Reigate & Banstead Borough-Wide Traffic Modelling 2009-2026

Reigate & Banstead Borough-Wide Traffic Modelling 2009-2026

S Transport and Highways REIGATE & BANSTEAD BOROUGH-WIDE TRAFFIC MODELLING 2009-2026 Core Strategy Transport Assessment Report February 2012 Project Title: Reigate & Banstead Borough-wide Traffic Modelling 2009-2026 Document Title: Core Strategy Transport Assessment Report, February 2012 Client Reference: Date: 22 February 2012 Prepared By: Print Emma Brundle Sign Authorised By: Print Steve Howard Sign . Amendment List Iss. / Rev. Iss. / Rev Date Remove Insert Page Iss. / Rev. Page Iss. / Rev. 1st Draft 22/11/11 2nd Draft 4/01/12 3rd Final 22/02/12 0201SF10 07/08/02 Filename: S:\Project-current\3380\Projects\RBBC Resubmission\Reports\Core Strategy Transport Assessment Report, February 2012.doc Issue No. 03 Page 2 Document No.3380/RBBC_Re/Final Reigate & Banstead Borough-wide Traffic Modelling 2009-2026 Core Strategy Transport Assessment Report, February 2012 CONTENTS EXECUTIVE SUMMARY 8 PART A 12 1 INTRODUCTION 13 1.1 Overview 13 1.2 Objectives 13 1.3 Scope 14 1.4 Report Structure 14 2 OVERVIEW OF MODELLING & METHODOLOGY 15 2.1 Suitability for Purpose 15 2.2 Study Area 15 2.3 Study Approach 16 2.4 Estimated Future Development Data 16 3 MODELLING RESULTS AND ANALYSES 18 3.1 General 18 3.2 Summary Network Statistics 18 3.3 Additional Traffic 21 3.4 Highway Capacity 34 3.5 Junction Delay 42 3.6 Local Road Network Analysis 57 3.7 Strategic Route Network Analysis 62 3.8 Merge/Diverge Assessment of the SRN 62 4 CONCLUSIONS 64 4.1 Summary 64 4.2 Traffic Impacts of Development 64 4.3 Local Road Network Findings 65 4.4 Strategic Route Network Findings 66 4.5 Limitations of Study 67 PART B 68 5 MODEL DESCRIPTION AND VALIDATION 69 5.1 Context 69 5.2 Vehicle Types 69 5.3 Time Period 69 5.4 Assignment Method 69 5.5 Zoning System 69 5.6 Model Validation 72 5.7 Network Audit and Extension 72 5.8 Count Data 72 5.9 Assignment Validation 72 5.10 Counts vs. Flow Bandwidth Plots 76 6 TRIP RATE ESTIMATES FOR INDIVIDUAL SITES 77 6.1 Data and Scenarios 77 6.2 TRICS Methodology 78 6.3 Additional Trips 82 6.4 Trip Ends 92 7 FORECAST MATRICES 96 7.1 Do-Minimum Forecast 96 7.2 2026 Development Scenario Forecasts 97 Issue No. 03 Page 3 Document No.3380/RBBC_Re/Final Reigate & Banstead Borough-wide Traffic Modelling 2009-2026 Core Strategy Transport Assessment Report, February 2012 LIST OF FIGURES Figure 2.1: Extent of study area ....................................................................................................... 16 Figure 3.1: 2026 Scenario 1a flows less 2009 Base flows ................................................................ 21 Figure 3.2: 2026 Scenario 1b flows less 2026 Scenario 1a flows..................................................... 24 Figure 3.3: 2026 Scenario 2 flows less 2026 Scenario 1a flows ....................................................... 27 Figure 3.4: 2026 Scenario 3 flows less 2026 Scenario 1a flows ....................................................... 29 Figure 3.5: 2026 Scenario 3 flows less 2026 Scenario 2 flows......................................................... 31 Figure 3.6: Roads sensitive to additional traffic and congestion between 2009 base and 2026 Scenario 1a ....................................................................................................................................... 35 Figure 3.7: Roads sensitive to additional traffic and congestion between 2026 Scenario 1a and 2026 Scenario 1b .............................................................................................................................. 36 Figure 3.8: Roads sensitive to additional traffic and congestion between 2026 Scenario 1a and 2026 Scenario 2 ................................................................................................................................ 37 Figure 3.9: Roads sensitive to additional traffic and congestion between 2026 Scenario 1b and 2026 Scenario 2 ................................................................................................................................ 38 Figure 3.10: Roads sensitive to additional traffic and congestion between 2026 Scenario 1a and 2026 Scenario 3 ................................................................................................................................ 39 Figure 3.11: Roads sensitive to additional traffic and congestion between 2026 Scenario 3 and 2026 Scenario 2 ................................................................................................................................ 40 Figure 3.12: Location of top twenty junctions with the greatest increases in junction delay between 2009 Base & 2026 Scenario 1a ......................................................................................... 56 Figure 4.1:Summary of trips in the borough for average AM peak period (0700 – 1000) .............. 65 Figure 5.1: Reigate & Banstead borough modelled zone plan ........................................................ 70 Figure 5.2: Reigate & Banstead borough modelled zone plan, focused on Reigate & Redhill town centres .............................................................................................................................................. 71 Figure 5.3: Graph showing the correlation between modelled and observed flows ...................... 73 Figure 5.4: 2009 counts vs flows bandwidth plot for Reigate & Banstead study area.................... 76 Figure 6.1: 2026 Scenario 1a dispositions of estimated additional departure trips ....................... 88 Figure 6.2: 2026 Scenario 1a dispositions of estimated additional arrival trips ............................. 88 Figure 6.3: 2026 Scenario 1b dispositions of estimated additional departure trips ....................... 89 Figure 6.4: 2026 Scenario 1b dispositions of estimated additional arrival trips ............................. 89 Figure 6.5: 2026 Scenario 2 dispositions of estimated additional departure trips ......................... 90 Figure 6.6: 2026 Scenario 2 dispositions of estimated additional arrival trips ............................... 90 Figure 6.7: 2026 Scenario 3 dispositions of estimated additional departure trips ......................... 91 Figure 6.8: 2026 Scenario 3 dispositions of estimated additional arrival trips ............................... 91 Figure 7.1: Diagram showing trip ends incorporated in 2026 Do-Minimum matrix ....................... 97 Figure 7.2: Processes undertaken to create the forecast matrix for Scenario 1a ........................... 98 Figure 7.3: Diagram showing trip ends incorporated in the 2026 Development scenario matrices .......................................................................................................................................................... 99 Issue No. 03 Page 4 Document No.3380/RBBC_Re/Final Reigate & Banstead Borough-wide Traffic Modelling 2009-2026 Core Strategy Transport Assessment Report, February 2012 LIST OF TABLES Table 2.1: Elements for scenario testing ......................................................................................... 17 Table 3.1: Reigate and Banstead modelled link network proportions ............................................ 18 Table 3.2: Reigate & Banstead borough network summary statistics ............................................ 19 Table 3.3: Roads most sensitive to additional traffic between 2026 Scenario 1a and 2009 Base .. 23 Table 3.4: Roads most sensitive to additional traffic between 2026 Scenario 1b and 2026 Scenario 1a ...................................................................................................................................................... 25 Table 3.5: Roads most sensitive to additional traffic between 2026 Scenario 2 flows less 2026 Scenario 1a ....................................................................................................................................... 28 Table 3.6: Roads most sensitive to additional traffic between 2026 Scenario 3 flows less 2026 Scenario 1a ....................................................................................................................................... 30 Table 3.7: Roads most sensitive to additional traffic between 2026 Scenario 3 flows less 2026 Scenario 2 ......................................................................................................................................... 32 Table 3.8: Junctions sensitive to the greatest increases in junction delay between the proposed development scenarios .................................................................................................................... 45 Table 3.9: Junction sensitive to increases in junction delay and additional flow between the base and scenario 1a ................................................................................................................................ 54 Table 3.10: Most sensitive junctions to increases in junction delay and additional flow between scenario 1a and scenario 1b ............................................................................................................ 55 Table 3.11: Modelled links on the A23 (N)bound ............................................................................ 58 Table 3.12: A23 (N)bound summary statistics ................................................................................. 58 Table 3.13: Modelled links on the A23 southbound ........................................................................ 59 Table 3.14: A23 southbound summary statistics ............................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    116 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us