Bihar Eng 01 to 10 Set

Bihar Eng 01 to 10 Set

Achievements of Railways LoPN Hkkjr in ,d dne LoPNrk dh vksj Araria Lok Sabha Constituency ge lc dk gks ,d gh ukjkA lkiQ lqFkjk gks jsy gekjkAA of Bihar East Central Railway, Hajipur Works / Projects Completed : l Subbay in place of 6 level crossing. l New toilet for passengers at Jogbani l Manning of 11 unmanned level Station. crossings. l New toilet for passengers at l New foot over bridge at Araria Station Forbesganj Station. road under bridge in place of 6 level Ongoing Works / Projects : crossings. l Gauge conversion of Sakari- Works / Projects Planned in Future : Laukaha Bazaar-Nirmali-Saharsa- l Araria-Supaul new rail line. Forbesganj rail section. l Electrification of Araria-Jogbani rail l Araria-Galgalia new rail line. section. l Jogbani(India)-Biratnagar(Nepal) new rail line. l Jalalgarh-Kishanganj new rail line. Indian Railways ;k=kh lsok ,oa fodkl ds fy, lnk rRij Achievements of Railways LoPN Hkkjr in ,d dne LoPNrk dh vksj Ara Lok Sabha Constituency ge lc dk gks ,d gh ukjkA lkiQ lqFkjk gks jsy gekjkAA of Bihar East Central Railway, Hajipur Works/Projects Completed : l Extension of Existing FOB at l 63213/63214 Patna-Ara-Patna MEMU new Raghunathpur Station. passenger train. l Replacement of PSC mast with Steel l Stoppage of 53211/12 Patna-Sasaram mast in Ara-Dildarnagar rail section. Passenger at Koelwar l Replacement of 50 manual operated l 18639/40 Ara-Ranchi New Train . single pole isolator l 20 feet wide FOB at Ara with single pole l 2nd Escalator at Ara. m o t o r i z e d l Improved lighting at Ara isolators. & Bihta. l Replacement of l Electrification of Ara- aluminium feeder Sasaram rail section. and cross feeder l 7 5 2 7 1 / 7 5 2 7 3 A r a - with copper feeder. Sasaram-Ara DEMU l Provision of double pole isolator in all new passenger train. switching posts in Danapur division. l 13429/13430 Malda Town-Anand Vihar l Weekly train given stoppage at Ara Station. PET survey for 335 km Mughalsarai to l Stoppage of 15623/ 15624 Kamakhya- Kiul third rail line. Bhagat Ki Kothi, 15125/ 15126 Patna- l 75 automatic fire detection and Manduadih Jansatabdi and 19669/19670 suppression system. Patliputra-Udaypur Humsafar Express at l Upgradation of STM Level 1 to level 4. Ara Station. l Rehabilitation of bridge number 208. l Replacement of pipeline at Ara Station. l Automatic chlorination plant for clean l Extension of platform at Bihiya Station. drinking water at Ara station. l Upgradation of present SCADA system into l Two lifts at Ara station. SPORT protocol software SCADA system. l Road over bridge at level crossing in Ongoing Works/Projects : Kulharia, Ara and Bihiya. l RPF Barrack and office at Ara Station. l FOB at Kulharia, Koelwar, Karisath & l Stock room and staff toilet in booking office Ara Stations at Bihiya Station. Works/Projects Planned in Future : l Development of Ara Station as Adarsh station. l l Development of Circulating Area of Ara & Ara-Bhabhua Road new rail line (22 km Bihiya with PP Shelter, improvement of PF in Ara Lok Sabha constituency) Surface & Construction of 1 new platform at l Boundary wall along tracks in Bihiya, Ara with provision of PIT line & other Banahi, Raghunathpur and Chausa passenger amenities at Ara Station. to stop encroachment. Indian Railways ;k=kh lsok ,oa fodkl ds fy, lnk rRij Achievements of Railways LoPN Hkkjr in ,d dne LoPNrk dh vksj Aurangabad Lok Sabha Constituency ge lc dk gks ,d gh ukjkA lkiQ lqFkjk gks jsy gekjkAA of Bihar East Central Railway, Hajipur Works/Projects Completed : Works/Projects Planned in Future : l Extension and height raising of platforms in l Gaya-Daltonganj via Rafiganj new rail line. up and down direction at Rafiganj, l Bihta-Aurangabad via Anugrah Narayan Sonnagar and Phesar stations. Road new rail line. l Goods office at Aurangabad Station. l Subway in place of level crossings 20CE l LCD Charting Display & UTS at Anugraha and 21CE between Rafiganj and Dev Road. Narayan Road Station. l Subway in place of level crossings 22CE l Live Train Display System at Anugraha between Dev Road and Jakhim. Narayan Road Station. l Subway in place of level crossing 23CT and l Stoppage of Train n. 12371/72, 22911/ 24CE between Baghoikusa and Jakhim. 12,11045/46 at Anugraha Narayan Road l Subway in place of level crossing 27ACE Station & 13243/44 at Baghoikusa station between Baghoikusa and Phesar. Ongoing Works/Projects : l Subway in place of level crossing 27CT in l New UTS and PRS office at Anugraha Baghoikusa Yard. Narayan Road Station. l Subway in place of level crossing 28BT in l Development of parking and circulating Phersar Yard. area at Dehri on sone station. l Subway in place of level crossing 29CE l Extension of high level platform in up between Phesar and Anugrah Narayan direction at Jakhim Station. Road. l Provision of standard signals at Anugrah l Subway in place of level crossing 31CT Narayan Road Station. near Anugraha Narayan Road Yard. l Water cooler for passengers at Anugrah l Subway in place of level crossing 32CE Narayan Road Station. between Anugraha Narayan Road and l Developement of Half Rake siding into full Chiraila Pouthu. Rake at Anugrah Narayan Road Station. l Replacement of old FOB with new FOB with Divyang Accessibility. l Passenger information system & Electronic train indication board on all Platform at Anugrah Narayan Road Station. Indian Railways ;k=kh lsok ,oa fodkl ds fy, lnk rRij Achievements of Railways LoPN Hkkjr in ,d dne LoPNrk dh vksj Begusarai Lok Sabha Constituency ge lc dk gks ,d gh ukjkA lkiQ lqFkjk gks jsy gekjkAA of Bihar East Central Railway, Hajipur Works/Projects Completed : l Platform shelter at Lakhminia, Bachhwara, Lakho and Umeshnagar. l New Rail cum road bridge over river Ganga in Munger l (Rs. 2621 Cr.) Renovation of waiting room and booking counter at Sahebpur Kamal, Lakhminia and Lakho stations. l Electrification of 11 km rail line between l New freight terminal in Tilrath. Dalsinghsarai and Bachhwara. l l Road over bridge in place of level crossing between Barauni Electrification of 48 km rail line from Barauni to and Tilrath. Umeshnagar. l Road over bridge in place of level crossing between Barauni l Repairing of washable aprons of lines at Barauni and Teghara. Junction. l Provision of Two lifts, Upgradation of platform surface and l Upgradation of goods shed at Barauni Junction. toilets at Barauni station. l LED lights for Pit lighting and four booster pumps for Works/Projects Planned in Future : coach watering at Barauni Junction. Three water l supply pumps and 150 LED lights for street light. Electronic interlocking of marshalling cabin and shunting neck at Garhara halt. l Construction and renovation of toilet, platform, sitting l Upgradation of coaching depot, yard for train inspection in arrangement, urinal and waiting Hall at Salauna Barauni, pitline and sick line. Station in order to develop it as Adarsh station. l Air conditioning of running room in Barauni. l New PRS building in Begusarai and CCTV cameras l New running room at Barauni and upgradation of old crew for PRS and UTS counters. lobby and running room. l Development of circulating area in Bachhwara, l Second entry gate, new waiting room and platform shelter in Barauni, Tilrath and Begusarai. whole length along with 3.66 meter wide new foot over l Electronic train indication board at Begusarai station. bridge at Begusarai. l New foot over bridge at Lakhminia and Sahebpur l Yard remodeling for relaxation in 60 km per hour permanent Kamal stations. speed restriction in Teghara yard. l Additional toilet at Barauni, reconstruction of toilets at l 3 meter wide foot over bridge and height raising of platform Bachhwara and Teghra, new toilets at Lakhminia, number 1 and 2 at Salauna Station. Danauli, Phulwaria and Sahebpur Kamal stations. l Provision of Integrated Passenger information system at l Air conditioning in VIP Lounge at Barauni and Barauni station. Begusarai station and LED based station name l Provision of additional coach indication board and train board. indication board at Begusarai. l Renovation of waiting room at Teghara and l Yard Remodeling in Barauni. Begusarai stations and new waiting room at Barauni. l Construction of ROB at LC Gate no. 53A, 48B, 51A between l Water cooler at Begusarai station. Tilrath-Begusarai, LC no. 06 Spl. between Barauni-Dinkar Gram Simaria, LC no. 3T Spel. in Simaria yard, LC no. 08C l Provision of 100% LED Light at Teghra, Barauni, between Teghra-Barauni, LC no. 22B between Sathajagat- Begusarai & Lakhminia stations. Bachhwara, LC no. 25C between Umesh Nagar-Khagaria, l Commissioning of Computerized reservation 61 spl. between Barauni-Tilrath charting system at Barauni station. l Integtrated passenger information system at Barauni bypass l Commissioning of Train Indication Board and Coach Station. Indication Board at Begusarai station. l Additional FOB at Barauni & Begusarai l 1hp submersible pump at Sahebpur Kamal, l CCTV at Barauni. Lakhminia, Lakho and Bachhwara stations. l Wi-Fi at Dinkar Gram Simaria, Barauni bypass, Tilrath, l 2 Lifts at Barauni. Begusarai, Danauli Phulwaria, Lakhminia, Sahebpur Kamal, Ongoing Works/Projects : Barauni Flag, Teghra, Bachhwara & Sathajagat. l LHS at LC no. 23C, 25C between Bachhwara-Sathajagat, l Additional bridge and doubling at Rampur Dumra-Tal and 17B, 19B, 18C,20B between Teghra-Bachhwara, 41C Rajendra pul. between Danauli Phulwaria-Lakho & 16B at Teghra. l Two escalators and two lifts at Barauni Junction. l Residential quarters for RPSF personnel at Garharhar Indian Railways ;k=kh lsok ,oa fodkl ds fy, lnk rRij Achievements of Railways LoPN Hkkjr in ,d dne LoPNrk dh vksj Bhagalpur Lok Sabha Constituency ge lc dk gks ,d gh ukjkA lkiQ lqFkjk gks jsy gekjkAA of Bihar East Central Railway, Hajipur Works/Projects Completed : l Road over bridge in place of level crossing between l Electrification of rail section from Bharat Khand to Kataria.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us