Traffic Announcement Traffic Updates on Mrt Construction Along Persiaran Surian 11 December 2014

Traffic Announcement Traffic Updates on Mrt Construction Along Persiaran Surian 11 December 2014

TRAFFIC ANNOUNCEMENT TRAFFIC UPDATES ON MRT CONSTRUCTION ALONG PERSIARAN SURIAN 11 DECEMBER 2014 Date 13 Dec 2014 - 31 Dec 2014 Time 12 midnight to 6:00am Duration 21 days Reason To facilitate segmental launching, concreting and dismantling of portal truss Lane closure for a stretch of 450m from IPC Shopping Centre to the intersection of PJU 7/1 next to the Surian Underpass (Kota Damansara-bound) and closure of Jalan PJU 7/8 intersection with Persiaran Surian will be implemented from 13 December 2014 – 31 December 2014 from 12 midnight to 6:00am. The following diversions will take place: Motorists from LDP Highway wanting to turn right into Jalan PJU 7/8 and motorists from Kota Damansara wanting to turn left into Jalan PJU 7/8 Motorists will be diverted to turn into Jalan PJU 7/1 and make a right turn at the traffic light next to Tesco into Jalan PJU 7/4, then right into Jalan PJU 7/2. (see red arrow) Motorists from Jalan PJU 7/1 wanting to go to LDP-Highway Motorists will exit Jalan PJU 7/1 on to Persiaran Surian, turn right and drive ahead to make a U-turn at Palm Spring Condo to access the Underpass to exit to LDP Highway. (see green arrow) Motorists from Jalan PJU 7/8 wanting to exit to Persiaran Surian Motorists will be diverted to make a U-turn at the roundabut behind Surian Tower and turn left into PJU 7/1 and exit to Persiaran Surian where they can make a U-turn at Palm Spring Condo to access the Underpass to exit to LDP Highway. (see blue arrow) Motorists on PJU 7/1 exiting into Persiaran Surian (Kota Damansara-bound) will not be affected. *Currently, there are two closures being implemented in front of Pelangi Damansara to the traffic light junction at Jalan PJU 3/31 (12 Dec -18 Dec 2014) and full road closure for a stretch of 360m from Surian Condo until the junction of Jalan PJU 7/1 near Mutiara Damansara Residences (LDP Highway-bound) and closure of Surian Underpass (Sungai Buloh-bound) (12 Dec 2014 – 22 Dec 2014. Traffic announcement was issued on 10 December 2014. Page 1 of 2 For media enquiries, please contact: Adeline De Cruz Tel: +6012 217 2017 [email protected] Siti Fadzillah Ismail Tel: +603 7493 3965 [email protected] MMC GAMUDA KVMRT (PDP) SDN BHD (927050-H) Block A, Level 7, Menara Mustapha Kamal, PJ Trade Centre, No 8, Jalan PJU 8/8A, Bandar Damansara Perdana, 47820 Petaling Jaya, Selangor, Malaysia T: 603 7494 2200 F: 603 7722 2643 www.kvmrt.com.my Page 2 of 2 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us