Contract in Brief Challenge Inverkip Power Station Was an Oil-Fired Power Station in Inverclyde, on the West Coast of Scotland

Contract in Brief Challenge Inverkip Power Station Was an Oil-Fired Power Station in Inverclyde, on the West Coast of Scotland

Contract in Brief Challenge Inverkip power station was an oil-fired power station in Inverclyde, on the west coast of Scotland. Built in the 1970's, it was rarely used due to soaring oil Location: prices. Inverkip, Inverclyde The site to be decommissioned was the cable run from the former Inverkip Former Inverkip Power Station Power station, Inverclyde to the live 400kv Inverkip switching station. The Power Station had been demolished to slab level by Brown and Mason, leaving Client: the redundant 400kv oil filled cables that run from the former power station up Brown And Mason to the 400 KV switching station. There were three circuits, three cables per circuit identified as copper cores, paper insulated and aluminium sheathed. ( Scottish Power Asset) There were approximately 49 control cables that follow the same route. The 400kv cables are oil filled and oil had been partially removed from the lower Contract Start: Section (from power station to railway line). The upper section was still full of oil. This was a liability for Scottish Power. The cable route was through 27 January 2014 woodland, cable tunnels, ducting under Network rail, railway line and through Duration: farmland. 16 weeks Gilmerton Land Services (GLS) Solution Services Provided: Once as laid drawings had been received, GLS performed a full site survey to establish a proposed scope of works. As a result we were able to offer a lump Site survey sum credit of £126,500.00 to Brown and Mason to allow for work to Vegetation Removal commence at no risk or cost to the client. Radio detection - Cable location The site was cleared of trees/vegetation prior to bird nesting. Oil was purged Establishment of other from the 400kv cables, all cable removed and ground re-instated in stages working up towards 400kv switching station. existing live services Excavation Purging of oil filled cables Oil Testing Scope of works Working under Live 400kv •Tree removal and chipping OHL - HSE GS6 Guidance •Purging of oil from 400kv cables approx. 10,000litres Traffic Management - chapter 8 •Excavation of 3 trenches approx. 800m each to access cables Cable recovery - Removal of •Removal of all 3 circuits and 49 control cables all redundant cables Confined space work •Cable removal from Tunnels - confined space works Recycled From Site: Results •Scrap cable for recycling 270 GLS were able to remove all oil filled cable and associated control cables, thus Tonnes removing the environmental liability and delivering real value to Scottish Power •Recovered Cable Oil for recycling 10,000 Litres .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us