FORM 1 I. Basic Information S.No Item Details Construction of Proposed MSB IT/ITES Building 1

FORM 1 I. Basic Information S.No Item Details Construction of Proposed MSB IT/ITES Building 1

APPENDIX I (See paragraph-6) FORM 1 I. Basic Information S.No Item Details Construction of Proposed MSB IT/ITES Building 1. Name of the Project 2. S. No. in the Schedule 8 (b) - Townships and Area Development Project 2 3. Proposed Total plot area: 49998.49 m 2 Capacity/area/length/tonnage to be Total built up area: 3,31,346 m handled/command area/lease area/number of wells to be drilled. 4. New/Expansion/Modernization Amendment to theAnnexure Environmental 1 Clearance issued vide SEIAA/TN/F.523/EC/8(a)/213/2012 dated 05.09.2013 5. Existing capacity/Area etc NA 6. Category of Project i.e. ‘A’ or ‘B’ ‘A’ Asth per MoEF&CC Notification S.O. 3999(E) dated: 9 December, 2016. 7. Does it attract the general condition? No IF yes please specify. 8. Does it attract the specific condition? No If yes please specify. 9. Location Plot/survey/khasra No. 56/1B, 75/1, 75/5, 76/1A1, 76/1C1B, 76/4 (Part1&2), 76/5, 57/3B, 56/2A4A, 56/2A2B, 56/2B2A, 76/2B, 76/2A, 56/2A2A, 76/3, 75/2 A,75/2B, 75/4, 76/8, 75/8A1, 75/8A2, 75/7, 84/2B, 75/6, 56/2A4B, 56/2B2B, 75/3A, 75/3B, 76/7, 76/10, 76/1C1A1, 76/1A2, 76/1B, 76/1C2, 76/1D, 83/3, 84/3, 86/4A,76/9 Village Pallikaranai Village Tehsil Sholinganallur Taluk District Kancheepuram Railway Station: State Tamil Nadu 10. Nearest Railway station/Airport along with the distance in kms. Velachery Railway Station-2.5 Km - NNE TambaramAirport : Railway Station – 10 Km - WSW Chennai Airport -6.0 Km – NW 11. Nearest town, city, District Head Nearest Town: Pallikaranai – 0.33 Km - SE quarters along with distance in kms. Nearest City: Chennai District Head Quarters: Kancheepuram (70 Km) 12. Village Panchayats, Zilla Parishad, Ripon Buildings, Municipal Corporation, Local Body No.1131, EVR Periyar Salai, (complete postal addresses with Park Town, Chennai-600 003, Tamil Nadu phone nos. to be given) Phone No: +914425384510 13. Name of the applicant Dr.S.Thayalan and Others 14. Registered Address No.27, Second street, Balaji Nagar, Royapettah, Chennai – 600 014, Tamil Nadu. 15. Address for Correspondence Dr. S Thayalan C/O Ramakrishnan Sankaran K Raheja Corp Regus Olympia, Olympia Techpark, Level-2, Altius Block, No.1 SIDCO Industrial Estate, Guindy, Chennai 600 032, Tamil Nadu. Board: +91 44 4299 4022 Direct: +91 44 4299 4023 Mobile: +91 98840 96768 Email: [email protected] 16. Details of Alternative sites examined, No alternative sites examined. if any. Location of these sites should be shown on a toposheet. 17. Interlinked Projects No 18. Whether separate application of NA interlinked project has been submitted. 19. If yes, date of submission NA 20. If no, reason Since it is a commercial Project, no interlinked projects are envisaged. 21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest Conservation Act, 1980? (b) The Wildlife Protection Act, 1972? (c) The C.R.Z notification, 1991? 22 Whether there is any Government No Order/Policy relevant/relating to the site? 23. Forest Land involved (hectares) No 24. Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project. II. Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information / Yes/ Details thereof (with approximate quantities/ No Checklist No rates, wherever possible) with source of confirmation information data 1.1 Permanent or No The proposed project site is earmarkedAnnexure for2. temporary change in commercial development as per the land use land use, land cover letter. Land use letter is enclosed in or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing No NA land, vegetation and buildings? 1.3 Creation of new land No NA uses? Annexure 3. 1.4 Pre-construction Yes Soil investigation Report is enclosed in investigations e.g. bore houses, soil testing? 1.5 Construction works? No At present, there is no construction activity at the site. 1.6 Demolition works? No No demolition is required. 1.7 Temporary sites used No Construction workers will be hired from nearby for construction works area and so no temporary labor hutments are or housing of proposed. Proper sanitation facilities will be construction workers? provided at the project site. 3 1.8 Above ground Yes Approximately around 1,96,282m of soil would buildings, structures be excavated for foundations. The excavated earth or earthworks will be used for back filling, set back area, podium, including linear OSR and also for road formation. Top soil will be structures, cut and fill stacked separately and used for green belt or excavations development. 1.9 Underground works No Not Applicable. including mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and No Not Applicable manufacturing processes? 1.14 Facilities for storage Yes 1.Temporary storage will be done at the project of goods or site during the construction phase. materials? 2.Separate raw material handling yard will be made as per requirement. Cement will be separately stored under covered bags. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. 3.The raw material handling yard will be located within the project site and separated by suitable Solidenclosures Waste to eliminate surface runoff and air pollution. 1.15 Facilities for Yes treatment or disposal About 8Waste174 Kg / day Quantityof solid wastesDisposal likely to be of solid waste or generated. (kg/day) method liquid effluents? Organic Blocks I, 2385 Treated in Bio II, III Methanation Sludge Blocks I, 65 facility II, III Inorganic Blocks I, 5566 Sold to authorized II, III vendors E Waste Blocks I, 158 disposed to II, III Authorised TNPCB Liquid Effluent recyclers once in six months. Details Populat Quantit Sewage STP ion y of generat Capacity fresh ed water require d Construct 600 27KLD 25KLD Septic ion tanks with soak pits Operation 31803 786 1303 2 STPs will be installed About 1303 KLD of treated waste water will be generated of which 645 KLD will be used for toilet flushing and the remaining will be used for green belt development (55 KLD) and cooling purpose (538 KLD). There will not be any excess water disposal to CMWSSB sewer during non rainy days. During rainy days 55 KLD of treated sewage will be disposed to CMWSSB sewer. Also the only 496 KLD will be met from CMWSSBAnnexureand balance4 & 4290a. KLD will be met from treating Roof top rain water. Detailed water balance is attached in 1.16 Facilities for long No No long-term housing facilities proposed as most term housing of of the skilled/unskilled manpower required for operational worker the construction /operation activities will be hired from the nearby villages. 1.17 New road, rail or sea No NA traffic during construction or operation? 1.18 New road, rail, air No Not applicable as the existing 200 feet Radial Road waterborne or other will be used as access road. Internal road of 9.0 m transport width will be provided for smooth movement of infrastructure vehicles. including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion No Not applicable of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not envisaged transmission lines or pipelines? 1.21 Impoundment, No Not applicable damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers 1.22 Stream crossings? No Not applicable 1.23 Abstraction or No WaterAnnexure will be5 obtained. from CMWSSB. Acceptance transfers of water letter from CMWSSB for water supply is attached form ground or in surface waters? 1.24 Changes in water No There will not be any change in the drainage bodies or the land pattern or nearby water bodies. surface affecting drainage or runoff? 1.25 Transport of Yes The existing 200 feet radial road will be utilized personnel or for the transportation of material and personnel materials for during construction and operation phase. construction, operation or decommissioning? 1.26 Long-term No Not applicable dismantling or decommissioning or restoration works? 1.27 Ongoing activity No Not applicable. during decommissioning which could have an impact on the environment? 1.28 Influx of people to an Yes Influx of the people in both the phases will be Construction phase area in either temporary. temporarily or permanently? Temporary influx of around 600 people will be Operation phase engaged for the activity. Since the proposed project is a MSB IT Park there will be permanent influx of (approx.) 31803 people. 1.29 Introduction of alien No Not applicable species? 1.30 Loss of native species No Not applicable or genetic diversity? 1.31 Any other actions? No None. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply) : Details thereof (with approximate Information / Checklist Yes/ S. No. quantities/ rates, wherever possible) with confirmation No source of information data 2.1 Land especially undeveloped Yes The land is earmarked for MSB IT/ITES or agricultural land (ha) building.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    49 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us