Nature of Elements Book value Cost of t External Services Rs. Subsque Civil Rs. (A) nt Etc., S.No. Distric deduction © Addition Remarks Electrical Rs. 45B Wall Roof Door Total Floor No. No. of storey s Height of storey Name ofName Building / Subsidary Building subsequent additional / / subsequent additional Type of Foundation including cost of site(b) Original cost of building Occupying Department Total Rs. [a+b+c] and from the department. Dimension Plinth area in M2 Survey No., Door No., Village Windows and Ventilators Head of Account under which Rs. funds Allotted for Construction Lifts mers Cold Type of Building / Framed Load Bearing Water ents & Roads Supply Assumed standard Rent rule 45A / Year of Construction / Purchase/ transfer Storage Transfor Electrical Electrical Including Arrangem Ariyalur Deputy Collector's Cutchery 1873 1 180.65 Brick in Tiled SQ. brick in 881.57 2414 200 2614 - Revenue 1 Chunambu Chunambu Ariyalur Sub Jail @ Ariyalur 1873 1 171.45 BW in Tiled SQr. Brick in 723.75 1800 -- 1800 -- Police 2 Chunambu Chunambu Head Clerk & Record room 1911 1 494.99 --do--- Terraced Paralistones 1684.85 17957 270 18227 - --do-- (a) Latin for Deputy Collector 1912 1 20.13 Brick in Mud Tiled roof Paralistones 92.09 88 - 88 - --do-- (b) Latin for Office Establishment 1912 1 18.30 Brick in Mud Tiled roof Paralistones 82.38 310 - 310 - --do-- (c.) Well 1913 - 3.60 Brick in - - - 267 - 267 - --do-- (d) Chunambu (e) Compound wall 1913 - 683 FT BrickinMud - - - 3425 1277 4702 - --do-- Culvert 1913 - Vent 2' X 2' - 9" Brick in - Concrete - 125 - 125 - --do-- (f) Chunambu Summary office (Now used as Veterinary Hospital not - 81.77 Brick in Tiled. Brick in 272.60 1508 157 1665 - Vetrinary (g) known Chunambu Chunambu Hospital Shed for 6 SPCA animals 1938 1 32.15 Brick in Mud Flat and pan 12" Sqr. Paving 103.00 1022 - 1022 - ---do--- (h) and LM tiled tiles. Well 1940 - 6' dia Brick in Comb. - - - 256 - 256 - ---do--- (i) Mortar Dressing and operation shed Veterinary Hospital . 1940 1 97.03 Brick in CM Tiled Cut stone in CM 340.26 1455 - 1455 - ---do--- (j) Leaching cesspool Latin 1959- 1 2.23 --do-- RCC Cement 4.08 919 - 919 - ---do--- (k) 60 Ariyalur Village chavadi Now occupied by Veterinary Dept. for 1910 - Brick in Pan tiles Cement concrete - 2035 275 2310 - ---do--- 3 Bull's shed with store room . Chunambu Ryots shed -- 1 42.00 Brick in Tiles stone jelly 131.32 534 - 534 - Revenue (a) Chunambu concrete Value of land -- - 1.79 Acr - - - - 293 - 293 - Revenue (b) Divisional Panchayat office 1970 1 66.40 B.W RCC Cement 243 19000 - 19000 - Revenue (c.) Flush out Latrine , Urinals 1970 1 5.80 B.W RCC Cement 14.80 1700 - 1700 - Revenue (d) Ariyalur Sub Divisional Radio Station. In the station @ Ariyalur 1970 1 17.50 B.W RCC Ellis pattern 81.00 5568 - 5568 - Police Dept. 4 Police. Ariyalur Additional Building in Taluk office 1974 1 183.00 B.W RCC Ellis pattern 648.00 49807 - 49807 - Revenue 5 (a) Record room 1971 1 35.00 B.W RCC Cement over CC 122.00 13699 - 13699 - ---do-- (b) Additional Building in Taluk office 1971 1 183.00 B.W RCC Cement over CC - - - - - ---do-- Ariyalur Additional Taluk office Building 2005 2 241.50 B.W RCC G.F Kotta G.F- 825 40.00 - 40.00 Cons Revenue 6 FF- Kotta+ FF-795.3 ceramic Security wall (Sub Jail) 2007 47.20 RCC - 9.57 - 9.57 Cons Jail (a) -08 Ariyalur Sub Registrar office @ Ariyalur 1891 1 120.00 Brick in Tiled Brick in 600.61 3061 1207 4268 - Registration 7 Chunambu Chunambu & Asphalt Ariyalur Integrated Registration Ariyalur 2013-14 2 453.00 BW RCC Kotta, Vertified 1494.90 131.98 L 131.98 L Registration 8 453.00 1494.90 Ariyalur Tahsidar Managers office @ Ariyalur. Taken 1 123.42 Brick in Mud Tiled Cement flooring 376.43 6640.00 -21.00 6619.00 - Revenue 9 over by and Chunambu PWD'52 (a) Tiled shed infront ----do-- - 58.45 Brick in Mud Tiled Cement flooring 178.29 - - - - Revenue (b) Compound wall ----- ---- Ariyalur New Deputy Tahsidar office @ Ariyalur. 1917 1 897.76 Brick in CM Tiled Paralistones 3012.00 32629.00 1017.00 33646.00 - Revenue 10 Ryots shed 1917 - 77.50 Brick in CM Tiled Gravel - 1033.00 - 1033.00 - --- do-- (a) (b) Cook rooms 1917 - 26.48 Brick in CM Tiled Paralistones - 569.00 - 569.00 - --- do-- (c.) Latrine 1917 - 16.54 CI sheet CI Sheet Concrete - 451.00 - 451.00 - --- do-- Value of land - - - - - - - 195.00 195.00 - --- do-- (d) (e) Cycle shed 1980 1 52.06 Brick in CM RCC Granolithic 109.33 - - - - --- do-- 11 Ariyalur MLA office @ Ariyalur. / New 2000 1 71.00 BW in CM RCC sagapath stone - 4.85 L - 4.85 L Govt. Revenue Ariyalur Sub Magistrate Cutchary @ Keelapalur - now used as not 1 273.23 BW in Clay Tiled Concrete 819.70 1862.00 657.00 2519.00 - Registration 12 Sub Registrar office. known Sub Jail Kitchen used as Police station and lockup not 1 188.19 Brick in Tiled SQ. brick in 789.25 4500.00 - 4500.00 - - (a) known Chunambu Chunambu Latrine 1951 - 4.64 Brick in Open Cement 9.92 577.00 51.00 628.00 - - (b) Cement Value of land - - 39 Cent - - - - 113.00 - 113.00 - - (c.) (d) S.F No 1329 / 270B/Building . 1930 - 121.00 BW in LM Tiled Cement 322.75 7647.00 - 7647.00 - Registration (e) Flush out Latrine 1969 1 2.38 BW in CM RCC Cement 5.20 450.00 - 450.00 - - (f) Compound wall - ---- 45 RM BW in CM ----- ---- - 450.00 50.00 500.00 - - Value of land - - - - - - - 3363.00 - 3363.00 - - (g) Ariyalur Sub Registrar office @ Keelapalur - 2 12.00X15.30 Brick work RCC Ceramic 182.76 50.00 L - 50.00 L Con Regi. 13 12.00X15.30 182.76 Ariyalur Sub Registrar office @ 2016-17 1+1 150.00 Brick work RCC cuddapha 495.00 57.36 L 57.36 L Con Regi. 14 Vikiramangalam 150.00 Vetrified 495.00 Ariyalur Firka Surveyouor Office cum - 2 10.33X7.74 Brick work RCC Ceramic 12.71 L - 12.71 L Con Revenue 15 Quarters at Keelapaluvur Ariyalur Construction of RI Quarters cum office @ Keelapalur 2014-15 1 9.81X6.39 Brick work RCC Ceramic 206.83 13.11 L 13.11 L Con Revenue 16 Ariyalur Construction of RI Quarters cum office @ Nagamangalam 2014-15 1 9.81X6.39 Brick work RCC Ceramic 206.83 12.95 L 12.95 L Con Revenue 17 Ariyalur O/o Asst. Commisioner (CT) 2014-15 1+2 651.50 BW in CM Rcc Morbonite 2149.95 112.98 L 112.98 L Con Comercial 18 Comercial Tax officer (Enforcement) at Ariyalur 19 Ariyalur Sub Treasury office @ Ariyalur 1 42 BW in CM Tiled CC -- Ariyalur VAO's office Cum Residence @ Thirumalapady 2002- GF 46.30 B.W in CM RCC Grono 134.27 411265.00 - ######## Govt. Revenue 20 03 Ariyalur VAO's office Cum Residence @ Koovagam 2002- GF 46.30 B.W in CM RCC Grono 138.90 405185.00 - ######## Govt. Revenue 21 03 Ariyalur VAO's office Cum Residence @ Nagamangalam 2002- 1 46.30 B.W in CM RCC Grono 134.27 4.14 0.48 4.62 Cons. Revenue 22 03 Ariyalur VAO's office Cum Residence @ Keelapalur. 2002- 1 46.30 B.W in CM RCC Grono 134.27 4.62 4.62 Cons. Revenue 23 03 Ariyalur VAO's office Cum Residence @ Thirumanur. 2002- 1 46.30 B.W in CM RCC Grono 134.27 4.05 0.57 4.62 Cons. Revenue 24 03 Ariyalur VAO's office Cum Residence @ Ariyalur (South). 2002- 1 46.30 B.W in CM RCC Grono 134.27 3.88 0.74 4.62 Cons. Revenue 25 03 Office Buildings, District Level Officers Building Ariyalur 2004 3 GF-36.16X BW CM1:6 RCC Ceramic 3663 225 Lakh Cons. Revenue (a) -05 52.40 Grano 3663 Road 2 lane - 146m FF- 36.16X Rajastan 3663 (b) 52.40 Single lane - 176 m SF-36.16X (c.) 52.40 Garage 2004 1 23.65X6.20 BW RCC Grano 483.88 225.00 Cons. Revenue (d) -05 Scooter shed 2004 1 20.03X5.00 CM1:5 RCC Grano 210.32 225.00 Cons. Revenue (e) -05 Cycle stand 2004 1 15.20X4.00 CM1:5 RCC Grano 127.62 225.00 Cons. Revenue (f) -05 Pump room 2004 1 1.96X2.26 CM1:5 RCC Grano 9.30 225.00 Cons. Revenue (g) -05 Ariyalur Dist. Munsif Court @ Ariyalur 1884- 1 888.20 Brick in Terraced SQ bricks and 3470.64 18079 1971 20050 - Judicial 26 1933 Chunambu and Tiled paralistone Dept. Bar room 1884 1 88.00 Brick in Tiled Cement Concrete 386.74 1017.00 - 1017.00 - --do-- (a) Chunambu Ryots shed (New) 1913 86.89 Brick in Tiled Cement Concrete 324.65 1500 1500.00 - --do-- (b) Chunambu Cattle shed 1923 1 38.00 Brick in Pan Tiled Gravel 101.42 638 638 - --do-- (c.) Chunambu Compound wall Not -- 459 FT Brick in -- -- - 918 - 918 - --do-- (d) Known Chunambu Latin for office Establishment Not 1 7.06 CI Sheet CI Sheet Gravel 23.18 133 - 133 - --do-- (e) Known Latin for District Munsif 1914 - 4.36 CI Sheet CI Sheet Concrete 10.31 82 - 82 - --do-- (f) well 6' 0" square -- -- 6 FT Brick in -- -- -- -- -- -- -- -- (g) Chunambu Combined Tiffin shed & Cart shed 1929 -- 59.29 Brick in Flat pan tiled Cement and 184.39 2545 - 2545 -- -- (h) Chunambu Gravel (i) Two seated latrine 1958 -- 9.1 BW in LM Open Cement - 723 - 723 -- -- (j) Value of land.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages56 Page
-
File Size-