FORM XIII APPLICATION FOR CONSENT FOR DISCHARGE/CONTINUATION OF DISCHARGE UNDER SECTION 25 OF THE ACT. (See rule 32) APPLICATION FOR CONSENT FOR DISCHARGE/CONTINUATIONOF DISCHARGE From M/S. POORNODAYA AGRO TECH PVT. LTD. Date: 11/08/1999 To THE MEMBER SECRETARY Telangana State Pollution COntrol Board Paryavaran Bhavan,A-3,Industrial Estate, Sanathnagar, Hyderabad-500018. Sir, I/We apply foer CONSENT under section 25 of Water(Prevention and Control of Pollution Act, 1974(No. 6 of 1974)or bring into any new or altered outlet for the dischrage of Sewage/trade effluent to begin to make new dischrge of sewage/trade effluent or continue to make discharge of Sewage/trade effluent from land/premises owned by(1) Mukka Virupaksha Lingam for a period upto(2)............ (a) Sewage/sullage Via drains/outfall sewers/treatment works. (b)Trade effluent Via drains/outfall sewers/treatment works. (c)Solid wastes into (3): (i) Stream ......... (ii) Onland for irrigation, bearing Survey No.... Adjoining at a distance of.... (iii) Lake, pond adjoining/at a distance of stream/River. (iv) Directly on land for open percolation into sub-terranean strata of survey No... Adjoining /at a distance of..... (v) Tidal waters/estuarine waters known as....... (vi) Sea along/off the seashore shown as....... 2. The Annexure, Appendices other particulars and plan in triplicate are attached herewith. 3. I/We further declare that the information furnished in the Annexure, Appendices and plans is correct to the best of my/out knowledge. 4. I/We hereby submit that in case of change either of the point or the quality of discharge or its quality, a fresh application for CONSENT shall be made and until such CONSENT is granted, no change shall be made. 5. I/We hereby agree to submit to the State Board an application for renewal of Consent one month in advance of date of expiry of the consented period for outlet/discharge, if to be continued thereafter. 6. I/We undertake to furnish any other information within one month of its being called by the State Board. 7. Here I/We now enclose fee details. D.D NO. Bank Name Amount(Rs) 443995 Andhra Bank 24000.0 Yours Faithfully Signature Name of applicant :Mukka Virupaksha Lingam Address of applicant :Sy.No. 113, Panthini (V), Wardhannapet (M), Warangal Rural District ANNEXURE TO FORM XIII EXISTING / NEW/ ALTERED OUTLET/ DISCHARGE Note: Any applicant knowingly giving incorrect information or suppressing any information pertaining thereto shall be liable to punished under the Act. While filling this Annexure, the applicant not concerned with any of the items shall state “Not Concerned” against the relevant one: 1. Full name of the applicant : Mukka Virupaksha Lingam 2. Full Name of land premises/ institute/factory/ M/S. POORNODAYA AGRO TECH PVT. LTD. industry/ local body with address : Sy.No. 113, Panthini (V), Wardhannapet (M), Warangal Rural District 3. Give revenue / city survey number of land/ premises for which the application is made stating District/ Mandal and Village. : (a) Mandal : Wardhannapet (b) Village : Panthini 4. State : month and year in which the land/ premises/ / institute/ factory/ industry was actually put into commission or is proposed to be put into commission or the month and year from which the local body is functioning. : 5. State the Civil/ Military/Defence/ Industrial Estate Village Panchayat etc., under whose administrative jurisdiction the applicant's land/ premises is situated. : 6. (a) State whether the land/premises/ industry/ factory no has been declared as prohibited area : (b) If yes, state the name of the Authority and furnish a certified copy to the order under which the area has been declared as prohibited area. : 7. Is the industry/ factory for which application is made no closed on Sunday/ Holiday?. : 8.State working season per year of the Industrial plant. From Date To Date Jan Dec 9. (a) No. of workers attending the factory. : Shift Hours No. of Workers General Shifts(Hrs) 8 10 (b)No. of workers residing in the premises 0 10. For local bodies only (a)Present Population 1500 (b)Population Covered under regular sewerage Yes, Septic tank followed by soakpit facilities. (c)Population covered by conservancy latrines. Yes, Septic tank followed by soakpit (d)Population having septic tank/pit privy facilities. Yes, Septic tank followed by soakpit 14.Raw material used Sl. No. Description Quantity Units 1. Paddy 32 Tons/day (b)Give the list of Names of products manufactures per month in (M.T) Sl. No. Name of The Product Capacity Units 1. Boiled Rice 24 Tons/day (c)Give the list of Names of by-products manufactures per month in (M.T) Sl. No. Name of The By-Product Capacity Units (d)Give the list of possible intermediate products: Intermediate Product Name Source Quantity 12. State Daily Quantity of Water in liters utilised. Uses Quantity (KLD) Domestic 3.0 KLD Others Process, Washings & Boiler Feed 32.0 KLD 13. (A)State the hourly minimum and daily maximum quantity of effluents arising from land premises for which the application is made. Name Hourly Maximum Quantity(in Daily Maximum Quantity(in KLD) KLD) (B) State how measurement of Rate and QUANTITY are no carried out.. 14. State whether storm water drains are kept separate no from industrial/ domestic effluents. 15. Is domestic effluent allowed to get mixed in no industrial effluent? If yes, state ratio 16. (a)Describe if any treatment of industrial or domestic no effluent or one for the combined effluent is made. (b)Is the quality of effluent emanating either without no or after treatment approved by any authority? 16(A). Is any effluent from any shop/ shops toxic? no 17. Provision of disposal Provision for disposal State the area of land used Already made Proposed to be made for(in Hectares) 18. Given quantitative disposal of effluent in litres provided for the places mentioned below: Place of Disposal Domestic Industrial Mixed Quantity(KLD) 19. Is there any provision for equalizing or holding lagoons for tanks to store the effluents during unfavourable stream of tidal conditions? Type of Effluent Status 20. Is sufficient Land available/can be made available in caste pumping of the effluent on land has to be considered? 21(a). Details of composition of Domestic/ Industrial/ Combined effluents Details Of Before Treatment Discription of After Treatment Discription of Composition Effluent Before Effluent After Treatment Treatment 21. (b)Is the effluent toxic? no (c)State if the industrial effluent is having Unpleasant smell Irritating and/ or harmful Corrosive Colour effect (d)Is there any sudden change of temperature no exceeding 10°C at any time? 22. (a)Are facilities available with the applicant for carrying out the following tests of the waste water ? Tests of waste water Existing Proposed Details of Equipment 23. Does the Land/ Premises etc., (for which application is made) have open Land/Premises Toxic Organic Inorganic Microbiological 24. State details of solid wastes Solid wastes Dis. Quantity Method of collection Method of Disposal Place : Signature Date : Name & Address of the applicant .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages5 Page
-
File Size-