Initial Environmental Examination Project Number: 40648-034 April 2019 IND: Infrastructure Development Investment Program for Tourism (IDIPT) - Tranche 3 Package : Conservation Work of Moonak Fort, District-Sangrur Submitted by: Program Management Unit, Punjab Heritage and Tourism Board, Chandigarh This initial environment examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Initial Environmental Examination Project Number: 40648-034 ADB loan Number:3223-IND April, 2019 Infrastructure Development Investment Program for Tourism (IDIPT) (Tranche-3) - Punjab Subproject – Conservation Work of Moonak Fort, District-Sangrur (Package No: PB/IDIPT/T3/06/43) Prepared by the Government of Punjab for the Asian Development Bank. This IEE is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff. ABBREVIATIONS ADB : Asian Development Bank AAQ : Ambient Air Quality CTE : Consent to Establish CTO : Consent to Operate DSC : Design and Supervision Consultant DPR Detailed Project Report DoT : Department of Tourism EA : Executing Agency EARF : Environment Assessment & Review Framework EIA : Environmental Impact Assessment EMP : Environmental Management Plan GoI : Government of India GoP : Government of Punjab GRC : Grievance Redress Committee H&S : Health and Safety IEE : Initial Environmental Examination IDIPT : Infrastructure Development Investment Program for Tourism LGC : Local Grievance Committee MoEF& CC : Ministry of Environment, Forest and Climate Change MC : Municipal Council NAAQS National Ambient Air Quality Standard NoC : No Objection Certificate NGO : Non-Governmental Organization O&M : Operation and Maintenance PIU : Project Implementation Unit PHTPB : Punjab Heritage and Tourism Promotion Board PMC : Project Management Consultant PMU : Project Management Unit PPCB Punjab Pollution Control Board REA : Rapid Environmental Assessment SPS : Safeguard Policy Statement SLEC : State Level Empowered Committee TSS : Total Suspended Solids UT : Union Territory UNWTO : United Nations World Tourism Organization VOC‟s : Volatile Organic Compounds i Table of Contents EXECUTIVE SUMMARY ...................................................................................................... 1 I. INTRODUCTION ....................................................................................................... 4 A. Background ................................................................................................................ 4 B. Purpose of the IEE ..................................................................................................... 4 II. DESCRIPTION OF THE SUB PROJECT .................................................................. 5 A. Existing Condition and Need for the Subproject .......................................................... 5 B. Scope of Work ............................................................................................................ 8 C. Implementation Schedule ........................................................................................... 9 III. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK ..................................... 11 A. ADB Policy ............................................................................................................... 11 B. National and State Laws ........................................................................................... 11 IV. DESCRIPTION OF ENVIRONMENT ....................................................................... 14 a) Physical Environment ............................................................................................... 14 b) Social Profile ............................................................................................................ 17 V. SCREENING OF POTENTIAL ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ....................................................................................................................... 19 A. Land Acquisition and Resettlement Impacts ............................................................. 19 B. Environmental Impacts ............................................................................................. 19 C. Pre-construction Impacts and Mitigation Measures- ................................................. 20 VI. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE ........................... 26 A. ADB Disclosure Policy .............................................................................................. 26 B. Process for Consultation Followed ........................................................................... 26 C. Plan for Continued Public Participation ..................................................................... 26 VII. GRIEVANCE REDRESS MECHANISM .................................................................. 27 A. Composition and functions of GRC ........................................................................... 27 B. Approach to GRC: .................................................................................................... 28 VIII. ENVIRONMENTAL MANAGEMENT PLAN ............................................................ 29 A. Responsibility for EMP Implementation .................................................................... 29 B. EMP Tables .............................................................................................................. 32 C. Summary of Site and Activity-Specific Plans as per EMP ......................................... 48 IX. ENVIRONMENTAL MONITORING PROGRAM ...................................................... 48 X. CAPACITY BUILDING ............................................................................................ 49 XI. EMP IMPLEMENTATION COST ............................................................................. 52 XII. FINDINGS AND RECOMMENDATIONS ................................................................. 53 XIII. CONCLUSIONS ...................................................................................................... 53 ii List of Figures Figure 1: Location Map of Moonak Showing Subproject Site................................................. 6 Figure 2: Proposed subproject location of Moonak Fort, District-Sangrur .............................. 7 Figure 3: Proposed Conservation work of Moonak Fort, District-Sangrur .............................. 8 Figure 4: Site Plan-Conservation of Moonak Fort, District-Sangrur ..................................... 10 Figure 5: Grievance Redress Mechanism in IDIPT, Punjab ................................................. 28 Figure 6: EMP Implementation Arrangement for IDIPT ....................................................... 31 List of Tables Table 1: Overview of Moonak (NP) Nagar Panchayat ........................................................... 5 Table 2: Scope of Work in Conservation of Fort Area Moonak .............................................. 8 Table 3: Environmental Regulatory Compliance .................................................................. 12 Table 4:Groundwater Quality in Sangrur ............................................................................. 14 Table 5: Ambient Air Quality in Sangrur .............................................................................. 16 Table 6: Noise Quality in Sangrur ....................................................................................... 17 Table 7: Change in Literacy Rate 2001 to 2011 Moonak (NP) ............................................. 18 Table 8: Percentage of Work Population-Moonak (NP) ...................................................... 18 Table 9:Pre-construction EMP Table ................................................................................... 33 Table 10: Construction EMP Table ...................................................................................... 37 Table 11: Post-Construction EMP Table ............................................................................. 46 Table 12: Site- and Activity-Specific Plans/Programs as per EMP....................................... 48 Table 13:Indicative Environmental Monitoring Program ...................................................... 48 Table 14: Training Modules for Environmental Management (common for entire project) ... 50 Table 15: Indicative EMP Budget ........................................................................................ 52 Appendixes Appendix – 1 : Rapid Environmental Assessment (REA) Checklist Appendix – 2 : Sample Outline of Spoil Management Plan (SMP) Appendix – 3 : Sample Traffic Management Plan (TMP) Appendix – 4 : Details of Public Consultations Appendix – 5 : Sample Environmental Site Inspection Report Appendix – 6 : Sample Semi-Annual Environmental Monitoring Report Template Appendix – 7 : Summary Monitoring Table Appendix – 8 : Sample Grievance Redress Form Appendix – 9 : Archaeological Monitoring and Chance Encounter Protocol Appendix – 10 : Photos of Project Sites iii EXECUTIVE SUMMARY 1. Background: The Infrastructure Development
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages88 Page
-
File Size-