48055-002: Jiangxi Xinyu Kongmu River

48055-002: Jiangxi Xinyu Kongmu River

Initial Environmental Examination Project number: 48055-002 September 2016 People’s Republic of China: Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement Project Prepared by the Xinyu City Government for the Asian Development Bank CURRENCY EQUIVALENTS Currency Unit – yuan (CNY) CNY 1.00 = $ 0.154 $ 1.00 = CNY 6.49 ABBREVIATIONS ADB Asian Development Bank IA Implementing Agency AEP Annual Exceedance Probability IEE Initial Environmental Examination AQG Air Quality Guideline JPG Jiangxi Provincial Government BOD5 5-day Biochemical Oxygen Demand MOE Ministry of Environment BOT Build Operate Transfer PM2.5 Particulate Matter with Diameter<2.5μ CNY Chinese Yuan PM10 Particulate Matter with Diameter<10μ COD Chemical Oxygen Demand PME Powered Mechanical Equipment CUT Common Utility Tunnel PMO Project Management Office DEIA Domestic Environmental Impact assessment PRC People’s Republic of China DO Dissolved Oxygen RP Resettlement Plan EA Executing Agency SEPP Soil Erosion Protection Plan EIA Environmental Impact Assessment SPS Safeguard Policy Statement EIS Environmental Impact Statement SS Suspended Solid EHS Environmental, Health and Safety SSUS Sub-Surface Utility System EMP Environmental Management Plan TN Total Nitrogen EMS Environment Monitoring Station TP Total Phosphorus EPB Environmental Protection Bureau TSP Total Suspended Particulates FSR Feasibility Study Report WHO World Health Organization GDP Gross Domestic Product WRB Water Resources Bureau GHG Greenhouse Gas WTP Water Treatment Plant GRM Grievance Redress Mechanism WWTP Wastewater Treatment Plant HSRND High Speed Railway New District XCG Xinyu City Government WEIGHTS AND MEASURES oC Degree centigrade m3 Cubic meter dB Decibel m3/a Cubic meter per annum ha Hectare (10,000 m2) m3/d Cubic meter per day kg Kilogram mg/kg Milligram per kilogram km Kilometer mg/l Milligram per liter km2 Square kilometer mg/m3 Milligram per cubic meter kW Kilowatt mu Chinese land unit (1 ha=15 mu) L Liter MW Megawatt (1 million watts) m Meter t Metric ton (1,000 kg) m2 Square meter t/a Ton per annum NOTE (i) In the report, “$” refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management or Staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. 1 Contents I. EXECUTIVE SUMMARY ................................................................................................................. 4 A. INTRODUCTION ............................................................................................................................. 4 B. THE PROJECT ............................................................................................................................... 4 C. BASELINE ENVIRONMENT .............................................................................................................. 6 D. IMPACTS AND MITIGATION MEASURES ............................................................................................ 7 E. PUBLIC CONSULTATION AND GRIEVANCE REDRESS MECHANISM ...................................................... 8 F. ENVIRONMENTAL MANAGEMENT PLAN............................................................................................ 8 G. RISKS AND ASSURANCES............................................................................................................... 8 H. CONCLUSION ................................................................................................................................ 8 II. INTRODUCTION ............................................................................................................................. 9 III. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK .......................................................... 11 A. POLICY FRAMEWORK .................................................................................................................. 11 B. LEGISLATIVE FRAMEWORK FOR ENVIRONMENT IMPACT ASSESSMENT IN THE PRC .......................... 11 C. INTERNATIONAL AGREEMENTS ..................................................................................................... 13 D. APPLICABLE PRC AND ADB POLICIES AND ASSESSMENT CATEGORIES .......................................... 13 E. ASSESSMENT STANDARDS .......................................................................................................... 13 IV. DESCRIPTION OF THE PROJECT .............................................................................................. 17 A. OVERVIEW ................................................................................................................................. 17 B. PROJECT BENEFITS .................................................................................................................... 22 C. PROJECT DESIGN ....................................................................................................................... 23 OUTPUT 1. INTEGRATED RURAL AND URBAN FLOOD MANAGEMENT SYSTEM ....................................... 23 OUTPUT 1.1: INCREASE FLOOD RETENTION CAPACITY ....................................................................... 23 OUTPUT 1.2: FLOOD PROTECTION ALONG KONGMU RIVER ................................................................. 34 OUTPUT 2: WATER POLLUTION MANAGEMENT ................................................................................... 35 OUTPUT 2.1: WASTEWATER PIPES AND PUMP STATIONS .................................................................... 35 OUTPUT 2.2: SOLID WASTE MANAGEMENT SYSTEM .......................................................................... 36 OUTPUT 2.3: CONSTRUCTED LAKES AND WETLANDS ......................................................................... 39 OUTPUT 3: ENHANCEMENT OF FLOOD AND ENVIRONMENTAL RISK COPING CAPACITY AND KNOWLEDGE DISSEMINATION ........................................................................................................................... 44 OUTPUT 3.1: CAPACITY DEVELOPMENT FOR FLOOD AND ENVIRONMENTAL RISK MANAGEMENT IN KONGMU RIVER WATERSHED ....................................................................................................... 44 OUTPUT 3.2: IMPROVEMENT OF FLOOD FORECASTING AND WARNING SYSTEM ................................... 44 OUTPUT 3.3: IMPROVEMENT OF THE WATER QUALITY MONITORING SYSTEM FOR RIVER AND WETLANDS 44 V. DESCRIPTION OF THE ENVIRONMENT ..................................................................................... 45 A. ENVIRONMENTAL SETTING ........................................................................................................... 45 B. PHYSICAL ENVIRONMENT OF THE PROJECT SITE .......................................................................... 47 C. ECOLOGICAL RESOURCES ........................................................................................................... 53 D. PROTECTED AREAS AND PHYSICAL CULTURAL RESOURCES .......................................................... 56 E. SOCIO-ECONOMIC CONDITIONS ................................................................................................... 58 F. EXISTING AND PREDICTED CLIMATE CHANGE ............................................................................... 60 G. ASSOCIATED FACILITIES .............................................................................................................. 63 VI. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ......................... 67 A. DESIGN PHASE AND AVOIDED IMPACTS......................................................................................... 67 B. PRE-CONSTRUCTION PHASE ....................................................................................................... 67 C. CONSTRUCTION PHASE ............................................................................................................... 68 1. SENSITIVE RECEPTORS AND PROJECT AREA OF INFLUENCE .......................................................... 68 2. SOIL AND EARTHWORKS .............................................................................................................. 69 3. WATER QUALITY ......................................................................................................................... 71 4. AIR QUALITY............................................................................................................................... 72 5. NOISE ........................................................................................................................................ 73 6. VIBRATION .................................................................................................................................. 74 7. SOLID WASTE ............................................................................................................................. 75 2 8. ECOLOGY AND BIODIVERSITY ...................................................................................................... 75 2. SOCIAL ISSUES ..........................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    133 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us