Enoch Hill Wind Farm

Enoch Hill Wind Farm

Enoch Hill Wind Farm Further Environmental Information Volume 1: Main Report February 2017 2 © Amec Foster Wheeler Environment & Infrastructure UK Limited Contents Volume 1 Main Report 1. Introduction 1-1 1.1 Background 1-1 1.2 How to Read this FEI 1-2 1.3 Enoch Hill Wind Farm – Revised Layout 1-3 1.4 The Project Team 1-4 1.5 References 1-4 2. EIA Process 2-1 2.1 Overview of EIA 2-1 2.2 EIA Methodology 2-1 2.3 Scope of the EIA 2-1 ES Consultation Responses 2-1 Cumulative Effects 2-6 2.4 Community Engagement 2-12 2.5 References 2-12 3. Site Selection and Design Evolution 3-1 3.1 Site Identification Process 3-1 3.2 Site Context 3-1 3.3 Design Evolution 3-1 Site Design Iterations 3-1 4. Description of the Proposed Development 4-1 4.1 Introduction 4-1 4.2 Development & Design Layout 4-1 Turbine Layout 4-2 Micrositing 4-3 Wind Turbine Parameters 4-4 On-site Access Tracks 4-4 Infrastructure Layout 4-5 Temporary Construction Compound and Laydown Area 4-5 Off-site Electrical Connection 4-6 4.3 Proposed Site Access 4-7 Site Entrance 4-7 Abnormal Loads 4-7 General Construction Traffic 4-7 4.4 Construction Process 4-7 Proposed Programme 4-7 Hours of Working 4-8 Standard Construction Working Practices 4-9 Health and Safety during Construction 4-9 Environmental Management during Construction 4-10 Construction Method Statement (CMS) 4-10 February 2017 Doc Ref. 37898CGOS042i1R 3 © Amec Foster Wheeler Environment & Infrastructure UK Limited 4.5 Construction Details 4-11 Materials Import 4-18 Concrete Batching Plants 4-20 Post-Construction Development, Site Restoration and Commissioning 4-21 4.6 Operational Details 4-21 Land Management 4-21 Meteorological Effects and Turbine Control 4-21 Turbine Maintenance 4-22 Environmental Management during Operation 4-22 Site Waste Management 4-22 4.7 Decommissioning Details 4-22 Wind Farm Decommissioning Requirements 4-22 Decommissioning Process 4-23 Control Building and Distribution System Decommissioning 4-23 Access Track Decommissioning 4-23 4.8 References 4-23 5. Planning Policy Context 5-1 5.1 Introduction 5-1 5.2 Changes in Planning Policy 5-1 National Planning Policy, Guidance and Advice 5-1 Development Plan 5-1 Other Material Considerations 5-2 5.3 References 5-8 6. Renewable Energy Policy, Carbon Balance and Peat Management 6-1 6.1 Introduction and Overview 6-1 6.2 Changes to Renewable Energy, Climate Change and Planning Policy Frameworks 6-1 Changes in Energy & Climate Change Policy Frameworks 6-1 Renewable Energy Targets 6-2 Changes to Planning Policy Context 6-2 6.3 Carbon Savings 6-3 6.4 Carbon Storage and Emissions 6-4 6.5 Carbon Balance and Payback Calculation 6-4 6.6 Summary 6-6 6.7 References 6-6 7. Noise 7-1 7.1 Introduction and Overview 7-1 7.2 Changes to Policy and Legislative Context 7-1 7.3 Application Consultation Responses 7-1 Proposed Noise Condition Limits 7-2 Post Commissioning Noise Monitoring 7-3 7.4 Revised Layout and Turbine Noise Level Data 7-4 Potential Receptors 7-4 Proposed Development – Turbine Sound Power Levels 7-4 Cumulative Developments – Turbine Sound Power Levels 7-5 7.5 Predicted Effects: Construction, Operation, Decommissioning and Cumulative 7-7 7.6 Evaluation of Residual Effects 7-8 7.7 Conclusions 7-8 February 2017 Doc Ref. 37898CGOS042i1R 4 © Amec Foster Wheeler Environment & Infrastructure UK Limited 8. Shadow Flicker 8-1 8.1 Introduction and Overview 8-1 8.2 Changes to Policy and Legislative Context 8-1 8.3 Application Consultation Responses 8-1 8.4 Implications of Revised Layout 8-1 8.5 Shadow Flicker Predicted Effects 8-1 8.6 Evaluation of Residual Effects 8-1 8.7 Conclusions 8-1 8.8 References 8-1 9. Landscape and Visual 9-1 9.1 Introduction 9-1 Chapter Structure 9-1 9.2 Consultation and Scope of Assessment 9-2 East Ayrshire Council 9-2 Scottish Natural Heritage 9-5 9.3 Methodology 9-6 Assessment Parameters 9-7 Defining the Study Area 9-7 Landscape Planning Policy and Guidance 9-7 Landscape and Visual Impact Assessment 9-8 Cumulative Wind Energy Development 9-9 9.4 Zone of Theoretical Visibility and Viewpoint Analysis 9-11 Zone of Theoretical Visibility (ZTV) Analysis 9-12 Viewpoint and Cumulative Viewpoint Analysis 9-12 9.5 Baseline Description 9-18 Baseline Landscape Receptors 9-18 Baseline Visual Receptors 9-21 Information Gaps 9-24 Future Baseline 9-24 9.6 Landscape Design Statement and Mitigation 9-24 Landscape Design Objectives 9-24 Landscape Design Considerations 9-25 Design Evolution 9-27 Mitigation Inherent in Proposed Development 9-28 9.7 Residual Landscape Effects 9-28 Overview of the Landscape Character of the Development Site 9-28 Identification of the Landscape Character of the Development Site 9-29 Direct Landscape Effects: Southern Uplands and Forestry: Enoch Hill LCA 9-30 Direct Landscape Effects: Southern Uplands: Benty Cowan Hill LCA 9-37 Indirect Effects on the Surrounding Landscape Character 9-41 Landscape Designations: Afton SLCA 9-43 9.8 Residual Visual Effects 9-45 Visual Effects during Construction, Operation and Decommissioning 9-45 Visual Receptors: Settlements and Residential Properties 9-46 Visual Effects on Views from Transport Routes 9-52 Visual Receptors: Recreational Routes 9-57 Visual Effects on Views from Recreational and Tourist Destinations 9-61 9.9 Summary of Residual Landscape and Visual Effects 9-64 9.10 Summary and Conclusions 9-71 Consultation and Scope of Assessment 9-71 Viewpoint and Cumulative Viewpoint Analysis 9-72 Landscape Design Statement and Mitigation 9-72 Mitigation Inherent in Proposed Development 9-74 Landscape Effects 9-74 Visual Effects 9-75 Response to Consultation 9-75 Conclusions 9-76 9.11 References 9-77 February 2017 Doc Ref. 37898CGOS042i1R 5 © Amec Foster Wheeler Environment & Infrastructure UK Limited 10. Historic Environment 10-1 10.1 Introduction and Overview 10-1 10.2 Changes to Policy and Legislative Context 10-1 10.3 Application Consultation 10-2 10.4 Implications of Revised Layout 10-5 10.5 Predicted Effects: Construction, Operation, Decommissioning and Cumulative 10-5 Operational 10-5 Cumulative 10-7 10.6 Evaluation of Residual Effects 10-7 10.7 Conclusions 10-7 10.8 References 10-7 Documentary Sources 10-7 Online Sources 10-7 11. Ecology 11-1 11.1 Introduction and Overview 11-1 11.2 Changes to Policy and Legislative Context 11-1 11.3 Application Consultation Responses 11-2 11.4 Implications of Revised Layout 11-5 11.5 Predicted Effects: Construction, Operation, Decommissioning and Cumulative 11-6 Construction, Operational and Decommissioning Disturbance Effects 11-6 GWDTEs 11-8 Running Water, Salmonids and Freshwater Pearl Mussel 11-8 Otter and Water Vole 11-8 Badger and Herpetofauna 11-9 Bats 11-9 Cumulative 11-9 11.6 Evaluation of Residual Effects 11-9 11.7 Conclusions 11-10 11.8 References 11-10 12. Ornithology 12-1 12.1 Introduction and Overview 12-1 12.2 Changes to Policy and Legislative Context 12-1 12.3 Application Consultation Responses 12-1 12.4 Implications of Revised Layout 12-3 12.5 Predicted Effects: Construction, Operation, Decommissioning and Cumulative 12-3 Construction, Operational and Decommissioning Disturbance to Breeding and Wintering Birds 12-3 Collision-Risk (Operational Effects) 12-3 12.6 Evaluation of Residual Effects 12-4 12.7 Conclusions 12-4 12.8 References 12-4 February 2017 Doc Ref. 37898CGOS042i1R 6 © Amec Foster Wheeler Environment & Infrastructure UK Limited 13. Geology, Hydrology and Hydrogeology 13-1 13.1 Introduction and Overview 13-1 13.2 Changes to Policy and Legislative Context 13-1 13.3 Application Consultation Responses 13-2 13.4 Implications of Revised Layout 13-3 Potential Receptors 13-3 Potentially Significant Effects 13-4 13.5 Predicted Effects: Construction, Operation, Decommissioning and Cumulative 13-4 Surface Water Courses (Flows and Quality) 13-4 Groundwater Body (Flows and Quality) 13-5 Private Water Supplies 13-5 GWDTEs 13-5 Peat Hydrology 13-6 13.6 Evaluation of Residual Effects 13-6 13.7 Conclusions 13-6 13.8 References 13-6 14. Traffic and Transport 14-1 14.1 Introduction and Overview 14-1 14.2 Changes to Policy and Legislative Context 14-1 14.3 Application Consultation Responses 14-1 14.4 Implications of Revised Layout 14-3 Traffic Flows 14-3 14.5 Predicted Effects: Construction, Operation, Decommissioning and Cumulative 14-4 Construction Effects 14-4 Operational Effects 14-7 Decommissioning Effects 14-8 14.6 Evaluation of Residual Effects 14-10 14.7 Conclusions 14-11 14.8 References 14-11 15. Socio-economics, Tourism and Recreation 15-1 15.1 Introduction and Overview 15-1 15.2 Changes to Policy and Legislative Context 15-1 15.3 Baseline Review 15-2 15.4 Application Consultation Responses 15-3 15.5 Implications of Revised Layout 15-4 15.6 Predicted Effects: Construction, Operation, Decommissioning and Cumulative 15-4 Economic and Employment Effects 15-4 Accommodation 15-6 Land Use and Public Access 15-6 Recreation 15-6 Tourism 15-9 15.7 Evaluation of Residual Effects 15-9 15.8 Conclusions 15-10 15.9 References 15-10 February 2017 Doc Ref. 37898CGOS042i1R 7 © Amec Foster Wheeler Environment & Infrastructure UK Limited 16. Infrastructure, Telecommunications and Safety 16-1 16.1 Introduction and Overview 16-1 16.2 Changes to Policy and Legislative Context 16-1 16.3 Application Consultation Responses 16-1 16.4 Implications of Revised Layout 16-2 16.5 Predicted Effects: Construction, Operation, Decommissioning and Cumulative 16-2 16.6 Evaluation of Residual Effects 16-3 16.7 Conclusions 16-3 17.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    221 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us