1. General Information 2. Access Roads 3. Characteristics of the Facility

1. General Information 2. Access Roads 3. Characteristics of the Facility

Information about the free facility (area) 1. General information Name of the facility Production facility of PSC «Ukrpiezo» Name of the settlement: region Cherkasy district settlement, street Cherkasy city, 10, Sumgaitska str. geographical whereabouts 49.4365, 32.0168 Type of ownership Private Owner: Name PSC «Ukrpiezo» Code EDRPOU 14313889 Legal address Cherkasy city, 10, Sumgaitska str. Postal address 18000, Cherkasy city, 10, Sumgaitska str. Tel. Fax, e-mail +380(472) 66-16-10, +380 (472)36-03-00 [email protected] Website http://ukrpiezo.b-i.com.ua 2. Access roads The name and distance to the nearest district - centre, km The name and distance to the nearest regional Cherkasy city centre, km Availability of railway tracks (yes/no) no The name of the nearest railway cargo station and Cherkasy station, 5,0 the distance to it, km Availability of access roads with tough covering yes for trucks The distance to the highway of national Н-01 Kyiv-Znamianka importance, km Н-16 Zolotonosha-Cherkasy-Smila-Uman Р-10 Kaniv-Chyhyryn-Kremenchuk The name of the nearest airport and the distance to «Cherkasy», 5,0; it, km «Boryspil», 150,0 Availability of public transport to the facility Buses №№ 6, 13, 22, 25, 33, 36 (buses, trains) Trolley-bus № 10 3. Characteristics of the facility Year of the commissioning 1983 Usage: previous Production facility of PSC «Ukrpiezo» present Not used Number of storeys of the building where the 3 facility is situated On what floor the facility is situated 3 The size of a facility: Length, m 125,0 Width, m 36,0 Height, m 4,8 Area (thousand m2 ) 4,5 Availability of additional facilities (auxiliary, office), their area (thousand m2 ) warehouses administrative buildings others 2,5 Total area of the territory where the facility is 80,0 (8 ha) situated, m2 Engineering infrastructure: Gas supply, productivity (m3/hour) No up to gas distribution station of high pressure - 1,35 km Electricity supply, capacity, KW/hour) yes 1600 KW Water supply, productivity (m3/hour) Yes 7-10 Sewerage system, productivity (m3/hour) Yes 7-10 Is it possible to provide stationary and mobile yes telephone connection (yes/no) How the heating may be provided (describe) Yes (power station, electric heating) How loading and unloading operations are Auto loader equipment, provided 2 elevators × 5 tons Technical condition (perfect, good, average, poor) average What are the main works to be done to prepare the Repair of production facility, engineering utilities area for the production process and power equipment Can these works be done at the expense of the Mixed financing owner Additional information - 4. Information about contact person Name, surname Hennadiy Movsikov Position Director general Language of communication Ukrainian, Russian Tel. office, fax +380 (472) 66-16-10; +380 (472) 36-03-00 Mob.tel. - E-mail [email protected] 5. Conditions of giving to the investor Sale, leasing, permanent use, etc. leasing Rental price a year, US dollars/ m2 On agreement Sale price, US dollars/ m is being discussed Date of information preparation (month, year) July 2018 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us