Information Request Format Template

Information Request Format Template

TABLE OF CONTENTS INFORMATION REQUEST NO. 2 ............................................................................................ 2 ENGINEERING MATTERS .................................................................................................................. 2 2.1 Trenchless Watercourse Crossings Feasibility Studies .......................................... 2 2.2 Trenchless Crossings - Construction Risk Assessment ........................................... 3 2.3 Trenchless Crossings – Contingency Plans ............................................................ 5 ENVIRONMENT MATTERS ................................................................................................................ 6 2.4 Wetlands .................................................................................................................. 6 2.5 Little Smoky Caribou Range ................................................................................... 7 SOCIO-ECONOMIC MATTERS ............................................................................................................ 8 2.6 Historical Resources ............................................................................................... 8 1 NOVA Gas Transmission Ltd. (NGTL) Sections 58 and 52 National Energy Board Act (NEB Act) NGTL 2021 System Expansion Project (Project) File OF-Fac-Gas-N081-2018-03 02 Filed 20 June 2018 Hearing Order GH-003-2018 Information Request No. 2 Engineering Matters 2.1 Trenchless Watercourse Crossings Feasibility Studies Reference: i) NGTL, Application, Section 8.8.4 Watercourse and Road Crossing Construction, pages 8-9 to 8-10 (PDF Pages 133 to 134 of 244), A92619-1 ii) NGTL, Application, Appendices 8-1 and 8-2 Preliminary Feasibility Reports for Wapiti River and Smoky River Crossings (PDF pages 1 to 72 of 72), A92619-4 iii) NGTL, Application, Appendices 8-3 to 8-7 Preliminary Feasibility Reports for the Simonette River, Little Smoky River, McLeod River, Pembina River, and North Saskatchewan River Crossings (PDF pages 1 to 118 of 118), A92619-5 iv) NGTL, Additional Written Evidence, Section 2.1.3.1 Change of Proposed Construction Methodology for the Simonette River, page 2- 10 (PDF Page 19 of 74); Section 2.4 Terrain, Geotechnical and Hydrotechnical Assessments and Section 2.5 Watercourse Crossings, page 2-20 (PDF page 29 of 74), A96812-1 v) NGTL, Additional Written Evidence, Appendix 2-5 Wapiti Feasibility Report (PDF pages 1 to 47 of 47), A96812-6 Preamble: Reference i) states that NGTL will use both trenchless and trenched (isolated and open cut) crossing techniques to cross watercourses along the right of way (RoW). Trenchless crossing methods were originally proposed at the Wapiti River, Smoky River, Simonette River, Little Smoky River, McLeod River, Pembina River, and North Saskatchewan River. NGTL changed the primary crossing method for the Simonette River from a trenchless to a trenched method (Sections 2.1.3.1 and 2.5 of Reference iv). Reference i) states that a trenchless crossing method will also be used to cross Highway 11 in the Brewster Section, Highway 743 in the Karr Section, and Highway 672 and Highway 59 in the Valhalla Section. 2 NGTL has submitted preliminary feasibility reports for the proposed trenchless river crossings (References ii) and iii)). The preliminary feasibility reports contain horizontal directional drilling assessments for the crossings based on geological and existing borehole information in the area. Section 2.4 of Reference iv) states that the geotechnical program for the Smoky River, Little Smoky River, McLeod River, Pembina River and North Saskatchewan River is ongoing and that NGTL will submit updated trenchless feasibility reports when they become available. A revised feasibility report for the Wapiti River was provided (Reference v). The NEB (the Board) notes that the information used for these feasibility reports is general and lacks site specific data. Request: For the trenchless crossings at the Wapiti River, Smoky River, Little Smoky River, McLeod River, Pembina River, North Saskatchewan River, Highway 11, Highway 743, Highway 672 and Highway 59, please provide the following: a) The final selected trenchless crossing method that will be used; b) The geotechnical investigation reports performed by NGTL at all of the proposed trenchless crossing locations; c) The final feasibility reports based on the result of the geotechnical investigations performed at those locations; d) If for any of the trenchless river or highway crossings, the geotechnical investigation or feasibility studies have not yet been performed or ready, provide a timeline when these studies will be available. 2.2 Trenchless Crossings - Construction Risk Assessment Reference: i) NGTL, Application, Section 7.1.3 Project Component Tie-Ins and Routing (PDF pages 95 to 98 of 244), Section 7.6 Terrain, Geotechnical and Hydrotechnical Assessments (PDF page 120 of 244), Section 7.7 Pipeline Watercourse Crossings (PDF page 123 of 244), and Section 8.8.4 Watercourse and Road Crossing Construction (PDF page 133 of 244), A92619-1 ii) NGTL, Application, Appendices 8-1 and 8-2 Preliminary Feasibility Reports for Wapiti River and Smoky River Crossings (PDF pages 1 to 72 of 72), A92619-4 iii) NGTL, Application, Appendices 8-3 to 8-7 Preliminary Feasibility Reports for the Simonette River, Little Smoky River, McLeod River, Pembina River, and North Saskatchewan River Crossings (PDF pages 1 to 118 of 118), A92619-5 3 iv) NGTL, Additional Written Evidence, Appendix 2-5 Wapiti Feasibility Report (PDF pages 1 to 47 of 47), A96812-6 Preamble: Reference i) states that trenchless crossings will be considered at watercourse and highway crossings. References ii), iii), and iv) provide a preliminary and basic assessment of the risks and the main possible mitigation strategies developed to minimize the challenges that may arise during construction. The Board notes that in References ii), iii) and iv), the trenchless construction risk assessment results (i.e. low risk to very high risk) and explanations are not provided for before and after mitigation strategies are implemented. Request: For the trenchless crossings at the Wapiti River, Smoky River, Little Smoky River, McLeod River, Pembina River, North Saskatchewan River, Highway 11, Highway 743, Highway 672 and Highway 59, please provide the following: a) The construction risk assessments and the risks associated with the selected trenchless method including the following: a.1) probability, consequence and risk categories without any mitigation; and a.2) probability, consequence and risk categories with proposed mitigation. b) Descriptions of risk categories, including: b.1) probability ratings or categories; b.2) consequence ratings or categories, as well as the factors considered (e.g. public and/or workers safety); and b.3) risk categories, as well as the response(s) required for each risk category. c) If applicable, for each identified risk that is categorized as “high” or “very high” after mitigation: c.1) estimated probability of failure associated with the identified risk based on the previous experience; c.2) detailed description of the consequence; and c.3) if the risk is associated with high or very high level of public and/or workers safety, demonstrate that NGTL can safely conduct the construction activities. 4 2.3 Trenchless Crossings – Contingency Plans Reference: i) NGTL, Application, Section 8.8.4 Watercourse and Road Crossing Construction, pages 8-9 to 8-10 (PDF pages 133 to 134 of 244), A92619-1 ii) NGTL, Application, Appendices 8-1 and 8-2 Preliminary Feasibility Reports for Wapiti River and Smoky River Crossings (PDF pages 1 to 72 of 72), A92619-4 iii) NGTL, Application, Appendices 8-3 to 8-7 Preliminary Feasibility Reports for the Simonette River, Little Smoky River, McLeod River, Pembina River, and North Saskatchewan River Crossings (PDF pages 1 to 118 of 118), A92619-5 iv) NGTL, Additional Written Evidence, Section 2.1.3.1 Change of Proposed Construction Methodology for the Simonette River, page 2- 10 (PDF Page 19 of 74) and Section 2.5 Watercourse Crossings, page 2-20 (PDF page 29 of 74), A96812-1 v) NGTL, Additional Written Evidence, Appendix 2-5 Wapiti Feasibility Report (PDF pages 1 to 47 of 47), A96812-6 Preamble: Reference i) states that trenchless methods will be used to cross the Wapiti River, Simonette River, Smoky River, Little Smoky River, McLeod River, Pembina River, and North Saskatchewan River. The primary crossing method for the Simonette River was later changed from a trenchless to a trenched method (Reference iv). Pipe thrusting was discussed as a contingency for the proposed Horizontal Directional Drilling (HDD) of the Smoky River (Reference ii), and Little Smoky River, McLeod River and North Saskatchewan River (Reference iii). References ii) and iii) also state that for these rivers, an isolated construction method is proposed if the trenchless method fails. For the Pembina River, the contingency plan was identified as an isolated construction method (Reference iii). No contingency plan was described for the Wapiti River (Reference v) or any of the proposed trenchless highway crossings at Highway 11, Highway 743, Highway 672 and Highway 59. The Board requires additional details regarding contingency plans. Request: For the trenchless crossings at the Wapiti River, Smoky River, Little Smoky River, McLeod River, Pembina River, North Saskatchewan River, Highway 11, Highway 743, Highway 672 and Highway 59, please provide the following: a) A proper

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us