PRE FEASIBILITY REPORT 1. Introduction 1. Identification Of

PRE FEASIBILITY REPORT 1. Introduction 1. Identification Of

PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Manganese ore deposit lease area is located at village – Pandharwani, Taluka – Khairlanji, Balaghat District (MP). 4.232 ha lease area with capacity expansion from 2000 TPA to 3600 TPA is being operated by the lessee M/s D. P. Rai, having office at “Nanhaka”, 10, East High Court Road, Ramdeshpeth, Nagpur (M/S) with valid consent to operate. The lease area was sanction for 20 year from 11.05.98 to10.05.2018. 2. Brief description of nature of the project Manganese ore mining has been carried out by opencast manual method and proposed mining will be carried out by opencast as well as underground other than fully mechanized method. 3. Need for the project and its importance to the country and or region Minerals are the chief source of industrialization and play an important role in the present phase of the national economy and overall development of the nation. Manganese ore is of vital importance in industrial economy as manganese is an essential constituent of steel and there is no satisfactory substitute for making of steel in which it is present from 0.5% to 0.75%. Mn ore also use in dry cell batteries, driers for paints and varnishes, as a coloring agent in ceramics and for production of permanganate and other chemicals. Mineral resources of any country are the “TREASURE-TROVE” of its national economy; the State of Madhya Pradesh is richly endowed with mineral wealth. It is the sole producer of diamond in the country. Coal, limestone, manganese ore, bauxite, copper ore, dolomite, fire clay, slate pyrophyllite-diaspore are the main minerals occurring in the State. Besides these minerals, the state is fast emerging as a dimensional stone producer. The State is blessed with favorable geological and geotectonic settings. Rocks ranging from Precambrian to recent era to accommodate every episode of mineralisation are present. In terms of the mineral production the state ranks third next only to Jharkhand and Chhattisgarh. The rich mineral wealth provides ample scope for the development mineral based industry in the State. State is enriched with good deposit of manganese ore mainly spread over in the Balaghat, Chhindwara and Jhabua districts. The total reserves of 23.64 million tonnes of manganese ore are available in the State constituting 14.09% of total national reserve. The "Bharveli manganese mine" in Balaghat district is largest underground mine operating in Asian sub-continent. The manganese ore deposits of the State are being exploited mainly by the Manganese Ore India Limited. During the year 2001-02, manganese ore has contributed Rs. 1.51 crores as royalty to the State Exchequer. 4. Demand –Supply gap Currently there is a gap of 0.5 million tonnes between demand and supply of high grade manganese ore. The demand is only going to increase in the coming years as the high grade deposits deplete. 5. Imports vs. Indigenous production Going by planning commission projection, the total domestic production is expected to reach 4.2 million tonnes by the end of five year plan, but then 2.5 million tonnes will still have to be imported to meet steel sector's demand. 6. Export possibility India annually exports about 15 per cent of ill total production of manganese ore. However, there has been gradual decline in the quantity of export since 1971 on ward. In 1960-61 India exported 11.661 lakh tones of manganese ore valued at Rs. 221 million. This reached the record high of 16.36 lakh tones valued at Rs. 140 million but fell down to 2.65 lakh tones and valued at Rs. 595 million in9 2000-01. Table I7.XIII gives some idea about the trends of manganese ore export from India. Bulk of this export goes to Japan (60 per cent), France, Czech, Slovakia, United Kingdom, United States, Belgium, Germany, Canada and South Korea. Kolkata, Vishakhapatnam, Maragos, Chennai and Mumbai are the main ports which handle the export. The declining trend in export is mainly attributed to stiff competition from the South Africa, Mexico, Brazil, Australia etc; lack of demand, low price, increasing domestic consumption and restriction imposed on the export of high grade ores. Emphasis on the export of Ferro-manganese instead of raw ore would fetch higher prices in the international market. 7. Employment generation (direct and indirect) due to the project During mining operation about 25-30laboures i.e. skilled, semi-skilled and un- skilled will be required Indirect employment - Driver, cleaner for loader & dumper, loading and unloading points where labours are required. 2. Project description 1. Types of project: Mining project of Manganese ore 2. Location of the Project District/ Taluka Village Khasara no. Area in Ownership State ha of land Balaghat, Khairlanji Pandharwani 1P, 2P, 4P, 9P, 10P, 4.232 Govt. and MP 11P private land 2 The mining lease area is located in survey of India Toposheet no. 55 O/13 lies between the longitude 79o50’26.5’’-79o50’39.80’’ East & Latitude 21o37’27.6’’- 21o37’36.6’’ North. Use of Minerals Manganese ores are vital importance in industrial economy as manganese is an essential constituent of steel and there is no satisfactory substitute for it in the making of steel in which it is present from 0.5% to 0.75%. Mn ore also use in dry cell batteries, manufacture of driers for paints and varnishes, as a coloring agent in ceramics and for the production of permanganate and other manganese chemicals. 3. Details of alternate site: Mining is site specific project and mineral deposit has been identified by certifying agency; hence alternative site is not applicable. 4. Size or magnitude of operation: The total lease area 4.232 ha area and capacity expansion from 2000TPA to 3600 TPA through opencast as well as underground other than fully mechanized mining method. 5. Project description with process details: Opencast as well as underground other than fully mechanical mining method will be adopted. Loading and unloading on trucks has been done by excavator cum loader. Presently 1.1109ha area has been excavated during past mining activity upto 330mRLm and during conceptual period working is being carried out in same pit in depth wise. No further excavation will be carried out. During the first year working main incline and vertical winze/shaft in the ore zone will be developed for underground working. The main incline is proposed upto excavated till mRL 240 and vertical winze/shaft upto mRL 250. During the conceptual period dump ore working also done. During the conceptual period about 0.9861ha will be backfilled using mine waste and rest of area will be backfilled using water. Reserves and resources estimation during the year Category wise updated reserves and resources with grade Classification Code Quantity Grade Total float Mineral reserve 20482 Ferro Alloy Total Mineral Resources 20482 (A)Mineral Reserves (1)Probable Mineral 122 20482 As above Reserve (B) Remaining Resources (1) Prefeasibility Mineral 222 - ----- Resource (2) Inferred Mineral 333 - ------ Resource 3 Mineable ore reserve and anticipated life of the mine: The mineable reserves and the life of the mine are calculated on the basis of reserves in Probable Category. (1) Reserves in Probable Category: 20482Tonnes (2) Reserves in proved category: 12602Tonnes (3) Total reserves – 33084Tonnes Next five year production- 12940Tonne Mine life- (33084-12940)/3582 = 5.62 + 5 years = 11.62 say 12years Blasting In case of blasting in underground, two types blasting patterns are followed, one is for blasting in openings having single free face and the other is one having two-three faces. Single free face blasting is called solid Blasting and than one free faces working do not require any pattern but an optimum spacing and burdens are definitely required. A typical drilling and blasting pattern proposed. Type of explosive to be used 32mm dia holes by rock-drill mounted on pusher Leg/air leg Explosive small dia Slurry or emulsion 80% strength, along with electric delay detonators Whether secondary blasting is needed:- Secondary blasting will not be needed. Storage of explosive:- Lessee having its own licensed explosive magazine and explosive van Precautions to be observed during and blasting:- A qualified blaster having blasters certificate will do blasting. Muffle blasting and wet drilling will be done to control flying rock particles to avoid effect of blasting on nearby fields Reclamation/Backfilling: During the conceptual period about 0.9861ha area will be backfilled using mine waste. 6 Raw Material Requirement: No raw material is required for the mining of Manganese ore 7 Recycling and Reuse During the conceptual period about 700tonne of sub-grade mineral will be generated. Presently two sub-grade dumps have been observed in lease area. During the conceptual period, dump ore working will be done. 8 Water source: There is no surface water course in the lease area. Electric System 4 The power requirement for the project will be met through DG set with capacity of 125 kva & MP State Electricity Board, which is available at near village. 9 Solid waste management: Presently as such 0.2ha area has been covered by 14000 m3 mine waste and overburden. 0.4266ha area has already been covered by sub-grade dump. During the conceptual period dump ore mining will be proposed and about 4100 m3 mineral will be sorting by old dump. During the next five year period about 80338 cum mine waste/ overburden will be generated and same will be used for backfilling purpose. 4 Site analysis i. Connectivity The applied area is approachable by all weather roads from Balaghat on Balaghat- Waraseoni – Katangi –Tumsar road, up to Garra chouki which is 66km from Balaghat.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us