FORM – 1 I Basic Information

FORM – 1 I Basic Information

FORM – 1 I Basic Information S. Item : Details No. 1. Name of the Project : Quarry project of Mr. Sainudheen C. K 2. S. No. in the schedule : 1(a) As per O.M No. L-11011/47/2011-IA.II (M) Dated 18.05.2012 3. Proposed capacity/ area/ : length/ tonnage to be Proposed 25,000 MTA handled /command area/ Capacity lease area /number of wells to be drilled Area 0.9460 hectare 4. New / Expansion / : Expansion Modernization 5. Existing capacity/ Area : It is aexisting project. etc. 6. Category of project i.e. : “B” further categorized as B2 since lease area is 'A' or 'B' <10Ha. As per SEIAA guidelines 7. Does it attract the general : No condition? If yes, please specify. 8. Does it attract the No specific condition? If yes, please specify. 9. Location : The proposed building stone quarry project is situated atSurvey No202/2 of Elankur Village, ErnadTaluk, MalappuramDist. Kerala with an extent area of 0.9460 hectares. The geographical location of the mine with respect to the pillar boundary of the lease area is given below: - 1 Latitude (N) 11°8‟12.60"N to 11°8'16.49"N Longitude(E) 76° 10„25.33"E to 76° 10„29.21"E Plot/ Survey/ Khasra no. : Survey No. 202/2 Village : Elankur Tehsil : Taluk – Ernad District : Malappuram State : Kerala 10. Nearest Railway station/ : Particulars Name Distance Airport along with (From lease) distance in kms. Railway Station Vaniyambalam 20 km, Airport Calicut International 32 km, Airport 11. Nearest Town, City, : Particulars Name Distance, District Headquarters (From lease) along with distance in Nearest Manjeri 12 km, kms. Town Manjeri 12 km, Nearest City 12. Village Panchayat, : Particulars Name Postal Address ZillaParishad, Municipal Villager Officer Corporation, Local body Village Mankada Elankur Village, Elankur (Complete postal address P.O, Malappuram, Kerala with telephone no. to be 676122 Ph No: - 085476 15812 given). 2 PanchayatSecretary Panchayat Trikkalan TrikkalangodeGramaPa gode nchayat Office, Trikkalangode P.O, Malappuram, Kerala 676127. Ph No: - 0483 2760035. 13. Name of the applicant : Mr. Sainudheen C. K 14. Registered address : YESCO GRANITES LLP, Room No.29/162-A, J&J Tower, Muttippadi, Alathurpadi, Melmuri P.O, Malappuram District, Kerala 15. Address for correspondence Name : Mr. Sainudheen C. K Designation (Owner / : Designated Partner Partner / CEO) Address : YESCO GRANITES LLP, Room No.29/162-A, J&J Tower, Muttippadi, Alathurpadi, Melmuri P.O, Malappuram District, Kerala Pin Code : E-mail : [email protected] Telephone no. : 9846503504 Fax No. : Nil 16. Details of alternative : This is aexisting mine. The proposed project is sites examined, if any. mineral specific; hence no alternate site was Location of these sites examined. should be shown on a Toposheet. 3 17. Interlinked projects : crusher located outside the permit area. 18. Whether separate : application of interlinked No, for crusher unit no Environment Clearance is project has been required. submitted? 19. If yes, date of submission : Not applicable 20. If no, reason : Not applicable 21. Whether the proposal : involves approval / Clearance under: if yes, details of the same and their status to be given. Not Applicable (a) The Forest (Conservation) Act, (1980)? Not Applicable (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Not Applicable Notification, 1991? 22. Whether there is any : The following Govt. Orders / Policies are to be Government Order/Policy followed:- relevant/relating to the Kerala Minor Mineral Concession Rules, 2015 site: Mines Act, 1952 Explosive Rules, 2008 Kerala Panchayat Raj Act, 1994 Central Ground Water Authority Water Pollution (Prevention & Control) Act, 1974 Air Pollution (Prevention & Control) Act,1981 Environment Protection Act, 1986 EIA Notification, 2006 / 2009 The Kerala Promotion of Tree Growth in Non- Forest Areas (Amendment) Act, 2007. 23. Forest land involved : No (hectare) 4 24. Whether there is any : No litigation is pending against the lease area/ litigation pending against applicant of this lease area in any court of law to the project and/or land in the best of knowledge. which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project. 25. Expected cost of the : Rs 40 Lakhs project *Capacity corresponding to sectorial activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) II Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible) with source of information data 5 1.1 Permanent or temporary Yes Land use: - The land use classification change on land use, land as per revenue records is Private Patta cover or topography land. The mining activity will have including increase in localized impact and create physical intensity of land use (with change in the existing environment due respect to local land use to the change in the existing land use. plan) At the end of life of mine, the excavated pit will be backfilled and reclaimed and rehabilitated by plantation leaving no void. Topography and drainage: - The topography of the lease area is hilly. The highest elevation of the lease area is 110 m MSL and lowest is 90 m MSL. Vegetation: - Part of the proposed land is already under mining and there is no vegetation in that area. The remaining land in the proposed land is mostly covered with native trees, climbers, grass, shrubs, herbs etc. 1.2 Clearanceof existing land, Yes Part of the proposed land is already vegetation and buildings? under mining and there is no top soil or overburden in these areas. Further, proposed mining area has no vegetation as the land is barren with exposed rock. 1.3 Creation of new land uses? Yes The existing land use pattern will be as follows as per the different stages during the life of mine. S. Land Use Category Pre- Operational Post- No. Operational (Ha.) Operational (Ha.) (Ha.) 1 Top Soil Dump Nil 0.10 - 2 Over burden Nil (Outside) 3 Excavation - 0.5994(0.550ha 0.5994 Reclaimed by (Reclaimed by plantation) plantation) 4 Road 0.065 0.075 0.075 5 Built Up Area - - - 6 Drainage - - - 7 Green belt - 0.2716 0.2716 8 Undisturbed Area 0.881 0.000 - Total 0.9460 0.9460 0.9460 6 1.4 Pre-construction No Not applicable investigations e.g. bore holes, soil testing? 1.5 Construction works? No Facilities like site office, labour quarters, and magazine area are already available within the land owned by the project proponent but outside the proposed lease area. 1.6 Demolition works? No Not applicable 1.7 Temporary sites used for No Not applicable construction works or housing of construction workers? 1.8 Above ground buildings, Yes The proposed project activity involves structures orearthworks about 84% of the pit area for exploring including linear structures, building stone. At the end of life of cut andfill or excavations. mine, excavated pit will be backfilled and reclaimed and rehabilitated by plantation. It is est imated that around 7068c.u.m of topsoil will be generated from the propose pit, which will be properly stacked and will be utilized for plantation over the reclaimed areas.It is also estimated that around 4,544c.u.m . m OB will be generated which will be utilized in developing internal roads and at the end use the same will be used as soil base for reclamation. 1.9 Underground works No There will be no underground mining including mining or activities. tunneling? The mining will be done by open cast semi-mechanized method of mining. 1.10 Reclamation works? Yes The proposed project activity involves about 84% of the pit area for exploring 7 building stone. At the end of life of mine, excavated pit will be backfilled and reclaimed and rehabilitated by plantation. 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and Yes The mining will be done by open cast manufacturing processes? semi-mechanized method of mining. The bench height and width will be proposed 6 m. Drilling and blasting operation will be taken up suitably. Excavated material is transported to the crusher located within the complex for further processing. The ultimate depth of the mine workings is estimated to be 65 m MSL. 1.14 Facilities for storage of Yes The finished material i.e., aggregates/ goods or materials? sand will be stored in a stockyard within the land owned by the project proponent but outside the proposed lease area 1.15 Facilities for treatment or Yes Liquid Effluent disposal of solid waste or The sewage to a tune of 0.8 KLD liquid effluents? generated from the mine office will be diverted to the septic tank followed by soak pit. 1.16 Facilities for long term Labour quarters are available within the housing of operational Yes land owned by the project proponent but workers? outside the proposed lease area. 1.17 New road, rail or sea Yes For the purposes of mining activities, traffic during construction existing roads are sufficient. However, or operation? haul road will be suitably developed within the proposed area. 1.18 New road, rail, air Yes For the purposes of mining activities, waterborne or other existing roads are sufficient. However, 8 transport infrastructure haul road will be suitably developed including new or altered within the proposed area. routes and stations, ports, airports etc? 1.19 Closure or diversion of No Not Applicable existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not Applicable transmission lines or pipelines? 1.21 Impoundment, damming, Yes The run-off from the lease area will be culverting, realignment or suitably collected through channels and other changes to the will be stored in storm water pond for hydrology of watercourses further utilization in Mine/ Crusher/Sand or aquifers? manufacturing units.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us