FFFIS for Eurobalise

FFFIS for Eurobalise

ALSTOM * ANSALDO * BOMBARDIER * INVENSYS * SIEMENS * THALES ERTMS/ETCS – Class 1 FFFIS for Eurobalise REF : SUBSET-036 ISSUE : 2.4.1 DATE : September 27, 2007 Company Technical Approval Management approval ALCATEL ALSTOM ANSALDO SIGNAL BOMBARDIER INVENSYS RAIL SIEMENS © This document is the property of ALSTOM * ANSALDO * BOMBARDIER * INVENSYS * SIEMENS * THALES SUBSET-036 FFFIS for Eurobalise Page 1/170 Issue 2.4.1 Page 2 of 170 SUBSET-036, Issue 2.4.1 September 27, 2007 Foreword This Norm incorporates results from the original work (“Eurobalise FFFS”) carried out by the EUROSIG Con- sortium 1 under the financial support of the European Commission (Eurobalise/Euroloop Project -’92/94’, ERTMS/EUROSIG Project -‘95/98’, and EMSET Project -‘96/00’), and in close co-operation with technical bodies of the UIC 2 and of the EEIG ERTMS User Group 3. The EUROSIG specifications were subsequently updated by the UNISIG Consortium 4 in consideration of further technical work in development and test areas. The UNISIG technical documents were finally submitted to the CENELEC WGA9B group for review, integra- tion, and consolidation. The main body of Part 1 of this Norm, and the relevant Annexes designated as “normative”, constitute the man- datory requirements for achieving air-gap interoperability between any possible combination of wayside and train-borne equipment. Annexes designated as “informative”, either provide background information for the mandatory requirements, or outline non-mandatory requirements and optional functionality. Part 2 of this Norm (UNISIG SUBSET-085) specifies test methods and tools for verification of compliance with the mandatory requirements of Part 1 (this document). 1 The EUROSIG Consortium was composed of the following European Companies working in the Railway Signalling area: ACEC Transport, Adtranz Signal, Alcatel SEL, GEC Alsthom Transport, Ansaldo Trasporti, CSEE Transport, SASIB Railway, Siemens, and Westinghouse Signal. 2 UIC: Union Internationale de Chemins de Fer. 3 EEIG ERTMS User Group: European Economic Interest Group was composed of some European Railways managing the implementation of ERTMS/ETCS trial sites aimed at full functional verifications. 4 The UNISIG Consortium was composed of the following European Companies working in the Railway Signalling area: Adtranz Signal, Alcatel, Alstom, Ansaldo Signal, Invesys Rail, and Siemens. Page 3 of 170 SUBSET-036, Issue 2.4.1 September 27, 2007 Contents 1 INTRODUCTION ________________________________________________________ 10 1.1 Application Range __________________________________________________________10 1.2 Scope_____________________________________________________________________10 2 NORMATIVE REFERENCES _______________________________________________ 12 3 TERMINOLOGY AND DEFINITIONS _________________________________________ 13 3.1 Acronyms and Abbreviations_________________________________________________13 3.2 Definitions ________________________________________________________________15 3.3 Influence of Tolerances ______________________________________________________19 4 SPOT TRANSMISSION SYSTEM_____________________________________________ 20 4.1 Architectural Layouts _______________________________________________________20 4.1.1 Introduction _____________________________________________________________________20 4.1.2 Units and Functions_______________________________________________________________21 4.1.3 Interfaces _______________________________________________________________________22 4.1.4 Basic Functions __________________________________________________________________25 4.1.5 Management of Faults and Failures___________________________________________________26 4.2 Functional Requirements ____________________________________________________27 4.2.1 Balise Tele-powering______________________________________________________________27 4.2.2 Up-link Data Transmission _________________________________________________________27 4.2.3 Down-link Data Transmission_______________________________________________________29 4.2.4 Train Location Reference __________________________________________________________30 4.2.5 Cross-talk Protection ______________________________________________________________31 4.2.6 Compatibility with existing systems __________________________________________________34 4.2.7 Interoperability with existing KER Systems ____________________________________________34 4.2.8 Quality of the Data Transmission Channel _____________________________________________35 4.2.9 Timing and Distance Requirements___________________________________________________36 4.2.10 Location Reference Accuracy_____________________________________________________38 4.3 Coding Requirements _______________________________________________________39 4.3.1 Introduction _____________________________________________________________________39 4.3.2 Encoding Requirements____________________________________________________________40 4.3.3 Telegram Switching_______________________________________________________________43 4.3.4 Decoding Requirements ___________________________________________________________44 4.4 RAMS Requirements _______________________________________________________45 4.4.1 General ________________________________________________________________________45 4.4.2 Top level functionality ____________________________________________________________45 Page 4 of 170 SUBSET-036, Issue 2.4.1 September 27, 2007 4.4.3 Reliability ______________________________________________________________________46 4.4.4 Availability _____________________________________________________________________46 4.4.5 Maintainability __________________________________________________________________47 4.4.6 Safety__________________________________________________________________________48 4.5 Mechanical Requirements ___________________________________________________54 4.5.1 Reference Axes and Origins of Co-ordinates ___________________________________________54 4.5.2 Materials _______________________________________________________________________55 4.5.3 Parts___________________________________________________________________________55 4.5.4 Name Plates and Product Marking ___________________________________________________55 4.5.5 Design _________________________________________________________________________55 4.6 Electrical Requirements _____________________________________________________56 4.6.1 On-board Equipment ______________________________________________________________56 4.6.2 Wayside Equipment_______________________________________________________________56 4.7 Test Requirements__________________________________________________________57 4.7.1 Testability ______________________________________________________________________57 4.7.2 Verification and Test Documentation _________________________________________________57 4.7.3 Product Life-cycle Phases __________________________________________________________59 4.7.4 Requirements for Test Tools and Procedures ___________________________________________59 4.8 Quality and Safety Assurance ________________________________________________60 4.8.1 Logistics _______________________________________________________________________60 4.8.2 Handling _______________________________________________________________________60 4.8.3 Maintainability Engineering ________________________________________________________60 4.8.4 Human Performance and Engineering_________________________________________________60 5 UP-LINK BALISE _______________________________________________________ 61 5.1 Architectural Layouts _______________________________________________________61 5.2 Balise air-gap Interface______________________________________________________61 5.2.1 Balise Tele-powering______________________________________________________________61 5.2.2 Up-link Data Transmission _________________________________________________________62 5.3 Balise Controlling Interfaces _________________________________________________77 5.3.1 Introduction _____________________________________________________________________77 5.3.2 Up-link Data Input (Interface ‘C1’) __________________________________________________78 5.3.3 Auxiliary Energy Input (Interface ‘C6’) _______________________________________________82 5.3.4 Common Mode Signal Levels _______________________________________________________83 5.4 Programming Principles_____________________________________________________83 5.5 RAMS Requirements _______________________________________________________84 5.5.1 Balise functionality _______________________________________________________________84 Page 5 of 170 SUBSET-036, Issue 2.4.1 September 27, 2007 5.5.2 Reliability ______________________________________________________________________86 5.5.3 Availability _____________________________________________________________________86 5.5.4 Maintainability __________________________________________________________________86 5.5.5 Safety__________________________________________________________________________87 5.6 Installation Requirements for Balises and Cables ________________________________92 5.6.1 Reference Axes __________________________________________________________________92 5.6.2 Installation Requirements for Balises _________________________________________________92 5.6.3 Distance between Balises __________________________________________________________95 5.6.4 Number of Balises in a Balise Group _________________________________________________96 5.7 Specific Environmental

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    170 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us