Northolt Corridor | CFA5 | Nrhl Crio Corridor Northolt

Northolt Corridor | CFA5 | Nrhl Crio Corridor Northolt

LONDON-WEST MIDLANDS ENVIRONMENTAL STATEMENT ENVIRONMENTAL MIDLANDS LONDON-WEST | Vol 2 Vol LONDON- | Community Forum Area report Area Forum Community WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA5 | Northolt Corridor | CFA5 | Northolt Corridor November 2013 VOL VOL VOL ES 3.2.1.5 2 2 2 London- WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA5 | Northolt Corridor November 2013 ES 3.2.1.5 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. A report prepared for High Speed Two (HS2) Limited: High Speed Two (HS2) Limited, Eland House, Bressenden Place, London SW1E 5DU Details of how to obtain further copies are available from HS2 Ltd. Telephone: 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Northolt Corridor/No 5 | Contents Contents 1 Introduction 1 1.1 Introduction to HS2 1 1.2 Purpose of this report 1 1.3 Structure of this report 3 2 Overview of the area and description of the Proposed Scheme 5 2.1 Overview of the area 5 2.2 Construction of the Proposed Scheme 13 2.3 Operation of the Proposed Scheme 28 2.4 Community forum engagement 29 2.5 Route section main alternatives 30 3 Agriculture, forestry and soils 35 3.1 Introduction 35 4 Air quality 37 4.1 Introduction 37 4.2 Scope, assumptions and limitations 37 4.3 Environmental baseline 38 4.4 Effects arising during construction 40 4.5 Effects arising from operation 41 5 Community 43 5.1 Introduction 43 5.2 Scope, assumptions and limitations 43 5.3 Environmental baseline 43 5.4 Effects arising during construction 45 5.5 Effects arising from operation 47 6 Cultural heritage 49 6.1 Introduction 49 6.2 Scope, assumptions and limitations 49 6.3 Environmental baseline 50 i CFA Report – Northolt Corridor/No 5 | Contents 6.4 Effects arising during construction 53 6.5 Effects arising from operation 54 7 Ecology 57 7.1 Introduction 57 7.2 Scope, assumptions and limitations 57 7.3 Environmental baseline 58 7.4 Effects arising during construction 66 7.5 Effects arising from operation 70 8 Land quality 73 8.1 Introduction 73 8.2 Scope, assumptions and limitations 74 8.3 Environmental baseline 74 8.4 Effects arising during construction 79 8.5 Effects arising from operation 86 9 Landscape and visual assessment 89 9.1 Introduction 89 9.2 Scope, assumptions and limitations 89 9.3 Environmental baseline 90 9.4 Temporary effects arising during construction 92 9.5 Permanent effects arising during operation 96 10 Socio-economics 101 10.1 Introduction 101 10.2 Scope, assumptions and limitations 101 10.3 Environmental baseline 101 10.4 Effects arising during construction 105 10.5 Effects arising during operation 108 11 Sound, noise and vibration 111 11.1 Introduction 111 11.2 Environmental baseline 112 11.3 Effects arising during construction 114 11.4 Effects arising during operation 119 12 Traffic and transport 121 12.1 Introduction 121 12.2 Scope, assumptions and limitations 121 12.3 Environmental baseline 121 12.4 Effects arising during construction 124 12.5 Effects arising from operation 128 13 Water resources and flood risk assessment 131 13.1 Introduction 131 13.2 Scope, assumptions and limitations 132 ii CFA Report – Northolt Corridor/No 5 | Contents 13.3 Environmental baseline 133 13.4 Effects arising during construction 140 13.5 Effects arising from operation 144 14 References 145 List of figures Figure 1: HS2 Phase One route and community forum areas 2 Figure 2: Area context map 6 Figure 3: Schematic of construction compounds for civil engineering works 17 Figure 4: Schematic of construction compounds for railway installation works 18 Figure 5: Indicative construction programme 26 Figure 6: Business sector composition in the LBE, LBB and London 103 Figure 7: Proportion of employment by industrial sector in the LBE, LBB and London 104 List of tables Table 1: Demolitions at Mandeville Road vent shaft main compound 23 Table 2: Estimated construction, demolition and excavation waste 25 Table 3: Operational waste forecast for the Proposed Scheme 29 Table 4: Protected and/or notable species 63 Table 4: Summary of receptors 78 Table 5: Summary of baseline CSM for sites which may pose a contaminative risk for the Proposed Scheme 81 Table 6: Summary of temporary (construction) effects 83 Table 7: Summary of permanent (post-construction) effects 84 Table 8: Direct adverse effects on residential communities and shared open areas that are considered to be significant on a community basis 116 Table 9: Train flows and speeds 119 Table 10: Typical vehicle trip generation for construction compounds in this area 125 Table 11: Surface water features potentially affected by the Proposed Scheme 133 Table 12: Summary of geology and hydrogeology in the Northolt Corridor area 135 iii CFA Report – Northolt Corridor/No 5 | Contents iv CFA Report – Northolt Corridor/No 5 | Structure Structure of the HS2 Environmental Statement The Environmental Statement (ES) documentation comprises: Non-technical summary (NTS): which provides a summary in non-technical language of the Proposed Scheme, the likely significant environmental effects of the Proposed Scheme, both beneficial and adverse, and the means to avoid or reduce the adverse effects; Volume 1: Introduction to the Environmental Statement and the Proposed Scheme. This describes High Speed Two (HS2), and the environmental impact assessment process, the approach to consultation and engagement, details of the permanent features and generic construction techniques as well as a summary of main strategic and route-wide alternatives and local alternatives (prior to 2012) considered; Volume 2: Community forum area reports and map books – 26 reports and associated map books providing a description of the Proposed Scheme and of environmental effects in each area; Volume 3: Route-wide effects – provides an assessment of the effects of the Proposed Scheme where it is not practicable to describe them within the CFA descriptions in Volume 2; Volume 4: Off-route effects – provides an assessment of the off-route effects of the Proposed Scheme; Volume 5: Appendices and map books – contains supporting environmental information and associated map books; and Glossary of terms and list of abbreviations: contains terms and abbreviations, including units of measurement, used throughout the ES documentation. v CFA Report – Northolt Corridor/No 5 | Structure vi CFA Report – Northolt Corridor/No 5 | Introduction 1 Introduction 1.1 Introduction to HS2 1.1.1 High Speed Two (HS2) is a new high speed railway proposed by the Government to connect major cities in Britain. Stations in London, Birmingham, Leeds, Manchester, South Yorkshire and the East Midlands would be served by high speed trains running at speeds of up to 360kph (225mph). 1.1.2 HS2 is proposed to be built in two phases. Phase One, the subject of this ES, will involve the construction of a new railway line of approximately 230km (143m) between London and Birmingham. Construction will begin in 2017 and the line will become operational by 2026; with a connection to the West Coast Main Line (WCML) near Lichfield and to the existing HS1 railway line in London. 1.1.3 During Phase One beyond the dedicated high speed track, these high speed trains will connect with and run on the existing WCML to serve passengers beyond the HS2 network to destinations to the north. A connection to HS1 would also allow some services to access that high speed line through east London and Kent and connect with mainland Europe via the Channel Tunnel. 1.1.4 Phase Two will involve the construction of lines from Birmingham to Leeds and Manchester, with construction commencing approximately 2023, and planned to be operational by 2033. 1.1.5 Section 4 of Volume 1 describes the anticipated operational characteristics of HS2, including the anticipated frequency of train services. As Volume 1 shows, the frequency of trains is expected to increase over time and to increase further upon opening of Phase Two. In assessing the environmental effects of the Proposed Scheme the anticipated Phase 2 operational frequency has been used. For further detail of the anticipated operation of the Proposed Scheme in the Northolt Corridor area (CFA5), see Section 2.4. 1.1.6 The Government believes that the HS2 network should link to Heathrow and its preferred option is for this to be built as part of Phase Two. However, the Government has since taken a decision to pause work on the Heathrow link until after 2015 when it expects the Airports Commission to publish its final report on recommended options for maintaining the country’s status as an international aviation hub. 1.1.7 For consultation and environmental assessment purposes, the proposed Phase One route has been divided into 26 community forum areas (CFA), as shown in Figure 1. This has enabled wider public engagement on the Proposed Scheme design and on the likely adverse and beneficial effects. 1.2 Purpose of this report 1.2.1 This CFA report presents the likely significant effects of the construction and operation of the Proposed Scheme on the environment within CFA5 (Northolt Corridor).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    156 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us