CHAPTER 9: FLOOD RISKS Miriam Middelmann, Bruce Harper and Rob Lacey

CHAPTER 9: FLOOD RISKS Miriam Middelmann, Bruce Harper and Rob Lacey

9.1 CHAPTER 9: FLOOD RISKS Miriam Middelmann, Bruce Harper and Rob Lacey The Flood Threat A simple definition of flooding is water where it is not wanted (Chapman, 1994). Four different mechanisms can cause flooding including heavy rainfall, storm surge, tsunami and dam failure (ARMCANZ, 2000). In this chapter we discuss flood risk associated with heavy rainfall, and briefly, flood risk associated with dam failure. Riverine flooding occurs when the amount of water reaching the watercourse or stream network exceeds the amount of water which can be contained by the network and subsequently water overflows out onto the floodplain. Several factors influence whether or not a flood occurs, including: • the total amount of rainfall falling over the catchment; • the geographic spread and concentration of rainfall over the catchment, i.e. spatial variation; • rainfall intensity, duration and temporal variation; • antecedent catchment and weather conditions; • ground cover; • the capacity of the watercourse or stream network to carry the runoff; and, • tidal influence. This complex set of factors influences whether or not flooding occurs in a catchment, consequently it is difficult to define the causes or the impacts of an ‘average’ flood. Put simply, no two floods in the same catchment are ever identical. To overcome this problem, floodplain managers and hydraulic engineers rely on a series of design flood events and historical rainfall and flood level information. It is upon these that this report is based. Localised and/or flash flooding typically occurs when intense rainfall falls over a small sub- catchment which responds to that rainfall in six hours or less. In urban or rural areas where drainage is poor, the risk of localised flooding is high under such circumstances. Widespread flooding, by contrast, occurs following rainfall of high intensity or long duration over the whole, or a large proportion of a catchment. Runoff is typically less in areas where the percentage of vegetation is high, as vegetated areas allow high infiltration until the earth is saturated. Where the ground is pre-saturated, such as following a long wet period, medium rainfall events may then cause flooding as runoff begins almost immediately. Flood levels in urban areas quickly rise where the percentage of impermeable surfaces in the local catchment, such as buildings, roads and car parks, is high. On sloping concrete and bitumen surfaces, for example, runoff is almost immediate. Average recurrence interval (ARI) or annual exceedance probability (AEP) are statistical benchmarks used for flood comparison. ARI is the average, or expected, value of the number of years between exceedances of flood events of a given magnitude (gauge height or discharge volume). AEP is the probability of a flood event of a given magnitude being equalled or exceeded in any one year. The Probable Maximum Flood (PMF) is the limiting-value flood which can reasonably be expected to occur. It is usually perceived as having an ARI of between 10 000 and 10 000 000 years (Nathan & Weinmann 1999, Laurenson 1994 in ARMCANZ, 2000). 9.2 Flood levels are typically related to the Australian Height Datum (AHD), which is approximately Mean Sea Level (MSL). Accordingly, the ‘gauge height’ of floods varies depending on the location of the gauge and its relative elevation in the floodplain. The depth of any flood is then calculated as the difference between the flood water level elevation and the local ground elevation relative to the AHD. Cost of flooding Major flooding causing inundation of large areas, isolating towns and disrupting road and rail links occurs on average about every ten years somewhere in the South-East Queensland region. Smith (1998) estimated that around 35% of the buildings at risk from flooding in Australia are located in Queensland, with 21% being in the South-East Queensland region. The large numbers of buildings at risk of flooding in South-East Queensland is exacerbated by the absence of State- wide floodplain management regulations which might typically aim to preclude residential development in areas subject to flooding up to the 1% AEP (100 year ARI) level. In Queensland such regulations are left to individual Local Government Authorities (LGAs) to establish. The average economic cost of urban flooding (stormwater and mainstream flooding1) in Australia is estimated to be in the order of $200 million per year at 1998 dollar terms (ARMCANZ 2000). The estimate is however based on the DPIE (1992) study and significantly underestimate flood damage. The more recent study by Smith (1998) estimated annual average urban flood damage in Queensland alone at about $100 million. Economic loss due to flooding varies widely from year to year and is dependent on a number of factors, for example, flood severity and location. During the 1974 Brisbane floods, for example, the flood damage in 1998 values was $700 million, however, damage was much lower in both previous and subsequent years (ARMCANZ, 2000). In recent years good work has been undertaken by a number of local governments to minimise flood risk through stringent development application guidelines, however, flooding remains a large problem for many areas across the region. The Flood Phenomenon Heavy rainfall capable of causing flooding (flash and non-flash) in South-East Queensland can arise from a number of different meteorological mechanisms, as described below: Severe Thunderstorms • isolated storms typically cause flash flooding in relatively small catchments • organised systems may extend to affect more than one catchment Tropical Cyclones • capable of causing widespread flooding across the South-East region • typically heaviest rainfall is associated with coast-crossing and decaying phases 1 The dollar loss to buildings affected by mainstream flooding is significantly larger though the number of properties affected are less than for stormwater flooding. 9.3 • may interact with and draw the monsoon trough southwards creating an extensive rainfall event over the whole state (e.g. BoM, 1974 - refer to Figure 9.1) East Coast Lows • capable of causing widespread flooding across the South-East region (e.g. BoM, 1996) • more common in autumn and early winter • establish large scale moist onshore flow conditions • heavy rainfall triggered by upper level coupling creating large scale lifting of the onshore flow Other • fronts and troughs • low pressure systems • coastal convergence • high pressure intensification in the Tasman Sea, combined with upper trough interaction. All of these events are also influenced by the regional topography which provides significant orographic lift to assist the creation of favourable conditions for heavy rainfall. The detailed characteristics of these meteorological situations is discussed in Chapters 4 (cyclones), 5 (east coast lows) and 6 (thunderstorms). Figure 9. 1 Rainfall isohyets (mm) over the five day period of the January 1974 floods Major river systems in South-East Queensland South-East Queensland is crossed by a number of major river systems and numerous creeks. Typically the headwaters rise in the Great Dividing Range to the west and the rivers traverse the coastal plains in a generally eastward direction, emptying into Moreton Bay, The Broadwater or the Pacific Ocean. The rivers are fed by an average annual rainfall which varies between 800 mm 9.4 and 1500 mm across the region and has helped create a particularly fertile region which, prior to European settlement, supported a large number of aboriginal communities. From the earliest days of European settlement, many rivers provided not only abundant fresh water supplies and fertile adjacent lands but also served as important transportation corridors. In the past 100 years the extensive urban development of the region has impinged onto many areas of the floodplains and several river courses have been altered through the creation of water storages in their upper reaches and dredging or reclamation works in their lower reaches. An overview of the major river catchments in South-East Queensland was shown in Figure 2.3 and in more detail in Figures 9.2 – 9.7. The northern coastal region is drained by the Caboolture River, Burpengary Creek, North and South Pine Rivers and the northern creeks of Brisbane which flow to Moreton Bay. The Brisbane-Bremer River system is the major catchment in the region and includes a number of urban creeks including Oxley and Bulimba Creeks on the southern side and Moggill and Enoggera Creeks in the north. The southern coastal region is traversed by the Logan River and its major tributary, the Albert River, which empties into the southern extent of Moreton Bay, whilst the Pimpama, Coomera and Nerang River systems empty into The Broadwater. An extensive network of rainfall and river height reporting stations cross the region that provide data on flood events used for both operational warnings and investigations into the probability of occurrence of extreme floods. Caboolture River and Burpengary Creek System The Caboolture River is situated about 40 km north of Brisbane and has a total catchment area of 370 square kilometres (CSC 1994a). It rises in the D’Aguilar Ranges and flows in an easterly direction towards the coast, passing through Caboolture and entering Deception Bay (the northern part of Moreton Bay) near the township of Beachmere. Its major tributaries include Wararba, Sheep Station, King John and Lagoon Creeks. The topography is steep in the upper portions but flattens out progressively towards

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    31 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us