Dossier of overall Karnataka and 17 PRS in compliance to the NGT orders in the matter of OA. 673/2018 State: Karnataka Estimated urban population: 22941508 1 Status of Sewage management: Overall Karnataka 17 PRS Estimated sewage generation 3356.5 MLD 884.25 MLD Existing no. of STPs and 141 STPs + 2 FSSM 40 STPs, Treatment Capacity Capacity = 2289.56 MLD Capacity = 635.54 MLD Capacity Utilization of 1592.4 MLD, 410 MLD, existing STPs percent utilization = 69.4% Percent utilization = 64.1% Sewage being treated through 4.53 MLD through FSSM (2.26 Insitu bioremediation: proposed for the Alternate technology (MLD) MLD in Devanahalli and 2.27 construction of artificial island in Dorekere MLD in Nelamangala) (global village Techpark) and Kempambudhi (Sonnenahalli bridge) amounting to ₹62.41 lakh Gap in Treatment Capacity in 1066.47 MLD, 248.71 MLD Percentage gap = 31.7% Percentage gap = 28.1% No. of Operational STPs 128 STPs + 2 FSSM No. of Operational STPs 37 No. of non-operational STPs 13 STPs No. of non-operational STPs 3 No. of Complying STPs 95 STPs complying 29 STPs complying 39 STP compliance data yet to 7 STPs compliance data yet to be procured be procured No. of Non-complying STPs 7 STPs non-complying 4 STPs non-complying 1.1 Details of each existing STP in the State: Karnataka (Annexure1a) 17 PRS (Annexure1b) Bengalur Other than Total Bengalur Other than Total u Bengaluru u Bengaluru No. of STPs 33 108 STP + 2 141STP 11 29 40 FSSM + 2 FSSM Existing treatment 1182.5 1107.06 2289.56 426 209.43 635.43 capacity (MLD) Capacity 920.6 671.78 1592.4 273.8 136.18 410 utilization (MLD) 1.2 Details of ongoing (under construction, commissioned and trial run) STPs of State: Karnataka (Annexure 2a) 17 PRS (Annexure 2b) Bengalur Other than Total Bengaluru Other than Total u Bengaluru Bengaluru Commissio No. of STPs 0 10 10 0 3 3 ned and trial run Designed 0 47.1 47.1 0 31 31 capacity (MLD) Under No. of STPs 8 47 55 1 7 8 constructio n Designed 420 339.77 759.7 150 30.3 180.3 capacity (MLD) 7 1 1.3 Details of proposed STPs in the State: 110 STPs Karnataka (Annexure 3a) 17 PRS (Annexure 3b) Bengaluru Other than Total Bengalur Other than Total Bengaluru u Bengaluru No. of STPs 14 56 STPs + 120 0 30 STPs+ 1 30 STPs+ 1 50 FSSM FSSM FSSM Treatment 124 150 (STP)+ 274.51 0 90.196 90.196 capacity 100 (FSSM) (MLD) 50 FSSM have been administratively approved and ₹50 Crore has been allocated and are in the DPR preparation stage. Additionally, 101 FSSM have been proposed to the Government of Karnataka for administrative approval. 2 Details of Industrial Pollution: 2.1 Status of industries and effluent As directed by the NGT in the matter of OA 593/2017, details of the industries and ETP status has been uploaded in the River Basin web portal, created by CPCB, by all the Regional Offices of KSPCB. The data compilation and scrutiny is under progress and the status will be presented in the next quarterly report. 2.2 Status of Common Effluent Treatment Plant Number of CETPs: 10 Installed Capacity = 5895 KLD; Operational Capacity = 3315 KLD; Total number of industries connected to the CETPs = 746 Sl CETP name Installed Operational No. of Compliance Action taken for non- No capacity capacity member complying CETPs (KLD) (KLD) industries 1 Eco Green 200 100 439 Complying Solution Systems Pvt Ltd, KIADB, Doddaballapur 2 Pai and Pai 300 240 27 Complying Chemicals-1 3 Pai and Pai 40 35 9 Complying Chemicals-2 4 Bangalore Eco 100 30 46 Non- Notice of Proposed Direction park complying (NPD) issued, personal hearing conducted, directions issued as per the rules. 5 CETP Malur 60 45 41 Complying 6 Govind Solvents 75 45 42 Non- Criminal case registered, NPD complying issued, personal hearing conducted. 7 Viwa eco-club 20 20 40 Complying 8 Lidkar Tanners 1000 200 84 Not working 9 CETP Mangalore- 3500 2000 5 Complying 1 MSEZ 2 10 CETP Mangalore- 600 600 13 Complying 2, Kotepura 5895 3315 746 Details of under construction and proposed CETPs: District Address Status Designed Proposed date of capacity completion Bidar 2nd phase, Kolar industrial area Under construction 1.2 MLD 31/03/2024 Yadgiri KIADB, Kadechur-badiyal Under construction 5 MLD 31/03/2024 industrial area Peenya Peenya industrial area EOI issued Na 31/03/2024 Bellary KIADB, 4th stage apparel park Proposed Na 31/03/2024 Raichur KIADB, Growth cente Proposed Na 31/03/2024 3 Solid Waste Management: 3.1 Total number of Urban Local Bodies and their Population: Other than Bengaluru: 288 ULB, population = 14541508; BBMP: 198, population = 8400000 Total urban population = 22941508 3.2 Current Municipal Solid Waste Generation: 1 Quantity of MSW generated (TPD) 11085 2 Quantity of MSW collected (TPD) 10198.2 3 Quantity of MSW segregated & transported (TPD) 6872.7 4 Quantity of MSW processed (TPD) 5838 5 Quantity of MSW disposed in secured land fill site (TPD) 3619.56 6 Gap in Solid Waste Management UTs (TPD) 1627.44 3.3 Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc: Installed capacity of the processing facilities in the State is 6304 TPD and Operational Capacity is 2584 TPD as per the reports submitted by ULBs. Composting Vermi Bio-methanation Refuse Derived W2E Combustible composting Fuel waste Waste Product Waste Product Waste Product Waste Product Waste supplied to process produc process produc process produced process produc process cement plant ed ed ed ed ed ed ed ed OTB 1614.98 207.9 86.16 17.435 7.75 0.06 2.1 2.1 1 17 (TPD) BBMP 200356. 26,046 Nil Nil 6 65 m3/d 0 0 0 Nil (TPD) 3 Total 2164 280 86.16 17.5 13.75 0.24 2.1 2.1 1 17 (TPD) m3/d 3.4 Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%): Instructions have been given to ULBs to ensure that the existing MSW processing facility is used to its fullest capacity, since many of the ULBs were unable to ensure 100% utilization of existing facility because of infrastructure gaps. Accordingly 219 ULBs DPRs have been approved with the Designed capacity of 9159 TPD. 3 3.5 No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction): Existing Facility: KSPCB has issued authorization to M/s. Rock Crystals C&D waste processing facility located at Chikkajal Bengaluru and it is operational with a capacity of 1000 TPD. Proposed facility: M/s. Rubbel Revival Pvt Ltd., has obtained Consent For Establishment from KSPCB on 28.05.2020 to establish 750 MTPD plant in BBMP land located at Kannur village, Bangalore to process C&D waste. Additionally, sites for C& D waste processing facilities have been identified at Shivalli (50TPD) Hubli – Dharwad, at Vantamuri, Srinagar Belagavi, Mangalore, Mysore and Kalburgi. 3.6 Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source: Out of existing 6590 wards, 100% D-D collection is being carried out in 6409 wards. 3.7 Details of MSW treatment facilities proposed and under construction (no., capacity, and technology): 219 DPR have been approved Under SBM scheme for developing 9159 TPD processing facilities. The technology adopted in the DPRs include windrow composting, vermi, Boimethanation etc. 219 ULBs have invited tender to implement the contents of DPR. Bangalore: KSPCB has issued the Consent of Establishment for 11.5 MW waste-to-energy plant at Bidadi to Karnataka Power Corporation Limited (KPCL). Details of other proposed waste-to-energy facilities in Bengaluru is as follows: 4 3.8 No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills: There are 202 Dumpsites and 52 Sanitary Landfills sites in the State. 219 ULBs are developing SLFs under Swachh Bharat Mission scheme. 3.9 No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers: ULBs have been instructed not to dump the municipal solid waste on the rivers bank. There are 38 cities (Excluding BBMP) located on the River banks of the State out of which 26 cities have finalized their SWM DPRs under Swachh Bharat Mission(U) and are under various stages of implementation. 3.10 Bio-medical Waste Management: Total Bio-medical generation: 65.6 TPD + 2579 tons of COVID waste No. of Hospitals and Health Care Facilities: 35869 Status of Treatment Facility/ CBMWTF: 65.6 TPD (CBMWTF = 61.5 TPD, deep burial = 4.1 TPD); COVID waste incinerated = 2579 tones 3.11 Hazardous Waste Management: Total Number of HW Generating industry 3451 Quantity of hazardous waste Landfillable 52125 MTA generated (Metric Tonne) Incinerable 35044 MTA Recylable 119967 MTA Utilizable 155326 MTA Total 362901 MTA No. of Common hazardous waste TSDF/ Commomn incinerators/Common secured landfill Name and Address of the industry Capacity 5 Mother Earth Environ Tech Pvt. Ltd, Plot No.217, Harohalli Indl. Area, 2nd phase, 95,000T/10yr Kanakapura Tq, Ramanagara Dist. Ramky Enviro Engineers Ltd, Sy. No.75 to 85 of pemmanahalli and sy.No.7 & 9 of 40,000MT/A Thimmanayakanahalli, Dabaspet, Nelamangala Tq. Bangalore. Mother Earth Environ Tech Private Limited Plot No 158 - 164, KIADB Kadechur Industrial 2,57,297 T Area, Plot No 158-164, KIADB Kadechur I.E, Kadechur, Yadgir Dist 3.12 Plastic Waste Management: Total Plastic Waste generation: 627.4 TPD Treatment/ Measures adopted for reduction or management of plastic waste: Projects commencing under “waste to energy” initiative by BBMP to address the gap in MSW treatment.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages187 Page
-
File Size-