Multi-County FFY 2020-2024

Multi-County FFY 2020-2024

** Mid Hudson South Transportation Coordinating Committee ** Wednesday, December 2, 2020 TIP Format Report for Selected Projects Page 1 of 42 Multi-County FFY 2020-2024 TIP AGENCY PROJECT DESCRIPTION TOTAL 5-YEAR PROGRAM (FFY) Starting October 01, PIN FUND SOURCES & 5-YEAR PHASE 2019 WORKTYPE PROGRAM <AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST in millions PRE 2020 2021 2022 2023 2024 FFY 2024 AQ CODE COUNTY TOTAL PROJECT COST of dollars FFY 2020 NYSDOT PEDESTRIAN SAFETY ACTION PLAN HSIP 05/2019 0.000 CONINSP 0.960 IMPLEMENTATION PHASE III - THE PROJECT WILL HSIP 05/2019 0.000 CONST 7.835 80PS01 IDENTIFY AND IMPROVE PEDESTRIAN SAFETY IN SAFETY URBAN AREAS AS DESCRIBED IN THE JUNE 20, 2016 <Exempt> NEW YORK STATE PEDESTRIAN SAFETY ACTION PLAN. 100% FEDERAL USING 10% TOLL CREDIT. AQC:A6 MULTI TPC: $7.5-$12 M TOTAL 5YR COST : 0.000 8.795 0.000 0.000 0.000 0.000 0.000 0.000 NYSDOT I684 INTERCHANGE STUDY EXIT 5 TO EXIT 10 AND STBG FLEX 10/2018 0.000 SCOPING 0.449 FROM I684 TO CONNECTICUT STATE LINE: I684 AND SDF 10/2018 0.000 SCOPING 0.112 811359 SMRP INTERCHANGE, I684 AND ROUTE 35 STUDY INTERCHANGE, TOWN OF BEDFORD, WESTCHESTER <Exempt> COUNTY AND I684 AND I84 INTERCHANGE, TOWN OF SOUTHEAST, PUTNAM COUNTY. PROJECT WILL EXAMINE EXISTING TRAFFIC CONDITIONS AS WELL AS FUTURE NO-BUILD TRAFFIC CONDITIONS UNDER A RANGE OF ALTERNATIVE TRANSPORTATION IMPROVEMENTS. T/BEDFORD AQC:C3 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.000 0.561 0.000 0.000 0.000 0.000 0.000 0.000 NYSDOT PREVENTIVE MAINTENANCE INITIATIVE PAVING: NHPP 05/2019 0.000 CONINSP 0.920 TACONIC STATE PARKWAY: WESTCHESTER CO LINE SDF 05/2019 0.000 CONINSP 0.230 812745 TO PUDDING ST, TOWNS OF CARMEL AND PUTNAM NHPP 05/2019 0.000 CONST 7.280 R&P VALLEY, PUTNAM COUNTY. SDF 05/2019 0.000 CONST 1.820 <Exempt> AQC:A10 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 0.000 10.250 0.000 0.000 0.000 0.000 0.000 0.000 NYSDOT PMI PAVING: ROUTES 303 AND 17: PROJECT WILL STBG FLEX 12/2019 0.408 CONINSP 0.408 REPAVE AND INCLUDE PEDESTRIAN SDF 12/2019 0.102 CONINSP 0.102 850223 IMPROVEMENTS AS WARRANTED ALONG ROUTE STBG FLEX 12/2019 4.080 CONST 4.080 R&P 303, FROM THE NJ LINE TO RAIL TRAIL BRIDGE <Exempt> SDF 12/2019 1.020 CONST 1.020 UNDERPASS, IN THE TOWN OF ORANGETOWN, ROCKLAND COUNTY AND ROUTE 17 IN THE VILLAGE OF HARRIMAN IN THE TOWN OF MONROE AND THE VILLAGE OF WOODBURY IN THE TOWN OF WOODBURY AND THE TOWN OF TUXEDO IN ORANGE COUNTY. AQC:A10 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 5.610 0.000 5.610 0.000 0.000 0.000 0.000 0.000 ** Mid Hudson South Transportation Coordinating Committee ** Wednesday, December 2, 2020 TIP Format Report for Selected Projects Page 2 of 42 Multi-County FFY 2020-2024 TIP AGENCY PROJECT DESCRIPTION TOTAL 5-YEAR PROGRAM (FFY) Starting October 01, PIN FUND SOURCES & 5-YEAR PHASE 2019 WORKTYPE PROGRAM <AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST in millions PRE 2020 2021 2022 2023 2024 FFY 2024 AQ CODE COUNTY TOTAL PROJECT COST of dollars FFY 2020 NYSTA NYS THRUWAY, PAVEMENT STRIPING 2019 ON 1-87, TWY 01/2020 0.060 CONST 0.060 I-287, AND 1-95 IN WESTCHESTER, ROCKLAND, AND NHPP 01/2020 0.560 CONST 0.560 872069 ORANGE, AND BRONX COUNTIES. WORK IN TWY 01/2020 0.140 CONST 0.140 SAFETY ORANGE COUNTY IS NON-FEDERAL ($0.060M <Exempt> OVERMATCH IS FOR WORK IN ORAGNE COUNTY). PROJECT DOES NOT COUNT AGAINST REGIONAL TARGET. (MHS17-35) AQC:A11 MULTI TPC: $0.6-$1.5 M TOTAL 5YR COST : 0.760 0.000 0.760 0.000 0.000 0.000 0.000 0.000 NYSTA NYS THRUWAY, NEW YORK DIVISION. PAVEMENT NHPP 09/2020 0.640 MISC 0.640 STRIPING 2020 THROUGH 2022 ON I-87, I-287, AND I-95 SDF 09/2020 0.160 MISC 0.160 872071 IN WESTCHESTER, ROCKLAND, ORANGE AND NHPP 09/2021 0.672 MISC 0.672 SAFETY BRONX COUNTIES. <Exempt> SDF 09/2021 0.168 MISC 0.168 NHPP 09/2022 0.640 MISC 0.640 SDF 09/2022 0.160 MISC 0.160 AQC:A11 MULTI TPC: $2-$4 M TOTAL 5YR COST : 2.440 0.000 0.800 0.840 0.800 0.000 0.000 0.000 LOCAL HARRIMAN-BEAR MOUNTAIN TRAILS REC TRAILS 01/2019 0.000 DETLDES 0.002 IMPROVEMENT PROJECT. THE NEW YORK-NEW OTHER 01/2019 0.000 DETLDES 0.001 876201 JERSEY TRAIL CONFERENCE WILL BUILD AND REC TRAILS 10/2018 0.000 PRELDES 0.001 MISC REHABILITATE ERODED AND WORN SECTIONS OF OTHER 10/2018 0.000 PRELDES 0.001 <Exempt> THE RAMAPO-DUNDERBERG TRAIL AND KAKIAT, REC TRAILS 09/2020 0.154 CONST 0.154 TRIANGLE, AND TUXEDO-MT. IVY TRAILS IN BEAR OTHER 09/2020 0.038 CONST 0.038 MOUNTAIN AND HARRIMAN STATE PARKS IN ORANGE AND ROCKLAND COUNTIES. THESE TRAILS INTERSECT WITH EACH OTHER AND CONNECT WITH LONG-DISTANCE TRAIL SYSTEMS, INCLUDING THE APPALACHIAN TRAIL, THE LONG PATH, THE 150-MILE HIGHLANDS TRAIL, AND THE ROUTE OF THE NEW EMPIRE STATE TRAIL. OPRHP PROJECT NUMBER 176007. AQC:A2 MULTI TPC: < $0.75 M TOTAL 5YR COST : 0.192 0.005 0.192 0.000 0.000 0.000 0.000 0.000 NYSDOT GUIDERAIL REPLACEMENT: PROJECT WILL REPLACE STBG FLEX 04/2022 0.040 DETLDES 0.040 OR REPAIR DEFICIENT OR OBSOLETE GUIDERAIL SDF 04/2022 0.010 DETLDES 0.010 880935 ALONG FEDERAL AID ELIGIBLE STATE HIGHWAYS IN NHPP 02/2023 0.160 CONINSP 0.160 SAFETY COLUMBIA, DUTCHESS, ORANGE, PUTNAM, SDF 02/2023 0.040 CONINSP 0.040 <Exempt> ROCKLAND, ULSTER AND WESTCHESTER COUNTIES. NHPP 02/2023 1.600 CONST 1.600 SDF 02/2023 0.400 CONST 0.400 STBG FLEX 02/2023 0.080 CONINSP 0.080 SDF 02/2023 0.020 CONINSP 0.020 STBG FLEX 02/2023 0.800 CONST 0.800 SDF 02/2023 0.200 CONST 0.200 AQC:A11 MULTI TPC: $2-$4 M TOTAL 5YR COST : 3.350 0.000 0.000 0.000 0.050 3.300 0.000 0.000 ** Mid Hudson South Transportation Coordinating Committee ** Wednesday, December 2, 2020 TIP Format Report for Selected Projects Page 3 of 42 Multi-County FFY 2020-2024 TIP AGENCY PROJECT DESCRIPTION TOTAL 5-YEAR PROGRAM (FFY) Starting October 01, PIN FUND SOURCES & 5-YEAR PHASE 2019 WORKTYPE PROGRAM <AQ STATUS> OBLIGATION DATE FFY FFY FFY FFY FFY POST in millions PRE 2020 2021 2022 2023 2024 FFY 2024 AQ CODE COUNTY TOTAL PROJECT COST of dollars FFY 2020 NYSDOT HIGHWAY EMERGENCY LOCAL PATROL (HELP) NHPP 01/2019 0.000 MISC 3.200 FREEWAY INCIDENT MANAGEMENT. PROJECT SDF 01/2019 0.000 MISC 0.800 881033 INCLUDES PAY FOR THE CONTRACT OPERATORS, NHPP 01/2020 3.200 MISC 3.200 MOBIL THE TRUCKS, ALL EQUIPMENT ON BOARD, <Exempt> SDF 01/2020 0.800 MISC 0.800 GASOLINE, AND OTHER OPERATIONAL NEEDS AT VARIOUS LOCATIONS IN THE HUDSON VALLEY. AQC:A6 MULTI TPC: $9.5-15.5 M TOTAL 5YR COST : 4.000 4.000 4.000 0.000 0.000 0.000 0.000 0.000 NYSDOT SIGNAL IMPROVEMENTS INSTALL TRAFFIC SIGNALS STBG FLEX 04/2019 0.000 DETLDES 0.400 &/OR UPGRADE/MODIFY EXISTING SIGNALS SDF 04/2019 0.000 DETLDES 0.100 881204 THROUGHOUT VARIOUS MUNICIPALITIES ON STBG FLEX 04/2019 0.000 ROWACQU 0.693 TRAFFIC VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS SDF 04/2019 0.000 ROWACQU 0.173 <Exempt> IN THE COUNTIES OF DUTCHESS, ULSTER AND STBG FLEX 02/2019 0.000 ROWINCD 0.083 WESTCHESTER. THE WORK WILL ALSO INCLUDE SDF 02/2019 0.000 ROWINCD 0.021 UPDATING SIDEWALKS AND CURB RAMPS TO ADA STBG FLEX 04/2021 0.136 CONINSP 0.136 STANDARDS WHERE APPLICABLE. SDF 04/2021 0.034 CONINSP 0.034 STBG FLEX 04/2021 0.904 CONST 0.904 SDF 04/2021 0.226 CONST 0.226 STBG LG URB 04/2021 0.344 CONINSP 0.344 SDF 04/2021 0.086 CONINSP 0.086 STBG LG URB 04/2021 2.296 CONST 2.296 SDF 04/2021 0.574 CONST 0.574 AQC:D2 MULTI TPC: $4.6-$7.5 M TOTAL 5YR COST : 4.600 1.470 0.000 4.600 0.000 0.000 0.000 0.000 NYSDOT BRIDGE PAINTING: PROJECT WILL CONSIST OF NHPP 10/2018 0.000 CONINSP 0.400 PAINTING STEEL SURFACES ON BRIDGES TO SDF 10/2018 0.000 CONINSP 0.100 881316 PROTECT AGAINST NORMAL ENVIRONMENTAL NHPP 10/2018 0.000 CONST 4.000 BRIDGE EFFECTS OF CORROSION, ACID RAIN, & DEICING SDF 10/2018 0.000 CONST 1.000 <Exempt> AGENTS. BINS 1025160; 1037210; 1016810; 1027600; STBG FLEX 10/2018 0.000 CONINSP 0.148 1029040; 1041350; 1053080; 5501650 IN COLUMBIA, SDF 10/2018 0.000 CONINSP 0.037 DUTCHESS, ROCKLAND, ULSTER & WESTCHESTER STBG FLEX 10/2018 0.000 CONST 1.483 COUNTIES (FORMERLY PIN: 8T0628) SDF 10/2018 0.000 CONST 0.371 AQC:A19 MULTI TPC: $6-$9.4 M TOTAL 5YR COST : 0.000 7.539 0.000 0.000 0.000 0.000 0.000 0.000 NYSDOT GUIDERAIL REPLACEMENT: THIS PROJECT WILL STBG FLEX 01/2019 0.000 CONINSP 0.160 REPLACE DAMAGED OR NON-FUNCTIONAL SDF 01/2019 0.000 CONINSP 0.040 881330 GUIDERAIL AND BRIDGE RAIL ON STATE HIGHWAYS STBG FLEX 01/2019 0.000 CONST 1.600 SAFETY IN VARIOUS MUNICIPALITIES THROUGHOUT THE SDF 01/2019 0.000 CONST 0.400 <Exempt> COUNTIES OF ROCKLAND, PUTNAM AND WESTCHESTER.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    42 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us