Surface Water

Surface Water

15 SURFACE WATER ENTER HERE BACK TO CONTENTS Arrow Bowen Gas Project EIS 15 Surface Water 15.1 Introduction This chapter presents the environmental values of surface waters in the vicinity of the proposed Project, the potential impacts to these values from development of the Project, and the proposed mitigation measures to minimise these impacts. Further detail on the surface water assessment is provided in the Surface Water Technical Report (Appendix N) of this EIS. A cross reference to the locations where each of the requirements of the ToR has been addressed is given in Appendix B which references both the study chapters (Sections 1 through 34) and/or the Appendices (A through EE). 15.2 Methodology An assessment of the potential impacts of the development of the proposed Project on surface water resources was undertaken in the context of environmental values, as defined by the Queensland Environmental Protection (Water) Policy 2009 (EPP Water). A baseline water quality and geomorphology assessment was conducted at 22 locations and is further discussed in the Surface Water Technical Report (Appendix N) of this EIS. Relevant water quality objectives for the CSG field were identified from the Fitzroy River Sub-Basin Environmental Values and Water Quality Objectives (2011) and the Queensland Water Quality Guidelines (2009). A fluvial geomorphology assessment was undertaken at 22 locations from 20 to 24 May 2012. The assessment included field observations based on the AusRivAS (Australian River Assessment System) Physical assessment protocol, combined with desktop analysis of aerial photography and GIS data to determine stream order; sinuosity; floodplain and valley characteristics, and channel planform at each location. Rainfall, pan evaporation and other climate data from the Queensland Climate Change Centre of Excellence SILO database and bureau of meteorology (BOM) Climate Data Online resource were analysed to determine climate characteristics within the study area. Six BOM stations were located within and in close proximity to the study area. Stream flow, rainfall trends and flow duration curves were developed for each study catchment based on data available from BOM stations and NRM stream gauges. Major planned activities through the different stages of construction, commissioning, operation, and decommissioning phases of development have been assessed. This chapter discusses the scope of the surface water assessment undertaken, provides an overview of the surface water management regulatory framework, a description of the existing environmental values, potential impacts of the Project and proposed management measures to be adopted to minimise those impacts. A detailed description of the existing surface water environment within the Project area, including hydrology, water quality and fluvial geomorphology, the potential impact of the Project and proposed mitigation measures, is provided in the Surface Water Technical Report (Appendix N) of this EIS. Prepared for Arrow Energy Pty Ltd 15-1 42626960/15/A Arrow Bowen Gas Project EIS Section 15 Surface Water 15.3 Legislative Context, Policies and Standards The following legislation, policies and guidelines are relevant to identifying values and to providing guidance on mitigating and managing impacts on surface water. 15.3.1 Environment Protection and Biodiversity Conservation Act 1999 This Commonwealth act provides for the protection of matters of national environmental significance, including listed aquatic species and Ramsar sites. Changes to surface water systems due to CSG projects have the potential to impact aquatic species and Ramsar sites. Any action with the potential for a significant impact on these must be referred to the Minister for the SEWPaC and may require approval under this Act. 15.3.2 Environmental Protection Act 1994 The Environmental Protection Act 1994 (EP Act) aims to protect Queensland’s environment while allowing for development that improves the total quality of life, both now and in the future, in a way that maintains the ecological processes on which life depends (being ecologically sustainable development. The EP Act governs the management of surface water with regards to CSG fields. 15.3.3 Environmental Protection (Water) Policy 2009 The EPP (Water) sits under the EP Act. Amongst other functions EPP (Water) governs the discharge of wastewater to land, surface water, and groundwater, aims to protect environmental values and sets water quality objectives to provide guidance to protect environmental values. 15.3.4 Environmental Protection Regulation 2008, Environmental Protection (Waste Management) Policy 2000 and Environmental Protection (Waste Management) Regulation 2000. These pieces of legislation are supported by the former Department of Environment and Resource Management’s Environmental Protection Agency's 2010 Coal Seam Gas Water Management Policy1. 15.3.5 Water Act 2000 The Water Act 2000 (Water Act) provides a framework to deliver sustainable water planning, allocation management and supply processes to ensure the improved security of water resources. The Project is located within the areas covered by the Water Resources (Fitzroy Basin) Plan (2011) and the Water Resources (Burdekin Basin) Plan (2007), which sit under the Water Act. These plans set requirements for the taking of or interfering with overflow flow; therefore such activities need an operational works approval under Schedule 3, Table 4 of Sustainable Planning Regulation 2009. 1 The DERM Coal Seam Gas Water Management Policy 2010 was superseded by the EHP Coal Seam Gas Water Management Policy 2012 on the 21/12/2012, subsequent to the compilation of the draft Bowen Gas Project EIS. Arrow are reviewing the updated policy at the time of the Bowen Gas Project EIS being published, and may undertake further amendments to the Arrow CSG Water and Salt Management Strategy (Appendix AA) in keeping with the updated EHP policy, as part of a supplementary report to the EIS. Prepared for Arrow Energy Pty Ltd 15-2 42626960/15/A Arrow Bowen Gas Project EIS Section 15 Surface Water 15.3.6 Water Supply (Safety and Reliability) Act 2008 This legislation provides a regulatory framework for water service providers, recycled water management schemes, referable dams and flood mitigation responsibilities. 15.3.7 Fisheries Act 1994 (Qld) The Fisheries Act 1994 (Qld) is the Act for the management, use, development and protection of fisheries resources and fish habitats in Queensland. In the event that Arrow needs to establish waterway barriers during watercourse crossings, approval must be sought under the Fisheries Act 1994. 15.3.8 Coal Seam Gas Water Management Policy 20102 This policy was developed to give direction for the treatment and disposal of CSG water and to the role the government wishes to play in facilitating greater beneficial use. 15.3.9 Queensland Water Quality Guidelines (DERM, 2009) These guidelines provide a framework for assessing water quality in Queensland through the setting of water quality objectives. 15.3.10 Australian and New Zealand Guidelines for Fresh and Marine Water Quality (ANZECC, 2000) These guidelines provide a method for assessing water quality through comparison with guidelines derived from local reference values. 15.4 Existing Environmental Values EPP (Water) seeks to protect and/or enhance the suitability of Queensland’s waters for a variety of beneficial uses. The Environmental Values (EVs) and Water Quality Objectives (WQOs) for receiving waters within the Fitzroy Basin were specified in Schedule 1 of EPP (Water) in September 2011. Although EVs for the Burdekin Basin study area have not been previously specified by the Department of Environment and Resource Management (DERM; now EHP), EVs and pertinent water quality objectives for the Burdekin Basin have been identified in studies carried out for the Queensland Department of Natural Resources, Mines and Water (Greiner and Hall, 2006). 2 The DERM Coal Seam Gas Water Management Policy 2010 was superseded by the EHP Coal Seam Gas Water Management Policy 2012 on the 21/12/2012, subsequent to the compilation of the draft Bowen Gas Project EIS. Arrow are reviewing the updated policy at the time of the Bowen Gas Project EIS being published, and may undertake further amendments to the Arrow CSG Water and Salt Management Strategy (Appendix AA) in keeping with the updated EHP policy, as part of a supplementary report to the EIS. Prepared for Arrow Energy Pty Ltd 15-3 42626960/15/A Arrow Bowen Gas Project EIS Section 15 Surface Water A summary of the EVs associated with surface waters that are potentially impacted by the Project is provided in Section 15.5.3 (further details are provided in the Surface Water Technical Report (Appendix N) of this EIS). 15.4.1 Study Area The study area encompasses entire catchments within the CSG fields, and consists of four main catchments throughout the Burdekin and Fitzroy Basins, as illustrated in Figure 15-1. The northern basin, Burdekin, is approximately 131,000 km2 in area and comprises the Bowen, Suttor and Burdekin Rivers and their tributaries. This river network discharges into the Coral Sea approximately halfway along the Great Barrier Reef, near Ayr. The Fitzroy Basin is the largest coastal catchment in eastern Australia, covering an area of approximately 142,600 km2 and encompassing the Isaac-Connors, Dawson, Comet, Nogoa, Mackenzie, and Fitzroy River systems. The Fitzroy Basin drains to the southern end of the Great Barrier Reef, just east of Rockhampton. The majority

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    27 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us