Report January 2020 Agenda Item 4.1 – Appendix 2 The Cambridgeshire and Peterborough Local Transport Plan Cambridgeshire and Peterborough Combined Authority 23217301 Report January 2020 The Cambridgeshire and Peterborough Local Transport Plan Prepared by: Prepared for: Steer Cambridgeshire and Peterborough Combined 28-32 Upper Ground Authority London SE1 9PD The Incubator 2 First Floor Alconbury Weald Enterprise Campus Alconbury Weald Huntingdon Cambridgeshire PE28 4WX +44 20 7910 5000 www.steergroup.com Our ref: 23217301 Steer has prepared this material for Cambridgeshire and Peterborough Combined Authority. This material may only be used within the context and scope for which Steer has prepared it and may not be relied upon in part or whole by any third party or be used for any other purpose. Any person choosing to use any part of this material without the express and written permission of Steer shall be deemed to confirm their agreement to indemnify Steer for all loss or damage resulting therefrom. Steer has prepared this material using professional practices and procedures using information available to it at the time and as such any new information could alter the validity of the results and conclusions made. The Cambridgeshire and Peterborough Local Transport Plan | Report Contents Executive Summary ............................................................................................................ 6 Policy alignment ................................................................................................................. 7 Vision, goals and objectives................................................................................................ 9 Overarching strategy ........................................................................................................ 11 Our priority schemes ........................................................................................................ 13 Implementing the strategy ............................................................................................... 18 1 The Cambridgeshire and Peterborough Local Transport Plan .................................... 20 Introduction ...................................................................................................................... 20 Progress to-date ............................................................................................................... 22 The Local Transport Plan .................................................................................................. 24 Transport Vision 2050 ...................................................................................................... 31 Evidence base ................................................................................................................... 35 2 Our Strategy ........................................................................................................... 49 Introduction ...................................................................................................................... 49 Our overall strategy .......................................................................................................... 50 Major schemes ................................................................................................................. 56 3 Local Strategies ....................................................................................................... 62 Introduction ...................................................................................................................... 62 Peterborough ................................................................................................................... 62 Greater Cambridge ........................................................................................................... 70 Huntingdonshire ............................................................................................................... 82 East Cambridgeshire ......................................................................................................... 89 Fenland ............................................................................................................................. 96 4 Our Policies ............................................................................................................ 101 Introduction .................................................................................................................... 101 January 2020 The Cambridgeshire and Peterborough Local Transport Plan | Report Figures Figure 1.1: The Local Transport Plan and other strategic documents ........................................ 28 Figure 1.2: Ratio of median house process to median salary ..................................................... 36 Figure 1.3: Observed traffic congestion in Cambridgeshire and Peterborough in 2015 ............ 37 Figure 1.4: Forecast traffic congestion in Cambridgeshire and Peterborough in 2041 .............. 38 Figure 1.5: Transport infrastructure and accessibility in 2018 ................................................... 39 Figure 1.6: Accessibility to major employment sites by public transport in 2018 ..................... 40 Figure 1.7: Method of travel to work ......................................................................................... 41 Figure 1.8: Percentage of total CO2emissions due to transport by local authority – 2005 to 2017 .................................................................................................................................................... 42 Figure 1.9: Transport CO2 emissions per capita by local authority in 2005 to 2017 .................. 43 Figure 1.10: Charging points per 100,000 of the population by Local Authority in 2019 .......... 44 Figure 1.11: 4G coverage of A and B roads by Local Authority in 2019 ..................................... 45 Figure 2.1: Movement and place function ................................................................................. 54 Figure 2.2: Indicative user hierarchy by movement and place function .................................... 54 Figure 2.3: Key projects for Cambridgeshire and Peterborough ................................................ 57 Figure 3.1: Summary of key projects in Peterborough ............................................................... 66 Figure 3.2: Summary of key projects in Greater Cambridge ...................................................... 74 Figure 3.3: Summary of key projects in Huntingdonshire .......................................................... 86 Figure 3.4: Summary of key projects in East Cambridgeshire .................................................... 93 Figure 3.5: Summary of key projects in Fenland ........................................................................ 99 Figure 4.1: Policy themes by objective and transport mode policy themes ............................ 102 Tables Table 1.1: Local transport plan objectives .................................................................................. 34 Table 4.1: Policy summaries ..................................................................................................... 103 Appendices Appendix A: Glossary of terms January 2020 Executive Summary This is the first Local Transport Plan for Cambridgeshire and Peterborough. It replaces the Interim Local Transport Plan, which was published in June 2017 and was based upon the existing Local Transport Plans for Cambridgeshire (Local Transport Plan 3) and Peterborough (Local Transport Plan 4). The Plan describes how transport interventions can be used to address current and future challenges and opportunities for Cambridgeshire and Peterborough. It sets out the policies and strategies needed to secure growth and ensure that planned large-scale development can take place in the county in a sustainable way. This Local Transport Plan has been produced in partnership with Peterborough City Council, Cambridgeshire County Council, the Greater Cambridge Partnership, and the city and District Councils of Cambridge, East Cambridgeshire, Fenland, Huntingdonshire and South Cambridgeshire. Engagement has taken place throughout with several of central government’s arm’s length bodies such as Highways England and Network Rail, as well as neighbouring transport and highway authorities. In addition to working with public sector partners, our work has also been informed by wider stakeholder engagement, including with transport operators; industry groups; and community organisations. The Plan is split in to three main parts: This Local Transport Plan sets out the vision, goals and objectives that define how transport will support the Cambridgeshire and Peterborough Combined Authority’s (Combined Authority) Growth Ambition, and our approach to meeting these objectives. A summary of the plan is provided in this Executive Summary. The Transport Delivery Plan summarises the projects that the Combined Authority – together with our partners – aims to deliver over the lifetime of the Local Transport Plan, and the mechanisms through which they will be delivered. It also describes how the plan will be monitored, reviewed and updated through time, and the roles and responsibilities of the Combined Authority and its delivery partners (separate annex). Our Policies describes requirements related to transport planning and design, delivery, and operation and maintenance for the Combined Authority, our public sector partners, and key private
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages120 Page
-
File Size-