Draft SR 509 East D Street Interchange Project December 2012 DRAFT Interchange Justification Report

Draft SR 509 East D Street Interchange Project December 2012 DRAFT Interchange Justification Report

INTERCHANGE JUSTIFICATION REPORT Draft SR 509 East D Street Interchange Project December 2012 DRAFT Interchange Justification Report SR 509 East D Street Interchange Project Tacoma, Washington Submitted to City of Tacoma Tacoma, Washington 20 December 2012 Submitted by BergerABAM, Inc. 33301 Ninth Avenue South, Suite 300 Federal Way, Washington 98003-2600 In association with Fehr and Peers Heffron Transportation Merritt Architecture Shannon & Wilson Inc. Widener & Associates Job No. A12.0149 INTERCHANGE JUSTIFICATION REPORT SR 509 East D Street Interchange Project Tacoma, Washington TABLE OF CONTENTS SECTION PAGE 1.0 POLICY POINT 1: NEED FOR ACCESS POINT REVISION .......................................................... 1 1.1 Summary ....................................................................................................................... 1 1.1.1 Transportation Demand ................................................................................... 1 1.1.2 Roadway Linkages and Access ....................................................................... 2 1.1.3 Traffic Operations ............................................................................................ 2 1.1.4 Safety ............................................................................................................... 3 1.2 Analysis and Data ......................................................................................................... 3 1.2.1 Forecasting ...................................................................................................... 3 1.2.2 Planned Improvements ................................................................................... 4 1.2.3 Operational and Safety Analysis Methods and Assumptions ........................ 6 1.3 Existing Conditions (2012) .......................................................................................... 6 1.3.1 Study Area ........................................................................................................ 6 1.3.2 Transportation Demand ................................................................................... 7 1.3.3 Roadway Linkages and Access ....................................................................... 7 1.3.4 Traffic Operations ............................................................................................ 8 1.3.5 Safety .............................................................................................................16 1.4 No-Build Option Conditions for 2035 (Design Year) .................................................19 1.4.1 Transportation Demand .................................................................................19 1.4.2 Roadway Linkages and Access .....................................................................20 1.4.3 Traffic Operations ..........................................................................................20 1.4.4 Safety .............................................................................................................27 1.5 No-Build Option Conditions for 2015 (Year of Opening) ..........................................29 1.5.1 Transportation Demand .................................................................................29 1.5.2 Roadway Linkages and Access .....................................................................30 1.5.3 Traffic Operations ..........................................................................................30 1.5.4 Safety .............................................................................................................35 1.6 Transportation Demand Management Strategies ....................................................35 1.7 Conclusions ................................................................................................................36 2.0 POLICY POINT 2: REASONABLE ALTERNATIVES .................................................................. 39 2.1 Summary .....................................................................................................................39 2.2 Alternatives Developed ..............................................................................................39 2.3 Alternative Screening ................................................................................................48 2.4 Recommended Configuration ....................................................................................50 2.5 Conclusions ................................................................................................................50 3.0 POLICY POINT 3: OPERATIONAL AND COLLISION ANALYSIS ............................................... 51 3.1 Summary .....................................................................................................................51 3.2 Analysis Methods and Assumptions .........................................................................51 3.2.1 Travel Demand Forecasting ..........................................................................52 City of Tacoma BergerABAM, A12.0149 DRAFT SR 509 East D Street Interchange Project 20 December 2012 Tacoma, Washington Page i of ix 3.2.2 Operational and Safety Analysis ...................................................................52 3.2.3 Collision Forecast Methodology ...................................................................52 3.3 Design Year Operations (2035) .................................................................................52 3.3.1 Transportation Demand .................................................................................52 3.3.2 Roadway Linkages and Access .....................................................................55 3.3.3 Traffic Operations ..........................................................................................55 3.3.4 Safety .............................................................................................................64 3.4 Year of Opening Conditions (2015) ...........................................................................66 3.4.1 Transportation Demand .................................................................................66 3.4.2 Roadway Linkages and Access .....................................................................66 3.4.3 Traffic Operations ..........................................................................................66 3.4.4 Safety .............................................................................................................72 3.5 Midday Conditions .....................................................................................................72 3.6 Conclusions ................................................................................................................72 4.0 POLICY POINT 4: ACCESS CONNECTIONS AND DESIGN ...................................................... 74 4.1 Summary .....................................................................................................................74 4.2 Directionality ..............................................................................................................74 4.3 Access Connections to Public Roads ........................................................................74 4.4 Design Standards and Deviations .............................................................................74 4.5 Justification ................................................................................................................75 4.6 Conclusion ..................................................................................................................75 5.0 POLICY POINT 5: LAND USE AND TRANSPORTATION PLANS .............................................. 76 5.1 Summary .....................................................................................................................76 5.2 Land Use .....................................................................................................................76 5.2.1 Current Land Use and Zoning .......................................................................76 5.2.2 Future Land Use .............................................................................................77 5.2.3 Land Use Impacts ..........................................................................................77 5.3 Local Transportation and Land Use Plans ................................................................77 5.3.1 City of Tacoma Comprehensive Plan ............................................................77 5.3.2 City of Tacoma Capital Facilities Program (Metro Parks Tacoma – Waterway Park) ..........................................................................................................77 5.3.3 City of Tacoma Shoreline Master Program ..................................................78 5.3.4 Tideflats Area Transportation Study .............................................................78 5.3.5 Thea Foss Development Authority Master Redevelopment Strategy .........78 5.4 Statewide Transportation Plans ................................................................................79 5.4.1 WSDOT Washington State Transportation Plan ...........................................79 5.4.2 WSDOT State Highway System Plan .............................................................79 5.5 Regional Transportation Plans ..................................................................................79 5.5.1 Puget Sound Regional Council Transportation 2040 Plan .........................79

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    150 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us