1. Form I 2. Form I A

1. Form I 2. Form I A

Urban Social Infrastructure with Convention cum Exhibition Centre, Hotel and Mall ANDHRA PRADESH TOURISM DEVELOPMENT CORPORATION SURVEY NOS. 107/2B & 107/3A2, LALACHERUVU, RAJAMAHENDRAVARAM, EAST GODAVARI DISTRICT 1. FORM I 2. FORM I A Submitted By Studies & Documentation by Andhra Pradesh Tourism Development M/s Team Labs and Consultants Corporation (An ISO Certified Organization) Kakinada , East Godavari B-115 - 117 & 509, Annapurna Block, Phone: 7799525588 Aditya Enclave, Ameerpet, Hyderabad- 500 038 Phone: 91-040-23748555/616 Fax : 91-040-23748666 e-mail: [email protected] SUBMITTED TO STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH GOVERNMENT OF INDIA APPENDIX I (See paragraph – 6) FORM 1 S.No Item Details 1 Name of the Project/s Urban Social Infrastructure with Convention cum Exhibition Centre, Hotel and Mall by Andhra Pradesh Tourism Development Corporation 2 S.No. in the Schedule B category (Expected cost of the project: 110.0 Crores) 3 Proposed capacity/area/length/ Annexure I tonnage to be handled/command area/lease area/number of wells to be drilled 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc. NA 6 Category of Project i.e 'A' or 'B' B category 7 Does it attract the general condition? No If yes, please specify 8 Does it attract the Specific condition? No If yes, please specify. 9 Location Plot/Survey/Khasra No. Survey Nos. 107/2B & 107/3A2, Village Lalacheruvu Tehsil Rajamahendravaram District East Godavari State Andhra Pradesh 10 Nearest railway station/airport along Godavari Railway Station at a distance of with distance in kms. 2.6 km. 11 Nearest Town, City, District Rajahmundry Headquarters along with distance in kms. 12 Village Panchayats, Zilla Parishad, DTCP Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13 Name of the Applicant Sri. G. Bhimashankara Rao 14 Registered Address Andhra Pradesh Tourism Development Corporation Kakinada , East Godavari 15 Address for Correspondence: Andhra Pradesh Tourism Development Corporation Kakinada , East Godavari Name Sri. G. Bhimashankara Rao Designation(Owner/Partner/CEO) Regional Director & Executive Director APTDC Kakinada FI - 1 S.No Item Details Address Andhra Pradesh Tourism Development Corporation Kakinada , East Godavari. Pin Code 533 072 E-mail [email protected] , [email protected] Telephone Number (M) 7799525588 Fax No. 16 Details of alternative Sites examined, Village-District-State if any. Location of these sites should NA be shown on a topo sheet. 17 Interlinked Projects No 18 Whether separate application of interlinked project has been submitted? 19 If yes, date of submission 20 If no, reason 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972 ? (c) The C.R.Z Notification, 1991 ? 22 Whether there is any Government Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) No 24 Whether there is any location pending No against the project and /or land in which the project is propose to be set up? (a) Name of the Court (b) Case No (c) Orders/directions of the Court, if any and its relevance with the proposed project. FI - 2 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate Information/Checklist quantities /rates, wherever S.No. Yes/No confirmation possible) with source of information data 1.1 Permanent or temporary change Yes The site area is located in land use, land cover or Rajahmundry Municipal topography including increase in Corporation (RMC). The present intensity of land use (with respect land use is Urban Social to local land use plan) Infrastructure with Convention cum Exhibition Centre, Hotel & Mall construction project. Presently the land is barren and is not used for any productive purpose. The proposed project shall enhance the land cover. 1.2 Clearance of existing land, No The land is barren containing vegetation and buildings? mainly shrubs and bushes. The same shall be cleared. 1.3 Creation of new land uses? No The present land used for Urban Social Infrastructure with Convention cum Exhibition Centre, Hotel & Mall construction project. 1.4 Pre-construction investigations e.g. Yes bore houses, soil testing? 1.5 Construction works? Yes The project is allocated for Urban Social Infrastructure with Convention cum Exhibition Centre, Hotel & Mall construction project. 1.6 Demolition works? No 1.7 Temporary sites used for No Labor shall be employed from the construction works or housing of local areas, hence no labour/ construction workers? construction camps are proposed. 1.8 Above ground buildings, structures Yes Built up Area: Annexure I or earthworks including linear Cut and Fill quantity: Annexure II structures, cut and fill or excavations 1.9 Underground works including No mining or tunneling? 1.10 Reclamation works? No 1.11 Dredging? No 1.12 Offshore structures? No 1.13 Production and manufacturing No Urban Social Infrastructure with FI - 3 Details thereof (with approximate Information/Checklist quantities /rates, wherever S.No. Yes/No confirmation possible) with source of information data processes? Convention cum Exhibition Centre, Hotel & Mall construction project. 1.14 Facilities for storage of goods or Yes Construction materials like materials? cement, steel, sand, paints, aggregate etc shall be stored on site. The cement and paints are stored indoor, while the remaining is stored out doors. 1.15 Facilities for treatment or disposal Yes The treated water shall be treated of solid waste or liquid effluents? and reused for flushing the toilets, followed by on land irrigation and HVAC make up water requirement, and on land irrigation. Hence all the recycled water is utilized completely and is considered as a zero discharge. The water balance, water recycling quantities and the design details of sewage treatment plant are presented in Annexure –III. The garbage shall be collected and the collected garbage shall be sent segregation point located with in the site and then sent to Municipal solid waste management facility. The garbage management plan is enclosed in Annexure – IV. 1.16 Facilities for long term housing of Yes Required labour shall be drawn operational workers? from neighboring areas/villages. 1.17 New road, rail or sea traffic during No construction or operation? 1.18 New road, rail, air waterborne or No other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No lines or pipelines? 1.21 Impoundment, damming, No The local hydrology shall be FI - 4 Details thereof (with approximate Information/Checklist quantities /rates, wherever S.No. Yes/No confirmation possible) with source of information data culverting, realignment or other considered while designing the changes to the hydrology of storm water drains. watercourses or aquifers? 1.22 Stream crossings? No 1.23 Abstraction or transfers of water Yes The domestic water requirement form ground or surface waters? during occupation shall be drawn from Municipal Supply (RMC). 1.24 Changes in water bodies or the No The proposed storm water drains land surface affecting drainage or shall consider increased run off run-off? due to the project and shall be provided with sufficient number of collection sumps and rainwater harvesting structures. 1.25 Transport of personnel or materials Yes Trucks shall be used for for construction, operation or transporting the materials. decommissioning? 1.26 Long-term dismantling or No decommissioning or restoration works? 1.27 Ongoing activity during No decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes The local area is developing at a temporarily or permanently? faster pace due to the commercial area development in the surrounding areas. 1.29 Introduction of alien species? No 1.30 Loss of native species or genetic No diversity? 1.31 Any other actions? No FI - 5 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities /rates, S.No. Information/checklist confirmation Yes/No wherever possible) with source of information data 2.1 Land especially undeveloped or Yes Undeveloped land of 2.4308 agricultural land (ha) hectares. 2.2 Water (expected source & Yes Ground water and Rural water competing users) unit: KLD supply scheme. Water requirement during occupation is 177.8 KLD. During construction the water requirement is 30 KLD. 2.3 Minerals (MT) No 2.4 Construction material – stone, Yes Annexure – V: Lead distances of aggregates, sand / soil (expected construction materials. Annexure source – MT) – VI: Quantity of construction material requirement. 2.5 Forests and timber (source – MT) Yes Local authorized Suppliers 2.6 Energy including electricity and fuels Yes DG sets and construction (source, competing users) Unit: fuel equipment shall be used during (MT), energy (MW) construction, which shall use mainly HSD as fuel. The energy requirement during occupation is presented in Annexure – VII. DG set (1250

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    65 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us