Erode District

Erode District

ERODE DISTRICT Kudimaramath works for the 2020-21 year Sl.No 1 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures in B.P.Agraharam Branch canal from mile 0/0 to 2/0 in Bhavani Distributory under the jurisdiction of the "M-1 Keel Bhavani Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Thayirpalayam village in Erode Taluk" Estimate Amount (Rs. In 28.00 Date of 20-5-2020 lakhs) commencement Expenditure w.r.t 90% of 25.03 Date of completion (If 10.09.2020 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) clearing Progress of work (% Work Completed jungle,desiltinge and Completed) Nature of work sluice cross masonry repair work. Name of the Farmers M-1 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed PHOTOS Before Execution After Execution Kudimaramath works for the 2020-21 year Sl.No 2 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures in Erode Distributory from mile 0/0 to 3/0 and Distributory from mile 54/0 to mile 55/0 of LBP Main Canal under the jurisdiction of the "M-4 Keel Bhavani Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Mullampatty and Nasiyanur Village in Perundurai taluk of Erode District " Estimate Amount (Rs. In 29.00 Date of 22-5-2020 lakhs) commencement Expenditure w.r.t 90% of 26.1 Date of completion (If 10.09.2020 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) clearing Progress of work (% Work Completed jungle,desiltinge and Completed) Nature of work sluice cross masonry repair work. Name of the Farmers M-4 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed PHOTOS The photos before execution and after execution should be in the same location & orientation. Before Execution After Execution Kudimaramath works for the 2020-21 year Sl.No 3 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures of 2-1-60 Branch in Kugalur Distributory of LBP Main canal under the jurisdiction of "U-5 Keel Bhavani Murai neer pasana vivasaigal sabai" in Gobichettipalayam Taluk of Erode District." Estimate Amount (Rs. In 40.00 Date of 20-5-2020 lakhs) commencement Expenditure w.r.t 90% of 35.04 Date of completion (If 10.09.2020 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) clearing Progress of work (% Work Completed jungle,desiltinge and Completed) Nature of work sluice cross masonry repair work. Name of the Farmers U-5 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed PHOTOS Before Execution After Execution Kudimaramath works for the 2020-21 year Sl.No 4 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures in Mettupalayam Distributory from mile 0/0 to mile 2/0 under the jurisdiction of the "U-10 Keel Bhavani Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Pallapalayam Village in Perundurai taluk " Estimate Amount (Rs. In 45.00 Date of 20-5-2020 lakhs) commencement Expenditure w.r.t 90% of 40.39 Date of completion (If 10.09.2020 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) clearing Progress of work (% Work Completed jungle,desiltinge and Completed) Nature of work sluice cross masonry repair work. Name of the Farmers U-10 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed PHOTOS Before Execution After Execution Kudimaramath works for the 2020-21 year Sl.No 5 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and Cross masonry structures in Erode Distributory fro mile 3/0 to 4/0 and ondikkaranpalayam sub branch canal under the jurisdiction of the "M-5 Keel Bhavani Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Nasiyanur Village in Erode taluk of Erode District" Estimate Amount (Rs. In 43.00 Date of 21-5-2020 lakhs) commencement Expenditure w.r.t 90% of 38.58 Date of completion (If 10.09.2020 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) clearing Progress of work (% Work Completed jungle,desiltinge and Completed) Nature of work sluice cross masonry repair work. Name of the Farmers M-5 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed PHOTOS Before Execution After Execution Kudimaramath works for the 2020-21 year Sl.No 6 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures from mile 7/0 to Tailend of Kugalur distributory and 6-5-158 Branch, 7-1-400 Rightside parallel channel of Kugalur Distributory of LBP Main canal under the jurisdiction of U-6 Keel Bhavani Murai neer pasana vivasaigal sabai" in Gobichettipalayam Taluk of Erode District. " Estimate Amount (Rs. In 39.00 Date of 18-5-2020 lakhs) commencement Expenditure w.r.t 90% of 34.67 Date of completion (If 10.09.2020 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) clearing Progress of work (% Work Completed jungle,desiltinge and Completed) Nature of work sluice cross masonry repair work. Name of the Farmers U-6 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed PHOTOS The photos before execution and after execution should be in the same location & orientation. Before Execution After Execution Kudimaramath works for the 2020-21 year Sl.No 7 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures in Bhavani Distributory from mile 9/3 to tail end, Vyramangalam branch and Siraimeetanpalayam branch under the jurisdiction of the "M-3 Keel Bhavani Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Periyapuliyur village in Bhavani Taluk of Erode District" Estimate Amount (Rs. In 28.50 Date of 27-5-2020 lakhs) commencement Expenditure w.r.t 90% of 25.54 Date of completion (If 10.09.2020 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) clearing Progress of work (% Work Completed jungle,desiltinge and Completed) Nature of work sluice cross masonry repair work. Name of the Farmers M-3 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed PHOTOS Before Execution After Execution Kudimaramath works for the 2020-21 year Sl.No 8 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures of 34-7-170 Distributory , Sub Branches 0-5-0 and 1-5-215 of 35-7-255 Distributory of LBP Main canal under the jurisdiction of "U-7 Keel Bhavani Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Gobichettipalayam Taluk of Erode District. Estimate Amount (Rs. In 45.00 Date of 18-5-2020 lakhs) commencement Expenditure w.r.t 90% of 40.41 Date of completion (If 10.09.2020 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) clearing Progress of work (% Work Completed jungle,desiltinge and Completed) Nature of work sluice cross masonry repair work. Name of the Farmers U-7 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed PHOTOS Before Execution After Execution Kudimaramath works for the 2020-21 year Sl.No 9 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures of 3-2-415 distributory, 3-5-490 direct sluice, Bommanur and Koonamolai Branches of 6-4-055 Distributory and mile 3/7 to 5/5 of LBP Main canal under the jurisdiction of "U-1 Keel Bhavani Murai neer pasana vivasaigal sabai" in Sathyamangalam Taluk of Erode District. " Estimate Amount (Rs. In 28.75 Date of 18-5-2020 lakhs) commencement Expenditure w.r.t 90% of 25.79 Date of completion (If 10.09.2020 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) clearing Progress of work (% Work Completed jungle,desiltinge and Completed) Nature of work sluice cross masonry repair work. Name of the Farmers U-1 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed PHOTOS Before Execution After Execution Kudimaramath works for the 2020-21 year Sl.No 10 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and Cross masonry structures in Moolakkarai, Vannankattuvalasu, Nanjanapuram Branch Canal in Thindal Distributory under the jurisdiction of the "M-6 Keel Bhavani Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Nanjanapuram Village in Erode taluk of Erode District" Estimate Amount (Rs. In 29.00 Date of 20-5-2020 lakhs) commencement Expenditure w.r.t 90% of 26.08 Date of completion (If 10.09.2020 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) clearing Progress of work (% Work Completed jungle,desiltinge and Completed) Nature of work sluice cross masonry repair work. Name of the Farmers M-6 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed PHOTOS Before Execution After Execution Kudimaramath works for the 2020-21 year Sl.No 11 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures in 1-0-349 (R ) branch canal and 0-4-520 (R ) sub branch of 2-2-70 (L) branch of Unjalur Distributary under the jurisdiction of the "M-7 Keel Bhavani Murai Neer Pasana Vivasaigal Sabai" in Lower Bhavani Irrigation System In Perundurai and Modakuruchi of Erode District Estimate Amount (Rs.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    56 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us