Systems – see Appendix G Combined Member Fund – see Appendix H Conclusion 1. This report is for Members information. Contact Officers: The following contact officers can be contacted on 03000 418181 Alan Casson Resurfacing Manager Katie Moreton Drainage Manager Sue Kinsella Street Lighting Manager Toby Butler Intelligent Transport Systems Manager Katie Moreton (Interim) Structures Manager Jamie Hare Development Agreement Manager Louise Rowlands Development Planner Jamie Watson Transportation and Safety Schemes Manager Jamie Watson Combined Member Fund Manager Appendix A – Footway and Carriageway Improvement Schemes The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes. Surface Treatment Schemes – Contact Officer Mr Clive Lambourne Road Name Parish Extent of Works Current Status Ightham Bypass to Borough Green Road Ightham Western Road Programmed May 2016 Surface Dressing From Tonbridge Road to To Be Programmed High Cross Road Ightham Mote Road Summer 2016 Micro Surfacing Coach Road to Stone To Be Programmed Pine Tree Lane Ightham Street Road Summer 2016 Micro Surfacing Strawberry Vale to To Be Programmed Priory Road Tonbridge Railway Approach Summer 2016 Micro Surfacing Whole length To Be Programmed Garden Road Tonbridge Micro Surfacing Summer 2016 Whole length To Be Programmed Basted Mill Platt Micro Surfacing Summer 2016 Various sections along To Be Programmed Riding Lane Hildenborough the lane Summer 2016 Micro Surfacing Pembroke Road to To Be Programmed Audley Avenue Tonbridge Audley Rise Summer 2016 Micro Surfacing Mill Street to The Rocks To Be Programmed High Street East Malling Road Summer 2016 Micro Surfacing The Rocks Road to To Be Programmed Chapel Street East Malling Manningham House Summer 2016 Pilgrims Way to Unwin Rochester Road Aylesford Close Programmed May 2016 Surface Dressing Seven Mile Lane to Comp Lane Platt Comp Lodge Programmed May 2016 Surface Dressing Machine Resurfacing – Contact Officer Mr Byron Lovell Road Name Parish Extent of Works Current Status B245 Tonbridge Road Hildenborough Resurfacing the junction Postponed until Planned with Riding Lane Utility works are completed. Various sections along Hall Hall Road Aylesford Programmed for 26th June Road From junction of London Road to junction of Programmed for July/August Dry Hill Park Road Tonbridge Shipbourne Road 2016 (including roundabout) Footway Improvement - Contact Officer Mr Neil Tree Road Name Parish Extent and Current Status Description of Works From its junction with Works are included within Bordyke to outside the Tonbridge High Street High Street Tonbridge number 135. This Regeneration Scheme scheme is currently in the design stages Entire Length East Malling and Keats Road (Footway Completed. Larkfield Reconstruction) From its junction with Welland Road to the YMCA at No. 164 To be designed and Shipbourne Road Tonbridge Shipbourne Road. programmed (Footway Reconstruction). From its junction with Castle Way to its To be programmed (Works junction with Oxley Lillieburn Leybourne subject to specialist Shaw Lane. contractor assessment) (Footway Protection Treatment). Appendix B – Drainage Drainage Works – Contact Officer Kathryn Moreton Road Name Parish Description of Works Current Status No Drainage works planned over £5000 Appendix C – Street Lighting Structural testing of KCC owned street lights has identified the following as requiring replacement this financial year. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement. Street Lighting Column Replacement – Contact Officer Sue Kinsella Road Name Parish Description of Works Status Replacement of 1no streetlight Haleys Place Burham Completed complete with LED lantern Replacement of 1no streetlight Uridge Road Tonbridge Completed complete with LED lantern Framley Replacement of 9no streetlights Higham Completed Road complete with LED lantern Replacement of 1no streetlight Guestwick Higham Completed complete with LED lantern Allington Replacement of 6no streetlights Higham Completed Drive complete with LED lantern 2 no Completed Letters have been sent to local residents requesting permission to access land and UKPN cable which is in Three Elm Replacement of 3no streetlights their grounds. Hadlow Lane complete with LED lantern Currently awaiting response, as soon as we receive this then the works will be programmed. Expected completion by July 2016 1 no streetlight still awaiting replacement, Rochester Replacement of 10no streetlight this is being Burham Road complete with LED lantern programmed and due for completion by July 2016 Works currently being Cedar Replacement of 1no streetlight programmed and Tonbridge Crescent complete with LED lantern expected for completion by September 2016 Works currently being Greenfrith Replacement of 1no streetlight programmed and Tonbridge Drive complete with LED lantern expected for completion by September 2016 Works currently being Borough Replacement of 1no streetlight programmed and Griggs Way Green complete with LED lantern expected for completion by September 2016 Works currently being Replacement of 2no streetlights programmed and Higham Lane Tonbridge complete with LED lantern expected for completion by September 2016 Works currently being Replacement of 1no streetlight programmed and Laker Road Rochester complete with LED lantern expected for completion by September 2016 Works currently being Maltings Replacement of 1no streetlight programmed and Hadlow Close complete with LED lantern expected for completion by September 2016 Works currently being Old Replacement of 1no streetlight programmed and Parsonage West Malling complete with LED lantern expected for completion Court by September 2016 Works currently being Replacement of 1no streetlight programmed and Park Way Tonbridge complete with LED lantern expected for completion by September 2016 Works currently being Quincewood Replacement of 1no streetlight programmed and Tonbridge Gardens complete with LED lantern expected for completion by September 2016 Works currently being Rembrandt Replacement of 1no streetlight programmed and Tonbridge Close complete with LED lantern expected for completion by September 2016 Works currently being Replacement of 1no streetlight programmed and Stacey Road Tonbridge complete with LED lantern expected for completion by September 2016 Works currently being Waveney Replacement of 1no streetlight programmed and Tonbridge Road complete with LED lantern expected for completion by September 2016 Works currently being St Peters Replacement of 1no streetlight programmed and Ditton Road complete with LED lantern expected for completion by September 2016 Works currently being Replacement of 1no streetlight Keyes programmed and Tonbridge complete with LED lantern following Garden expected for completion RTC by September 2016 Works currently being Dry Hill Park Removal and disconnection of 1no programmed and Tonbridge Road redundant sign post expected for completion by September 2016 Works currently being Replacement of 1no streetlight Coldharbour programmed and Aylesford complete with LED lantern following Roundabout expected for completion RTC by September 2016 Works currently being Replacement of 1no sign post Nepicar Nepicar / programmed and complete with LED Downflood Roundabout Wrotham expected for completion following RTC by September 2016 Works currently being Replacement of 1no streetlight Fellowes programmed and Hildenborough complete with LED lantern following Way expected for completion RTC by September 2016 Appendix D – Transportation and Safety Schemes Appendix D1 – Casualty Reduction Measures Identified to address a known history of personal injury crashes: Location Parish Description of Works Lead officer Current Status Design work CRM Safety improvement complete. Tree now pollarded, scheme A26 Hadlow Construction Hadlow under development. Change Steven Noad High Street works to be of junction from GIVE WAY programmed to STOP during 2016/17. Appendix D2 – Integrated Transport Schemes All other LTP funded non-casualty reduction schemes: Lead Location Parish Description of Works Current Status officer Work waiting to be Borough Traffic Management Michael programmed with A25 Maidstone Road Green Options Report Hardy Streetworks due to other work in the area. Appendix D3 – Local Growth Fund Local Growth Fund programme update for the Tonbridge and Malling Borough. The Department for Transport (DfT) added £100m to the Local Growth

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us