Little Hills Expressway & Mel Wetter Roundabout

Little Hills Expressway & Mel Wetter Roundabout

Little Hills Expressway & Mel Wetter Roundabout Sponsor Saint Charles Project No. RB18-000008 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $2,000,000 $500,000 $500,000 $1,000,000 Project Description The Mel Wetter and MO 370 Interchange Study has identified the intersection of Mel Wetter Parkway and Little Hills Expressway to have significant traffic delays and experiencing an increase traffic volume due to new developments. A recent traffic impact study prepared for the Villages of Provence, a new residential development on Mel Wetter Parkway south of MO-370, forecasts increasing traffic volumes that will warrant intersection improvements at Mel Wetter Parkway and Little Hills Expressway. Multiple conceptual layouts were developed during the Mel Wetter and MO 370 Interchange Study with County and MoDOT participation. After a detail evaluation, Alternative A with a roundabout at Mel Wetter Parkway and Little Hills Expressway was the preferred alternative. Summary of Alternative A: Expand the MO-370 interchange at Route 94 to include access to Mel Wetter Parkway through the addition of a collector distributor (C-D) road system; redesign the intersection at Mel Wetter Parkway and Little Hills Expressway with a roundabout; new signalized intersection on Mel Wetter Parkway with the south C-D road. The City of Saint Charles is requested County funds for the design and construction of the roundabout at Mel Wetter Parkway and Little Hill Expressway. The roundabout will be constructed within existing City Right-of-Way. The roundabout will be designed and constructed to accommodate future MO 370 ramps and connection to the north collector distributor C-D road. The City of Saint Charles will be applying for Federal CMAQ Funds for the roundabout. The funding, design, and construction of the C-D roadway system, additional ramps, and interchange improvements will be further discussed with MoDOT and will be a future project. The new roundabout will improve traffic flow, safety, and reduce emissions at the intersection. The roundabout will be designed to accommodate the forecasted 2040 traffic volumes and improve the overall level of service at the intersection. According to the FHWA Office of Safety, roundabouts are a Proven Safety Countermeasure because of their ability to substantially reduce the types of crashes that result in injury or loss of life. Roundabouts are designed to improve safety for all users, including pedestrians and bicyclists, by reducing speed of traffic and reducing the angle of conflict. FUNDING FOR IMPROVEMENTS - Little Hills Expy & Mel Wetter Pkwy Roundabout County Sponsor Federal Other Total Design $80,000.00 $80,000.00 $160,000.00 $0.00 $320,000.00 Utility Relocations $5,000.00 $5,000.00 $10,000.00 $0.00 $20,000.00 Right-of-Way $0.00 $0.00 $0.00 $0.00 $0.00 Construction $415,000.00 $415,000.00 $830,000.00 $0.00 $1,660,000.00 TOTAL $500,000.00 $500,000.00 $1,000,000.00 $0.00 $2,000,000.00 PERCENT (%) 25.00% 25.00% 50.00% 0.00% 100.00% FINANCIAL PLAN Design County Sponsor Federal Other Total 2019 $80,000.00 $80,000.00 $160,000.00 $320,000.00 2020 $0.00 2021 $0.00 Utility Relocations County Sponsor Federal Other Total 2019 $0.00 2020 $5,000.00 $5,000.00 $10,000.00 $20,000.00 2021 $0.00 Right-of-Way County Sponsor Federal Other Total 2019 $0.00 2020 $0.00 2021 $0.00 Construction County Sponsor Federal Other Total 2019 $0.00 2020 $415,000.00 $415,000.00 $830,000.00 $1,660,000.00 2021 $0.00 Estimate of Project Costs Project Sponsor: City of Saint Charles Project Title: Little Hills Expy and Mel Wetter Pkwy Roundabout Date: 5/30/2018 Specific Roadway Items Item Quantity Unit Unit Price Amount Concrete Pavement 6,400 SQYD $55.00 $352,000.00 Type 5 Aggregate Base 6,400 SQYD $10.00 $64,000.00 Concrete Curb and Gutter 3,300 LF $45.00 $148,500.00 Retaining Walls 5,200 SQFT $55.00 $286,000.00 Unclassified Excavation 4,000 CUYD $35.00 $140,000.00 Striping/Pavement Markings 1 LUMP SUM $20,000.00 $20,000.00 Signing 750 SQFT $40.00 $30,000.00 Removal of Improvements 1 LUMP SUM $30,000.00 $30,000.00 Mobilization 1 LUMP SUM $60,000.00 $60,000.00 Traffic Control 1 LUMP SUM $20,000.00 $20,000.00 SUBTOTAL $1,150,500.00 Specific Bicycle Items Item Quantity Unit Unit Price Amount Bike Trail - Shared Use Path 800 SY $55.00 $44,000.00 ADA Ramps 2 EACH $5,000.00 $10,000.00 SUBTOTAL $54,000.00 Specific Pedestrian Items Item Quantity Unit Unit Price Amount $0.00 SUBTOTAL $0.00 Specific Transit Items Item Quantity Unit Unit Price Amount $0.00 SUBTOTAL $0.00 Miscellaneous Other Items Item Quantity Unit Unit Price Amount Lighting 6 EA $10,000.00 $60,000.00 Utility Relocations 1 LUMP SUM $20,000.00 $20,000.00 Erosion Control & SWPPP 1 LUMP SUM $40,000.00 $40,000.00 SUBTOTAL $120,000.00 Construction Cost Total $1,324,500.00 Contingency $255,500.00 Inflation $80,000.00 Preliminary Engineering $320,000.00 Right-of-Way $0.00 Construction Engineering/Inspection $20,000.00 Project Total $2,000,000.00 Little Hills & Mel Wetter Roundabout - 30 May 2018 18 Task Name Planned Start Date Planned Finish Date Planned Duration Q3 '18 1 Planning 10/1/2018 2/22/2019 105 days 2 Prepare and Approve Project Charter 10/1/2018 10/26/2018 20 days 3 EOIs and Short-List 10/29/2018 11/9/2018 10 days 11/9/2018 4 RFPs and reviews 11/12/2018 12/7/2018 20 days 5 Consultant Selection with Council Notice 12/10/2018 12/21/2018 10 days 12/21/2018 6 Scope and negotiate contract 12/24/2018 1/4/2019 10 days 7 Board/Council: Contract final approval and signatures 1/7/2019 2/15/2019 30 days 2/15/2019 8 Design Notice to Proceed and Kick-Off Mtg 2/18/2019 2/22/2019 5 days 2/22/2019 9 Design 2/25/2019 1/12/2021 492 days 10 Data Sharing 2/25/2019 3/1/2019 5 days 11 Site Assessment 2/25/2019 3/1/2019 5 days 12 Project Management Plan (PMP) 2/25/2019 3/1/2019 5 days 13 Alternatives Analysis - Concept Plans 3/4/2019 3/29/2019 20 days 3/29/2019 14 AA and Concept Plan Review 4/1/2019 4/12/2019 10 days 4/12/2019 15 Board/Committee Concept Approval 4/15/2019 4/26/2019 10 days 4/26/2019 16 Survey 4/29/2019 6/28/2019 45 days 17 Title Reports 4/29/2019 5/17/2019 15 days 18 Survey Notice 4/29/2019 5/3/2019 5 days 5/3/2019 19 Field Survey and Submittal 5/6/2019 6/14/2019 30 days 20 Survey Review 6/17/2019 6/21/2019 5 days 21 Survey Approval 6/24/2019 6/28/2019 5 days 6/28/2019 22 Preliminary Plans 7/1/2019 10/18/2019 80 days 23 Preliminary Plan Design 7/1/2019 9/19/2019 59 days 9/19/2019 24 Preliminary Plan Submittal 9/20/2019 9/20/2019 1 day 9/20/2019 25 Preliminary Plan Review 9/23/2019 9/27/2019 5 days 26 Field Check #1 9/23/2019 9/27/2019 5 days 9/27/2019 27 Preliminary Plan Approval 10/15/2019 10/18/2019 4 days 10/18/2019 28 Final PS&E 10/21/2019 6/26/2020 180 days 29 Pre-Final PS&E Design 10/21/2019 1/10/2020 60 days 1/10/2020 30 Pre-Final PS&E Review(s) 1/13/2020 2/28/2020 35 days 31 Pre-Final PS&E QA/QC Check 1/13/2020 2/21/2020 30 days 32 Field Check #2 2/24/2020 2/28/2020 5 days 2/28/2020 33 PS&E Adjustments (Utility/ROW) and submittals 4/21/2020 6/1/2020 30 days 34 Field Check #3 6/2/2020 6/2/2020 1 day 6/2/2020 35 Final PS&E Review and Approval 6/2/2020 6/26/2020 19 days 6/26/2020 36 PS&E and ROW Package Prep 6/29/2020 7/3/2020 5 days 7/3/2020 37 Design Buffer 9/7/2020 11/27/2020 60 days 38 Bidding 11/30/2020 1/12/2021 32 days 1/12/2021 39 Utility Coordination 6/17/2019 7/23/2020 289 days 40 Utility Survey Location Verification 6/17/2019 7/12/2019 20 days 41 Preliminary Utility Plan of Adjustment 9/24/2019 12/13/2019 59 days 42 Utility Agency Review of Project Preliminary Plans 9/24/2019 10/14/2019 15 days 43 Utility Coordination Meeting #1 10/15/2019 10/15/2019 1 day 10/15/2019 44 Preliminary Utility Plans of Adustment 10/16/2019 12/10/2019 40 days 45 Preliminary Utility Plan of Adjustment Review and Approval 12/11/2019 12/13/2019 3 days 12/13/2019 46 Utility Relocation Plans 12/19/2019 2/20/2020 46 days 47 Utility Relocation Plan Design 12/19/2019 2/12/2020 40 days 48 Utility Coordination Meeting #2 2/13/2020 2/13/2020 1 day 2/13/2020 49 Utility Relocation Plan Review and Approval 2/14/2020 2/20/2020 5 days 2/20/2020 50 Utility Relocation Agreements 2/21/2020 3/19/2020 20 days 3/19/2020 51 Relocation Scheduling 5/26/2020 5/28/2020 3 days 52 Utility Relocations 5/29/2020 7/23/2020 40 days 7/23/2020 53 Construction 1/13/2021 10/5/2022 451 days 54 Capability, Experience, Reference, Bid, and Schedule Checks 1/13/2021 1/19/2021 5 days 55 Council Approval of Construction Contract 1/20/2021 3/2/2021 30 days 3/2/2021 56 Construction Contract Documents 3/3/2021 3/16/2021 10 days 57 Preconstruction Meeting and NTP 3/17/2021 3/17/2021 1 day 3/17/2021 58 Contractor Tasks/Schedule 3/25/2021 5/18/2022 300 days 59 Construction Buffer 5/19/2022 8/24/2022 70 days 60 Substantial Completion 8/25/2022 8/25/2022 1 day 8/25/2022 61 Final Completion 8/25/2022 10/5/2022 30 days 62 Project Closeout 10/6/2022 11/23/2022 35 days 63 Final Submittals 10/6/2022 10/19/2022 10 days 64 Final Payment and Retainage Release 10/27/2022 11/9/2022 10 days 11/9/2022 65 Asset Management Updates and O&M Requirements 10/20/2022 10/24/2022 3 days 66 File Review and Closeout 11/10/2022 11/23/2022 10 days 67 Variable Project Phases 10/1/2018 10/26/2022 1063 days 68 Permitting 9/24/2019 4/20/2020 150 days 69 Community Relations 9/24/2019 3/24/2021 392 days 70 Public Meeting Prep 9/24/2019 9/30/2019 5 days Jeremy Lutgen 71 Public Meeting - Preliminary Plans 10/1/2019 10/1/2019 1 day 10/1/2019 72 Public Meeting Feedback and Eval 10/2/2019 10/8/2019 5 days Jeremy Lutgen 73 Construction Notice (CMBs/Door Hangers/Other)

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    256 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us