Capital Projects Non-Structural Mitigation Highlights.Pdf

Capital Projects Non-Structural Mitigation Highlights.Pdf

Seismic Retrofit and Replacement of Fire Stations* The 2003 Fire Facilities and Emergency Response Levy funded the replacement, retrofitting, or S renovation of 32 Seattle fire stations, in addition to a new Emergency Operations Center. T $303 million C Fire Station 10/EOC/FAC E J Bridge Retrofits In 2006, Seattle voters passed a nine-year, $365 million levy for transportation O maintenance and improvements known as Bridging the Gap. The levy funded the rehabilitation, replacement, or seismic retrofit of 12 bridges*: R Ballard Bridge - Fauntleroy Expressway Bridge - Yesler Bridge - E. Marginal Way Bridge - 45th St Viaduct - Airport Way S Viaduct - Fairview Ave N. – Dr. Jose Rizal Bridge - 15th Ave P Bridge - East Duwamish Waterway Bridge - South Albro Place - King St Station Bridges Additional bridges are being retrofitted under the 2015, $930 million Levy to Move Seattle. L North Queen Anne Drive Bridge*** $1.2 million in grant funding North Queen Anne Drive Bridge A IT Seismic Retrofit of City Owned Community Spaces*** P FEMA Mitigation funds have been used to retrofit several key facilities, including the Jefferson and Queen Anne community centers, and the South Lake Union Armory building, which currently houses MOHAI. A $2.8 million in grant funding C Jefferson Community Center Primary funding sources: *City of Seattle Levy ** Federal, State of Washington, City of Seattle, Port of Seattle, gas taxes & tolls *** FEMA/State of Washington mitigation grant & local match ****City of Seattle capital funding Large Infrastructure Projects** The new Elliot Bay seawall, completed in 2017, has been built to meet current seismic standards, S protecting public safety and acting as the foundation for Seattle’s new waterfront. T $1 billion C Elliot Bay Sea Wall E J O SR-99 Tunnel** R The two mile long SR 99 tunnel replaced the Alaskan Way Viaduct. Because of the viaduct’s age and vulnerability to earthquakes, replacing it was critical to public safety. P $3.3 billion L SR-99 Tunnel (Viaduct Replacement) A IT Facility Replacement Projects**** P The City of Seattle has replaced outdated and seismically unsafe public buildings with new ones built to modern codes and new “green” design standards. The new City Hall ($73 million) was A completed in 2003 and the Seattle Justice Center ($92 million) in 2002. C City Hall Primary funding sources: *City of Seattle Levy ** Federal, State of Washington, City of Seattle, Port of Seattle, gas taxes & tolls *** FEMA/State of Washington mitigation grant & local match ****City of Seattle capital funding N Community Education*** O The City conducted a public education pilot project focused on the risks posed by Unreinforced I Masonry Buildings (URMs). One result was the design of a mitigation infographics brochure, with T tailored messages for three audiences: Building Owners, Business Owners, and Residential Tenants. These materials are now a standard part of emergency management outreach A programs. G $72 K I URM Brochure T I M Urban Flood mapping*** L In 2011, the City initiated a project to improve the identification and prioritization of urban A flooding “hot spots” in Seattle. The outcome is better targeting of maintenance and mitigation efforts to reduce the impacts of urban flooding, which can result from high R intensity rainfall. U $208 K T C Urban Flooding Map U R Gas Shut Off Valves*** T To reduce the chance of earthquake-related fires, natural gas shut off valves were installed at S thirty-five city facilities. This protects not only the buildings themselves – including fire and - police stations, key operations facilities, and community centers – but also the employees and residents who use them on a daily basis. N $200 K O Central Area Senior Center N Primary funding sources: *City of Seattle Levy ** Federal, State of Washington, City of Seattle, Port of Seattle, gas taxes & tolls *** FEMA/State of Washington mitigation grant & local match ****City of Seattle capital funding.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us