PLM-Software Implementation with High Level of Implementation with High Level of Complexity

PLM-Software Implementation with High Level of Implementation with High Level of Complexity

THE CODE OF PLM OPENNESS FROM COMMITMENT TO PRACTICAL APPLICATION. Dr. Markus Fricke Dr. Dietmar Trippner BMW Group IT IT Systems Research & Development AGENDA. Current status @ BMW Group and in the initiative "Connected Engineering" CPO: Overview and motivation @ BMW Group Using CPO to support Connected Engineering objectives CPO@ Bosch, Continental, Daimler and Volkswagen Thema | Abteilung | Datum Seite 2 AGENDA. Current status @ BMW Group and in the initiative "Connected Engineering" CPO: Overview and motivation @ BMW Group Using CPO to support Connected Engineering objectives CPO @ AVL, Bosch, Conti, Daimler, Schaeffler and VW Thema | Abteilung | Datum Seite 3 VUCA – THE NEW NORMAL. V U C A Volatile Unpredictable Complex Ambiguous Thema | Abteilung | Datum Seite 4 Thema | Abteilung | Datum Seite 5 THE BMW GROUP IT ORGANIZED IN A WORLDWIDE NETWORK. 60 Nationalities in 29 Countries BMW GROUP IT. form the global BMW Group IT network in headquarters, in markets, in 5.500 employees shared service centers and in innovation locations (tech offices). 230 products and a complete product orientation BMW Group IT Europe optimize existing business processes and enable new business areas. Tech Office BMW Group IT Silicon Valley Americas BBA IT (Joint Venture) SSC PORT. Shared Service CTW 694 Locations Center USA (Joint Venture) Tech Office Asia (Sales cooperation, offices, …) are connected through the global network BMW Group IT infrastructure. APAC SAP Shared ~ 12,200,000 Vehicles Service Center ZA are connected with the BMW Group ConnectedDrive Backend. ~ 1,000,000,000 Requests to the BMW Group backend through ConnectedDrive are processed daily. Thema | Abteilung | Datum Seite 6 OUR ANSWER: FOCUSED IT STRATEGY AND 100% AGILE. DIGITALIZATION IT IN THE (ltO,OtO,OtD,DtCC, BM/RM) PRODUCT & IN BUSINESS SERVICES INNOVATION BMW GROUP IT Strategy 100% AGILE #enjoyIT From plan-driven to value-driven CUSTOMER-CENTRIC PEOPLE & software development IT SERVICE-DELIVERY CULTURE WATERFALL FLEXIBILITY & SPEED Thema | Abteilung | Datum Seite 7 100% AGILE IS NOT A BUZZ WORD FOR US. IT’S A HOLISTIC JOURNEY ALONG 4 CORE DIMENSIONS. PROCESS TECHNOLOGY STRUCTURE 100 % AGILE CULTURE Thema | Abteilung | Datum Seite 8 ACHIEVEMENTS THROUGH 100% AGILE IN VARIOUS DIMENSIONS SO FAR. Hybrid environment (Creative & Dynamic) with little restrictions to other systems and loads of requirements that need to be fulfilled in a short period of time Custom Software PLM-Software implementation with high level of implementation with high level of complexity complexity for a huge number of TECHNOLOGY and interfaces to several core systems for a worldwide users huge number of users Standard Software with deep integration and high operations / usability impact Thema | Abteilung | Datum Seite 9 CONNECTED ENGINEERING: FROM AGILE IT TO AGILE ENTERPRISE. From V to I → Continuous, agile & virtual engineering Erfahrungswissen Signifikante Reduktion der HW-Absicherung Techn. Innovation HW Produkt Datenbackbone Knowledge Stream Anforderung Akt. Modell → Enterprise backbone to strenghten virtual, collaborative engineering Kontinuierliche Gesamtfzg / Partner virtuelle Außenhaut Absicherung Kontinuierliche digitale Kollaboration In der virtuellen Welt HMI System Client Kunde Komponente Services Gesetze Hologram configuration virtual car geometric validation … Globale Entwicklung functional validation … Virtual Product Experience → Handshake between engineer and AI Artificial Intelligence Knowledge Stream Targets & Modules Type codes logical service backbone Requirements GeoTDM E/E Knowledge Mgmt Geometry Function Cost / Financials Production planning … Thema | Abteilung | Datum Seite 10 AGENDA. Current status @ BMW Group and in the initiative "Connected Engineering" CPO: Overview and motivation @ BMW Group Using CPO to support Connected Engineering objectives CPO@ Bosch, Continental, Daimler and Volkswagen Thema | Abteilung | Datum Seite 11 CPO@BMW GROUP. BMW GROUP’S ROLE WITHIN THE PROSTEP ASSOCIATION. BMW Group demonstrates a long–term dedication in insisting on open PLM systems and supporting the development of PLM standards. − As a founding member of the prostep association, BMW Group actively drives PLM standardization since >35 years − BMW Group continues its engagement with prostep in current topics, e.g. SSB CeBIT 2012: Approval of the − An open PLM architecture is a visible key element of BMW Group’s PLM strategy CPO v1.0 by BMW Group CIO K. Probst (Photo:automotive Day 2012) − BMW Group initiated the CPO in 2012 and was the first enterprise to sign the CPO 1991: BMW Group initiates the ProSTEP project Prostep iViP Symposium 2018: CIO K. Straub underlines importance of CPO for beeing agile. Thema | Abteilung | Datum Seite 12 CPO@BMW GROUP. VALUE POTENTIAL. The CPO value potential has been confirmed in various initiatives at BMW Group: Optimization of business applications: − Best-in-class solutions regarding both functionality and TCO − Speed and flexibility for process optimizations IT cost reduction for: − Integration of new applications/systems − Releases, respectively version or system changes − Maintenance and operations Better collaboration between vendors, integrators and users: − Common understanding und terminology regarding PLM openness − Rules and agreements realization and adherence to openness Thema | Abteilung | Datum Seite 13 AGENDA. Current status @ BMW Group and in the initiative "Connected Engineering" CPO: Overview and motivation @ BMW Group Using CPO to support Connected Engineering objectives CPO@ Bosch, Continental, Daimler and Volkswagen Thema | Abteilung | Datum Seite 14 USING CPO TO SUPPORT CONNECTED ENGINEERING. Services Hologram configuration virtual car geometric Focus of the initiative validation … functional „Connected Engineering“ validation … Engineering Künstliche Intelligenz − Flexible engineering structures − Geometry and function combined Informationsdurchgängigkeit − Enabler for agile collaboration PDM Wissensmagagement Geometric Geom. Functional Hardware − Master data Development Integration Development Verification − E-BOM Logistics / Production View − M-BOM … … Codex of PLM Openness: Base for cross-domain and cross-solution consistency Thema | Abteilung | Datum Seite 15 CPO IS A PREREQUISITE FOR ALL DATA MANAGEMENT SOLUTIONS IN THE CONTEXT OF CONNECTED ENGINEERING. Services Hologram configuration virtual car geometric validation … functional validation … Engineering Künstliche Intelligenz − Flexible engineering structures − Geometry and function combined − Enabler for agile collaboration Informationsdurchgängigkeit CPO has been established as prerequisite for standard softwareWissensmagagement and hybrid scenarios. Geometric Geom. Functional Hardware Development Integration Development Verification … … Initial strategy phase: Strategic guidelines for Data layer - Clear strategic vision - Process development - business / IT - Scoping, approach, setup - Technical development information model - Top mgmt commitment (geom. & funct. development) Thema | Abteilung | Datum Seite 16 MANIFESTATION OF CPO ADHERENCE IN GUIDELINES, APPROACH AND ORGANIZATION. Manifestation of the CPO BMW Group Target in vendor selection BMW Group approach for standard software and solution design Prerequisite Level of Openness Ongoing evaluation (KPI) and 3 predefined actions in case of deviations CPO has been established as prerequisite for standard software and hybrid scenarios. Bilateral contractual obligation to 2 openness Signed CPO / Initial strategy phase: Strategic guidelines for Data layer 1 certified Vendor - Clear strategic vision - Process development - business / IT - Scoping, approach, setup - Technical development information model - Top mgmt commitment (geom. & funct. development) Thema | Abteilung | Datum Seite 17 CPO@BMW GROUP. Thema | Abteilung | Datum Seite 18 AGENDA. Current status @ BMW Group and in the initiative "Connected Engineering" CPO: Overview and motivation @ BMW Group Using CPO to support Connected Engineering objectives CPO@ Bosch, Continental, Daimler and Volkswagen Thema | Abteilung | Datum Seite 19 FROM COMMITMENT TO PRACTICAL APPLICATION 80 Committed CPO-Partners – but how does the practical application look like ? IT Customers IT Vendors IT Service Provider ▪ Adient ▪ Mazda Motor ▪ Actano ▪ IBM ▪ Atos ▪ Airbus ▪ Mitsubishi Motors ▪ Aras ▪ IPG Automotive ▪ CADFEM ▪ Altran ▪ Nissan Motor ▪ Autodesk ▪ ISD ▪ :em ▪ BMW ▪ Porsche ▪ AVL List ▪ Kronion ▪ enso managers ▪ Bosch ▪ Schaeffler ▪ BETA CAE Systems ▪ MathWorks ▪ InMediasP ▪ Continental ▪ Siemens ▪ BOS ▪ Mentor Graphics ▪ iqs Software ▪ Daimler ▪ SMP Group ▪ Cideon ▪ Modelon AB ▪ M.E.B. ▪ Dräxlmaier ▪ Suzuki Motor ▪ CONTACT Software ▪ Müller-BBM ▪ MetaRatio ▪ EDAG ▪ thyssenkrupp ▪ CONWEAVER ▪ Noesis Solutions ▪ NTT Data ▪ Ford ▪ Toyota Motors ▪ Dassault Systèmes ▪ PROSTEP ▪ Seeburger ▪ Fuji Heavy Industries ▪ Volkswagen ▪ dSPACE ▪ PTC ▪ SSC-Services ▪ Hino Motors ▪ Volvo AB ▪ ECS ▪ Rocket Software ▪ T-Systems ▪ Honda R&D ▪ Yamaha ▪ Elysium ▪ SAP ▪ xPLM ▪ Isuzu Motors ▪ Yazaki ▪ ESI ITI ▪ Siemens PLM ▪ Küster ▪ ZF Friedrichshafen ▪ Eurostep ▪ TechniaTranscat ▪ Gamma Technology ▪ Theorem ▪ HCL Thema | Abteilung | Datum Seite 20 FROM COMMITMENT TO PRACTICAL APPLICATION An initiative of the prostep ivip association Practical application of users Certified vendors presented at the presented at the prostep ivip symposium 2019 prostep ivip symposium 2018 Thema | Abteilung | Datum Seite 21 CPO@WORK Strategic fields of action using CPO in business Thema | Abteilung | Datum Seite 22

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    52 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us